Plan Review Details - Permit 00020711
Plan Review Stops For Permit 00020711
Review Stop E ELECTRICAL
Rev No 2 Status P Date 2000-06-12 Cont ID  
Sent By dpalmer Date 2000-06-12 Time 12:13 Rev Time 0.00
Received By dpalmer Date 2000-06-12 Time 12:13 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2000-03-20 Cont ID  
Sent By dpalmer Date 2000-03-20 Time 18:44 Rev Time 0.00
Received By dpalmer Date 2000-03-20 Time 18:44 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2000-02-26 Cont ID  
Sent By jleech Date 2000-02-26 Time 14:07 Rev Time 0.50
Received By jleech Date 2000-02-26 Time 14:07 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 4 Status P Date 2000-06-30 Cont ID  
Sent By tlarge Date 2000-06-30 Time 07:44 Rev Time 0.25
Received By tlarge Date 2000-06-30 Time 07:44 Sent To  
Notes
2001-01-08 00:00:00REVISED SANITARY RISER.

Review Stop P PLUMBING
Rev No 3 Status P Date 2000-06-12 Cont ID  
Sent By tlarge Date 2000-06-12 Time 14:07 Rev Time 0.30
Received By tlarge Date 2000-06-12 Time 14:07 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status F Date 2000-06-07 Cont ID  
Sent By tlarge Date 2000-06-07 Time 20:38 Rev Time 0.30
Received By tlarge Date 2000-06-07 Time 20:38 Sent To  
Notes
2001-01-08 00:00:00SIZING OF GAS SYSTEM SHALL COMPLY W/SGC.
  
 SUBMIT COPY OF SIZING TABLE USED IN
 SYSTEM DESIGN OR REFERENCE APPLICABLE ON
 PLAN.

Review Stop P PLUMBING
Rev No 1 Status P Date 2000-02-19 Cont ID  
Sent By tlarge Date 2000-02-19 Time 08:11 Rev Time 0.33
Received By tlarge Date 2000-02-19 Time 08:07 Sent To  
Notes
***NONE***

Review Stop R ROOF PLAN REVIEW
Rev No 3 Status F Date 2000-06-30 Cont ID  
Sent By jgomez Date 2000-06-30 Time 18:52 Rev Time 0.50
Received By jgomez Date 2000-06-30 Time 18:52 Sent To  
Notes
2001-01-08 00:00:00CHECKLIST:
 1-DRAWINGS NOW SHOW OUTSWING ENTRY DOORS
 WHERE IS THE PRODUCT APPROVAL?
 2-STRUCTURAL DRAWINGS TO BE SIGNED,
 SEALED AND DATED BY THE STRUCTURAL
 ENGINEER OF RECORD (ALBERT P. KWAN).

Review Stop R ROOF PLAN REVIEW
Rev No 2 Status F Date 2000-06-16 Cont ID  
Sent By jgomez Date 2000-06-16 Time 15:49 Rev Time 0.50
Received By jgomez Date 2000-06-16 Time 15:49 Sent To  
Notes
2001-01-08 00:00:00CHECKLIST:
 1-ROYAL PALM ALUMINUM LETTER FROM THE
 MANAGER OF ENGINEERING TO BE SIGNED,
 SEALED AND DATED.
 2-ENTRY DOORS PRODUCT APPROVAL:
 -THE ENGINEER WHO SEALED THE PRODUCT
 APPROVAL IS NOT THE ENGINEER OF RECORD
 FOR THIS HOUSE.
  
  
  
 NOTE:
 TO AVOID UNNECESSARY DELAYS PLEASE TELL
 YOUR ENGINEERS TO PROVIDE ALL THE
 INFORMATION REQUIRED BY THE DEPARTMENT
 OF BUSINESS AND PROFESSIONAL REGULATION
 WHEN SUBMITTING DOCUMENTS FOR PUBLIC
 RECORDS.

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status P Date 2000-04-08 Cont ID  
Sent By jgomez Date 2000-04-08 Time 17:21 Rev Time 2.50
Received By jgomez Date 2000-04-08 Time 17:20 Sent To  
Notes
2001-01-08 00:00:00APPROVED WITH PROVISO:
 1-PROVIDE SURVEY WITH BUILDING LAYOUT.
 2-PROVIDE PRODUCT APPROVAL FOR ROUND AND
 ARCHED WINDOWS.
 3-PROVIDE COPIES OF ALL ENGINEERED WALL
 PANELS BY ROYAL WALL SHOWING ALL SPECS
 AND REINFORCING. SIGNED, SEALED AND
 DATED.
 4-PROVIDE COMPLETE ROOF FRAMING PLAN
 INDICATING UPLIFT AND LATERAL LOADS
 AND SPECIFYING ANCHOR TO BE USED FROM
 THE ANCHOR SCHEDULE.
 5-RESUBMIT STORM PANELS INFORMATION.
 DRAWINGS DON'T MATCH PRODUCT APPROVAL.
 6-PROVIDE PRODUCT APPROVAL FOR ENTRY
 DOORS.

Review Stop Z ZONING
Rev No 1 Status P Date 2000-02-16 Cont ID  
Sent By gjoyce Date 2000-02-16 Time 11:12 Rev Time 0.25
Received By gjoyce Date   Time   Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved