| Miscellaneous Information / Notes |
| 90-INSTALL 1500FT OF 1-2" CONDUIT FROM ALLEY S/W |
| OF BANYAN N TO 3RD ST W TO FLAGLER DR. |
| |
| CONTRACTOR: ALL LAND & EQUIPMENT, LUIS EGOZCUE, |
| 786-546-1138 |
| SUB: HOT WIRE, 305-219-0286 |
| START DATE: 05-07-2020 |
| DURATION: 90 DAYS |
| END DATE: 08-05-2020 |
| DO NOT PARK ON THE SIDEWALK. BAGGING OF PARKING |
| METERS IS REQUIRED WHEN BLOCKING PARKING STALLS. |
| R/W & S/W RESTORATION PER CURRENT CITY STD. COPY |
| OF BORE LOGS & AS-BUILTS REQUIRED. LIGHTED |
| BARRICADES REQUIRED IF EQUIPMENT OR DUMPSTER (POD) |
| IS LEFT IN ROADWAY OR PARKING STALL AFTER DARK OR |
| OVER NIGHT. |
| CONTACT JANICE TARBILL 561-494-1079 FOR ALL CITY |
| LOCATES. ALL TYPE I BARRICADES TO HAVE BALLASTS |
| OVER BOTTOM RAILS. NO WORK ALLOWED BETWEEN |
| 7:00AM-9:00AM&4:00PM-6:00PM. ALL FOLLOWING |
| INSPECTIONS MUST BE CALLED IN (LISTED ON THE BACK |
| OF THE PERMIT): B800,801,802,803,804,805 |
| PLEASE BE SURE TO FOLLOW THESE SPECIAL CONDITIONS |
| (LISTED ON THE BACK OF THE PERMIT): |
| A,B,C,D,E,F,G,H,I,J,K,L,102-600,603,613,660 |