| Miscellaneous Information / Notes |
| POOL BARRIER FENCE - ALUMINUM RAIL - REQUIRES |
| BUILDING REVIEW |
| |
| |
| |
| |
| |
| |
| |
| 3/21/12 MET WITH JIM TRIMBLE AND DOUG WISE. PERMIT |
| APPLICATION IS EXPIRED. JIM WILL SUBMIT A NEW |
| PERMIT APPLICATION WITH A SURVEY DRAWING THAT |
| SHOWS THE EXISTING SIDE FENCES. JIM WAS TOLD THAT |
| THE PERMIT APPLICATION FEES MUST BE PAID FOR THE |
| NEW APPLICATION. RB |
| 2/14/12 HM. ROUTED TO CHUCK JORDEN. |
| 2/13/12 ROUTED TO HM DESK TO INVESTIGATE SH |
| 9/30/10 DENIED/CALLED/UNDER 'S' RM |
| 9/27/10 ROUTED TO BUILDING (RMCD. |
| 9/21/10 BRM (ENGINEERING) ROUTED TO Z. LMF |
| 9/2/10 ROUTED TO EFABIAN (ENGINEERING)NEED WPB |
| OWNER'S CONSENT SIGN-OFF PRIOR TO Z APPROVAL. |
| APPLICATION WAS DOES NOT HAVE ENG. |
| APPROVAL/DENIAL. PLEASE ROUTE BACK TO LMF |
| (ZONING)WHEN FINISHED. LMF |
| 8/23/10 1ST RESUB ADDRESSING DENIED COMMENTS NO |
| FEE SEW |
| 8-17-2010 CONTACTED SCREEN BUILDERS/CONTRACTOR TO |
| ACCESS EGOV AND PROVIDE ADDITIONAL DOCS REQUIRED |
| TO COMPLETE A FULL REVIEW EPF - ENGINEERING |
| SERVICES |
| FILED UNDER "S" (SMALL) |
| 8/13/10 ROUTED TO ENGINEERING. LMF |