| Miscellaneous Information / Notes |
| 150-EXTENSION |
| 180-INSTALLATION OF NEW STORM SEWER & REPLACE |
| EXISTING WATER & SANITARY SYSTEM. PROJ #09620023 |
| 8-12-15 THE BANYAN TREE WILL BE REMOVED AND |
| REPLACED WITH OAKS AS A CONDITION FROM PLANNING |
| DEPARTMENT |
| |
| CONTRACTOR: DP DEVELOPMENT OF TREASURE COAST LLC, |
| PAT BORRICO, 561-650-1333 |
| START DATE: 01-19-2016 |
| DURATION: 150 DAYS |
| END DATE: 06-17-2016 |
| BAGGING OF PARKING METERS IS REQUIRED WHEN |
| BLOCKING PARKING STALLS. DO NOT PARK ON THE |
| SIDEWALK. LIGHTED BARRICADES ARE REQUIRED FOR |
| EQUIPMENT OR DUMPSTER (POD) LEFT IN ROADWAY OR |
| PARKING STALL. R/W & S/W RESTORATION PER CURRENT |
| CITY STD. COPY OF BORE LOGS & AS-BUILTS REQUIRED. |
| ALL TYPE I&II BARRICADES TO HAVE SAND BAG BALLASTS |
| OVER BOTTOM RAILS. |
| NO WORK ALLOWED BETWEEN |
| 7:00AM-9:00AM&4:00PM-6:00PM. |
| PLEASE BE SURE TO CALL IN THE FOLLOWING |
| INSPECTIONS (LISTED ON THE BACK OF THE PERMIT): |
| B800,801,802,803,804,805,806,807 |
| PLEASE BE SURE TO FOLLOW THESE SPECIAL CONDITIONS |
| (LISTED ON THE BACK OF THE PERMIT): |
| A,B,C,D,E,F,G,H,I,J,K,L,M600,SEE ATTACHED |