Review Stop E ELECTRICAL
Rev No 1 Status F Date 2000-03-20 Cont ID  
Sent By dpalmer Date 2000-03-20 Time 18:50 Rev Time 0.00
Received By dpalmer Date 2000-03-20 Time 18:50 Sent To  
Notes
2001-01-08 00:00:00************** UNSAT ******************
  
 1)NOTE: NEED TO SUBMIT AIC RATING OF THE
 MAIN DISCONNECTS. MAINS MUST BE RATED
 FOR THE AVAILABLE FAULT CURRENT. PER
 110-9/110-10
  
 2)NOTE: PLEASE DRAW MAIN DISCONNECTS
 NEXT TO METER ON PLANS 215-5
  
 3)NOTE:PLEASE INDICATE ON RISER DIAGRAM
 EQUIPMENT GROUNDING CONDUCTOR REQ`D
 AFTER THE FIRST MEANS OF DISC. SIZE PER
 250-122
  
 4)NOTE:IF COLD WATER PIPE IN HOUSE IS
 GOING TO BE METAL THEN IT MUST BE
 INCLUDED AS PART OF THE GROUNDING ELEC-
 -TRODE SYSTEM. PER 250-50
  
 5)NOTE: PLEASE LIST ON PANEL SCHEDULE
 THE REQ`D BATH(S) CIRCUT(S). MUST BE
 20AMP AND #12 AWG REQ`D BY 210-11-C-3
  
 PLEASE SUBMIT ALL THE ABOVE INFORMATION
 FOR REVIEW AND APPROVAL. IF THERE ARE
 ANY QUESTIONS PLEASE CALL 659-8096
 EXT 8372

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2000-02-26 Cont ID  
Sent By jleech Date 2000-02-26 Time 13:29 Rev Time 0.35
Received By jleech Date 2000-02-26 Time 13:28 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2000-02-19 Cont ID  
Sent By tlarge Date 2000-02-19 Time 07:17 Rev Time 0.33
Received By tlarge Date 2000-02-19 Time 07:17 Sent To  
Notes
2001-01-08 00:00:00SUBMIT SIGNED AND SEALED SANITARY RISER
 FOR REVIEW.COUNTYWIDE AMENDMENTS TO SPC
 SEC.104.2.1.

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status F Date 2000-04-17 Cont ID  
Sent By fknapp Date 2000-04-17 Time 14:26 Rev Time 4.00
Received By fknapp Date 2000-04-17 Time 09:26 Sent To  
Notes
2001-01-08 00:00:00 
  
 ***************DENIED*******************
  
 SBC 104.2.2
  
 1)PROVIDE SOIL REPORT.
  
 2)PROVIDE CURRENT DESIGN CERTIFICATION
 FOR BUILDING CODE COMPLIANCE.
  
 3)PROVIDE OWNER/AGENT SIGNATURE ON
 ENERGY CALCULATIONS.
  
 4)PROVIDE 2 CURRENT COPIES OF SBCCI OR
 METRO DADE PRODUCT APPROVALS FOR ALL
 EXTERIOR DOOR ASSEMBLIES AND ALL ARCH
 TRANSOMS.
  
 5)BEFORE A PERMIT TO CONSTRUCT CAN BE
 ISSUED, IMPACT FEES MUST BE PAID TO PALM
 BEACH CO.,THE PERMIT PLANS STAMPED BY
 THEM AND THE RECEIPT ATTACHED TO THE
 PERMIT APPLICATION.

Review Stop Z ZONING
Rev No 1 Status P Date 2000-02-16 Cont ID  
Sent By gjoyce Date 2000-02-16 Time 10:42 Rev Time 0.25
Received By gjoyce Date   Time   Sent To  
Notes
***NONE***