Plan Review Details - Permit 00020362
| Plan Review Stops For Permit 00020362 |
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2000-03-15 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2000-03-15 |
Time |
11:33 |
Rev Time |
0.00 |
| Received By |
dpalmer |
Date |
2000-03-15 |
Time |
11:33 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2000-03-08 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2000-03-08 |
Time |
20:06 |
Rev Time |
0.00 |
| Received By |
dpalmer |
Date |
2000-03-08 |
Time |
20:06 |
Sent To |
|
|
| Notes |
| 2001-01-08 00:00:00 | ************* UNSAT ******************* | | | | | | NOTES ON PLANS TO CORRECT ENTIRE PANEL | | | SCHEDULE FOR LOADS, WIRE SIZES ETC. | | | | | | SEE PLANS |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
P |
Date |
2000-08-10 |
|
|
Cont ID |
|
| Sent By |
cthirben |
Date |
2000-08-10 |
Time |
09:42 |
Rev Time |
1.00 |
| Received By |
cthirben |
Date |
2000-08-10 |
Time |
09:42 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
P |
Date |
2000-02-26 |
|
|
Cont ID |
|
| Sent By |
jleech |
Date |
2000-02-26 |
Time |
11:29 |
Rev Time |
0.35 |
| Received By |
jleech |
Date |
2000-02-26 |
Time |
11:29 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2000-02-11 |
|
|
Cont ID |
|
| Sent By |
tlarge |
Date |
2000-02-11 |
Time |
07:09 |
Rev Time |
0.33 |
| Received By |
tlarge |
Date |
2000-02-11 |
Time |
07:07 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
2 |
Status |
P |
Date |
2000-04-17 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2000-04-17 |
Time |
16:02 |
Rev Time |
3.00 |
| Received By |
rmcdouga |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2001-01-08 00:00:00 | ****************PROVISO***************** | | | 1)PROVIDE PRODUCT APPROVAL FOR STORM | | | PANELS PRIOR TO INSTALLATION |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
1 |
Status |
F |
Date |
2000-03-17 |
|
|
Cont ID |
|
| Sent By |
jcaloger |
Date |
2000-03-17 |
Time |
12:34 |
Rev Time |
1.50 |
| Received By |
jcaloger |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2001-01-08 00:00:00 | DESIGN COMPLIANCE FORM SPECIFYS SBC 1997 | | | THE NOTES ON PLAN S-2.1 SPECIFYS ASCE 7- | | | 93. CLARIFY WHICH DESIGN CRITERIA WAS | | | USED.NOTE THAT ASCE 7-93 IS INVALID | | | EDITION & ASCE 7-95 IS THE VALID CRITERI | | | ALSO NOTE THAT ASCE 7-95 CLASSIFYS OUR | | | LOCATION IN A 145 MPH ZONE. | | | | | | THERE ARE NOTES ON THE PLAN THAT SPECIFY | | | THAT RATIONAL ANALYSIS WAS USED IN THE | | | DESIGN. CLARIFY HOW THE WIND PRESSURES | | | WERE DETERMINED USING THIS METHOD. | | | | | | | | | DESIGN PARAMETERS SPECIFYS REQUIRING | | | A 2500 PSF SOIL BEARING PRESSURE AND ON | | | PLAN S1 THE SOIL PRESSURE STATEMENT | | | SPECIFYS A 2000 PSF. CLARIFY | | | | | | | | | THE DESIGN COMPLIANCE FORM SPECIFYS A | | | MEAN ROOF HEIGHT OF 15 FEET. I CALCULATE | | | THE MEAN ROOF HT TO BE 16.6.CLARIFY | | | | | | | | | PLAN S-2.1, ROOF TRUSS SUPERLOADS BOX | | | SPECIFYS A BASIC WIND PRESSURE OF 26.3. | | | THIS PRESSURE DOES NOT COINCIDE WITH THE | | | PRESSURES IN TABLE 1606.2A SBC FOR A | | | MEAN ROOF HT OF 15 FEET. | | | | | | PROVIDE THE CALCULATIONS FOR ATTACHING | | | THE ROOF TILES AS PER THE PRODUCT APPROV | | | SEE TABLE 2 | | | | | | NEEDS ENERGY CALCULATIONS FORM 600 |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2000-02-09 |
|
|
Cont ID |
|
| Sent By |
gjoyce |
Date |
2000-02-09 |
Time |
11:13 |
Rev Time |
0.25 |
| Received By |
gjoyce |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
|