Plan Review Details - Permit 00011168
Plan Review Stops For Permit 00011168
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2000-03-18 Cont ID  
Sent By fknapp Date 2000-03-18 Time 17:13 Rev Time 2.00
Received By fknapp Date 2000-03-18 Time 17:13 Sent To M
Notes
2001-01-08 00:00:00 
  
 ****************PROVISO*****************
  
 SBC 104.2.2
  
 1)PROVIDE 2 CURRENT COPIES OF SBCCI OR
 METRO DADE PRODUCT APPROVALS FOR STORM
 PANELS WITH INSTALLATION SCHEDULE AND
 KEY PLAN WITH SPECIFIC ANCHORS TO BE
 USED UNDER SEPERATE PERMIT.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2000-02-24 Cont ID  
Sent By fknapp Date 2000-02-24 Time 08:57 Rev Time 2.00
Received By fknapp Date 2000-02-24 Time 08:56 Sent To  
Notes
2001-01-08 00:00:00 
 ****************DENIED******************
  
 SBC 104.2.2
  
 1)PROVIDE 2 CURRENT COPIES OF SBCCI OR
 METRODADE PRODUCT APPROVALS FOR ALL
 EXTERIOR DOORS BEING USED.
  
 2)PROVIDE CONSTRUCTION DETAILS WITH
 DIMENSIONS,MATERIALS TO BE USED AND
 SCOPE OF WORK TO BE DONE.
  
 3)PROVIDE ENERGY CALCULATIONS
  
 4)PROVIDE SPECIFIC WINDOW AND DOOR BUCK
 CONNECTION DETAILS FOR WINDLOAD
 RESISTANCE SBC 1606.
  
 5)PROVIDE $ VALUE FOR ALL WORK BEING
 DONE.
  
 6)PROVIDE MISSILE IMPACT RESISTANCE
 INFORMATION.
  
 7)BEFORE A PERMIT CAN BE ISSUED IMPACT
 FEES MUST BE PAID TO PALM BEACH CO.,THE
 PERMIT PLANS STAMPED BY THEM AND THE
 RECIEPT ATTACHED TO THE PERMIT
 APPLICATION.

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2000-02-21 Cont ID  
Sent By dpalmer Date 2000-02-21 Time 07:38 Rev Time 0.00
Received By dpalmer Date 2000-02-21 Time 07:38 Sent To  
Notes
2001-01-08 00:00:00************** PROVISO******************
  
 1)NOTE:AS REQ`D BY 210-8-A-6 ALL OUTLETS
 SERVING KITCHEN COUNTERSPACE ARE TO BE
 GFI/GFI PROTECTED.
  
 2)NOTE: NEED TO SHOW EXISTING SERVICE
 SIZE AND NEW LOAD CALCULATION. NEW A/C
 IS BEING ADDED AND TOTAL LOAD NEEDS TO
 BE SHOWN.
  
 3)NOTE: PLEASE SHOW NEW CONDENSING UNIT
 LOCATION WITH DISC. 440-11
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW AND APPROVAL BEFORE ROUGH
 INSPECTION IS CALLED IN. IF THERE ARE
 ANY QUESTIONS PLEASE CALL 659-8096 EXT
 8372

Review Stop M MECHANICAL (A/C)
Rev No 2 Status N Date 2000-03-20 Cont ID  
Sent By cthirben Date 2000-03-20 Time 08:04 Rev Time 1.00
Received By cthirben Date 2000-03-20 Time 08:30 Sent To  
Notes
2001-01-08 00:00:00 
  
 ****************DENIED******************
  
 1. SPECIFY ALL DUCT SIZES.
 2. A/C AND ALL RELATED EQUIPMENT LIST
 SIZES, MODEL NUMBER AND SEER .
 3. INDICATE AMOUNT OF CFM'S FOR EACH
 DROP ON PLANS.

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2000-02-22 Cont ID  
Sent By fknapp Date 2000-03-18 Time 17:19 Rev Time 0.25
Received By jleech Date 2000-02-22 Time 15:59 Sent To  
Notes
2001-01-08 00:00:00DENIED;
 1.SIZE ALL DUCT.
 2. LIST CFM'S FOR EACH DROP.
 3.LIST EQUIPMENT SIZE,MODEL AND NUMBER,
 AND SEER.

Review Stop P PLUMBING
Rev No 1 Status P Date 2000-02-22 Cont ID  
Sent By tlarge Date 2000-02-22 Time 06:54 Rev Time 0.33
Received By tlarge Date 2000-02-22 Time 06:53 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved