Plan Review Details - Permit 00020363
Plan Review Stops For Permit 00020363
Review Stop E ELECTRICAL
Rev No 2 Status P Date 2000-03-15 Cont ID  
Sent By dpalmer Date 2000-03-15 Time 16:11 Rev Time 0.00
Received By dpalmer Date 2000-03-15 Time 16:11 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2000-03-08 Cont ID  
Sent By dpalmer Date 2000-03-08 Time 20:28 Rev Time 0.00
Received By dpalmer Date 2000-03-08 Time 20:28 Sent To  
Notes
2001-01-08 00:00:00**************** UNSAT *****************
  
 NOTES ON PLANS
 PLEASE CORRECT ENTIRE PANEL SCHEDULE.
 CORRECT WIRE SIZES, BRKRS, AND LOADS.
 MISSING OUTLET
 MISSING SMOKE DETECTOR

Review Stop M MECHANICAL (A/C)
Rev No 3 Status P Date 2000-08-30 Cont ID  
Sent By jleech Date 2000-08-30 Time 18:02 Rev Time 0.25
Received By jleech Date 2000-08-30 Time 18:02 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2000-03-16 Cont ID  
Sent By cthirben Date 2000-03-16 Time 14:42 Rev Time 1.00
Received By cthirben Date 2000-03-16 Time 14:41 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2000-02-26 Cont ID  
Sent By jleech Date 2000-02-26 Time 11:46 Rev Time 0.50
Received By jleech Date 2000-02-26 Time 11:46 Sent To  
Notes
2001-01-08 00:00:00DENIED;
 ALL PROBLEMS IN QUEST QUARTERS;
 1.FIRST FLOOR CFM'S REQUIRED FOR ALL
 DROPS.
 2.SECOND FLOOR, RETURN AIR NOT PERMITED
 IN BATHROOM.
 3.A/C UNIT TO SMALL FOR CFM'S SHOWN.
 790 CFM WITH ONE DROP MISSING
 CALCULATIONS. 1 1/2 TON A/H WILL
 PROVIDE ONLY 600 CFM.

Review Stop P PLUMBING
Rev No 2 Status P Date 2000-11-20 Cont ID  
Sent By jleech Date 2000-11-20 Time 16:59 Rev Time 0.33
Received By jleech Date 2000-11-20 Time 16:59 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2000-02-11 Cont ID  
Sent By tlarge Date 2000-02-11 Time 07:16 Rev Time 0.33
Received By tlarge Date 2000-02-11 Time 07:16 Sent To  
Notes
***NONE***

Review Stop R ROOF PLAN REVIEW
Rev No 2 Status P Date 2000-05-09 Cont ID  
Sent By rmcdouga Date 2000-05-09 Time 09:47 Rev Time 2.00
Received By rmcdouga Date   Time   Sent To  
Notes
***NONE***

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status F Date 2000-04-24 Cont ID  
Sent By rmcdouga Date 2000-04-24 Time 08:04 Rev Time 3.00
Received By rmcdouga Date   Time   Sent To  
Notes
2001-01-08 00:00:00DENIED
  
 1)DESIGN COMPLIANCE FORM SPECIFIES A
 MEAN ROOF HEIGHT TO BE 15',I CALCULATE
 IT TO BE 24'10" CLARIFY & RECALCULATE
 ALL UPLIFTS,PROVIDE CORRECTED FORM.
 2)EXTERIOR DOOR AT GUEST SUITE DOES NOT
 COMPLY WITH EGRESS REQUIREMENTS.EGRESS
 DOORS SHALL BE OF THE SIDE SWINGING
 TYPE AND SHALL PROVIDE A CLEAR OPENING
 OF NOT LESS THAN 32". 97SBC-1012.1
 3)PROVIDE ENERGY CALCS.AND MANUAL J FOR
 MAIN HOUSE
 4)PLANS INDICATE 50GAL WATER HEATER FORM
 600A-97 & EPL DISPLAY CARD INDICATE
 30 GAL. WATER HEATER,CLARIFY
 5)PROVIDE PRODUCT APPROVALS FOR INSWING
 EXTERIOR DOOR AT GUEST SUITE
 6)PROVIDE PRODUCT APPROVALS FOR STORM
 PANELS
 7)PROVIDE SOIL BEARING TEST REPORT PRIOR
 TO FIRST INSPECTION

Review Stop Z ZONING
Rev No 1 Status P Date 2000-02-09 Cont ID  
Sent By gjoyce Date 2000-02-09 Time 12:00 Rev Time 0.25
Received By gjoyce Date   Time   Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved