| Miscellaneous Information / Notes |
| RENOVATE & ADDITION SF RESIDENCE PER PLANS EXPIRED |
| PERMIT 07070235 |
| |
| |
| 4/2/16 CANNOT PUT IN INSPECTION BECAUSE $75 FEE IS |
| OWED ASM |
| 4/20/16 PERMIT EXTENDED TO 10/20/16 ASM |
| 4/20/16 PER ROBERT THIS IS LAST RENEWAL FOR THIS |
| PERMIT CAN NO LONGER BE EXTENDED IF EXPIRED ASM |
| |
| 7/15/15 UNSTAMPED PLANS @ CRAIGS DESK $45.00 IF |
| STAMPED $75.00 (ADDED FEE ALREADY)PER DFULCHER SEW |
| 07/15/2015 CHANGE OF CONTRACTOR FORM SUBMITTED, |
| PERMIT RENEWED FOR 180 DAYS PER RBROWN NSD |
| 7/14/15 SPOKE WITH MILTON GREY OF GREY |
| CONSTRUCTION. HE HAD MET WITH THE OWNER TO DISCUSS |
| A CONTRACT TO COMPLETE THE WORK. HE HAS HAD NO |
| RESPONSE FROM THE OWNER WITH REGARD TO THE SAME. |
| THE OWNER NEEDS TO EXTEND THE PERMIT AS SOON AS |
| POSSIBLE.KC |
| 4/21/15 MILTON GREY OF GREY CONSTRUCTION, CAME IN |
| TO DISCUSS THE INSPECTION STATUS OF THE PROJECT AS |
| HE IS CONSIDERING TAKING THE PROJECT OVER. PRINTED |
| THE PLUMBING, ELECTRICAL AND BUILDING INSPECTION |
| SUMMARIES AND GAVE COPIES TO MILTON. RB |
| 3-19-2015 ADDED FEE OF $45.00 FOR PLANS (NOT |
| STAMPED) - PLANS AT DESK 6 - DRF |
| 7/9/14 CONTRACTOR SUBMITTED LETTER TO BE WITHDRAWN |
| FROM PERMIT. ROUTED TO D FULCHER. MM |
| 6/19/14 LETTER SUBMITTED TO RENEW PERMIT FOR ADD'L |
| 6 MONTHS 12/19/14 $75.00 SEW |
| 12/18/13 ADVISED OWNER THAT SHE CAN RENEW PERMIT |
| AFTER EXPIRATION RB/SH |
| 12-19-2012 PERMIT EXTENDED TO 12-19-2013 $50 SEE |
| NOTES BELOW WL |
| 12-4-2012 MRS. MURRAY CALLED; NEEDS ONE MORE |
| EXTENSION BECAUSE OF FINANCING - CAN HAVE MAXIMUM |
| 1 ADDITIONAL YEAR PER DOUG - DRF |
| |
| 2/11/11 DUPLICATE PLANS $75 & PERMIT CARD $50 |
| (CUSTOMER LEFT WITH PERMIT CARD SEW |
| 12/20/2010 PERMIT EXTENDED TO 12/20/2012- DRF |
| |
| 9/20/10 90 DAY EXTENTION APPROVED, SEE LETTER IN |
| FILE LM |
| 9-20-10 PER VENITA ROBERTS HAD CONV W/D WISE ON |
| 9-15-10 (SHE WAS UNAWARE PERMIT WOULD BE EXPIRING |
| FOR NO ACTIVITY FOR 6 MONTHS).. CHG OF CONTR $100 |
| DUPL PLAN REQUEST $250 LTR FOR PERMIT EXTENSION |
| ROUTED TO L MARTINEZ $50 NEW NOC SUBMITTED WL |
| 9/17/09 NOC SUBMITTED AND UPDATED INSPECTION HOLD |
| RELEASED SEW |
| 8/7/09 PERMIT P/U BY JAMES FLUKE NEEDS NOC SLS |
| 8/6/09 CALLED/NEEDS NOC/UNDER 'L'*LARGE BIN* RM/WL |
| 8/3/09 1ST RESUB NO FEE SPALMER |
| 7/13/09 DENIED/LEFT MESSAGE/*IN-HOUSE UNDER 'L' |
| SMALL PLANS* RM |
| 7/6/9 CHANGED APPLICATION DATE TO 7/2/9 (FEES |
| PAID) SMH |
| 6/3/09 APPL/PLANS SUBMITTED FOR 1ST REVIEW ROUTED |
| TO SHILL SEW |
| 5-7-09 JAMES FLUKE PICKUP PLANS WL |
| 5/7/9 TWO SETS NEEDED, CALLED CONTR, BIG BIN 'L' |
| SMH |
| 5/6/9 CALLED CONTR, PLANS ON SMH DESK PENDING |
| CONVERSATION W/TM, ONLY 1 SET OF OLD (2004) PLANS |
| SUBMITTED SMH |