| Miscellaneous Information / Notes |
| 30-EXTENSION TO COMPLETE WORK. |
| 30-EXTENSION TO COMPLETE FIRST FLOOR RESTORATION. |
| ALLEY TO BE BLOCKED/LOCAL TRAFFIC ONLY. |
| 30-EXTENSION FOR ON GOING WORK. ALLEY TO BE |
| BLOCKED/LOCAL TRAFIS ONLY. |
| 30-EXTENSION TO COMPLETE WORK. |
| 30-RESTORATION OF HISTORIC FASADE & WINDOWS AT 114 |
| S OLIVE AVE. TEMP WOOD WALL INSTALLED FOR SAFETY. |
| |
| CONTRACTOR: DWYER CONSTRUCTION & DEVELOPMENT INC, |
| PETER DWYER HEALY, 772-267-6107 |
| START DATE: 07-13-2015 |
| DURATION: 30 DAYS |
| END DATE: 08-12-2015 |
| LIGHTED BARRICADES ARE REQUIRED FOR EQUIPMENT LEFT |
| IN ROADWAY OR PARKING STALL. |
| ALL TYPE I&II BARRICADES TO HAVE SAND BAG BALLASTS |
| OVER BOTTOM RAILS. |
| NO WORK ALLOWED BETWEEN |
| 7:00AM-9:00AM&4:00PM-6:00PM. |
| PLEASE BE SURE TO CALL IN THE FOLLOWING |
| INSPECTIONS (LISTED ON THE BACK OF THE PERMIT): |
| B800,801,802,803,804,805,807 |
| PLEASE BE SURE TO FOLLOW THESE SPECIAL CONDITIONS |
| (LISTED ON THE BACK OF THE PERMIT): |
| A,B,C,D,E,F,G,J,K,L,M600,SEE ATTACHED |