| CONSISTING OF A ONE STORY MASONRY STRUCTURE WITH |
| STEEL BAR JOIST TO THE SOUTH SIDE OF THE EXISITNG |
| ONE STORY BUILDING WITH MINIMAL SITE WORK |
| |
| |
| |
| |
| 4/15/10 CHANGE OF CONTRACTOR |
| 4/8/10 TCO PU BY AMADOU SEW |
| 4/08/10 ISSUED TCO. TO CO BOX, "O".KC |
| 2/18/10 REQUEST FOR TCO $500 PLACED ON KEN CONRADS |
| DESK SPALMER |
| 10-13-09 MICHAEL CASON PICKUP REV #7 BLDG (DATED |
| 10-1-09) WL |
| 10-07-09 CALLED CONTRACTOR SPOKE WITH MICHAEL |
| CASON VOICE MAILPLANS FILED UNDER "O" SMALL PLAN |
| JW |
| 10-1-09 REV #7 $200 BLDG "CANOPY STRUCTURAL ENG |
| DRAWINGS" WL |
| 10-1-09 MICHAEL CASON PICKUP ELEC REV (DATED |
| 9-23-09) WL |
| 9/30/09 ELEC REV FROM 9/23 UNDER "O" FOR PU. |
| (SMALL BINS) CALLED AND SPOKE TO MIKE, REMINDED OF |
| BLUE CARD TO PICK UP PLANS. DV PALMER. |
| 9/23 09 BLDG REVISION #6 $170 CCTV SYSTEM PIPING |
| SLS |
| 9/23/09 BLDG REVISION P/U BY MICHAEL CASON SLS |
| 9-23-09 CALLED CONTRACTOR ISSUED REVISIOB FILED |
| UNDER "O" SMALL PLAN JW |
| 9-22-09 MICHAEL PICKUP BLDG REVISIONS FOR CANOPY |
| SVC & WALL CHG FOLLOWUP (DATED 9-14-09) WL |
| 9-21-09 CALLED CONTRACTOR PLANS FILED UNDER "O" |
| SMALL PLANS JW |
| 9/21/09 BLDG REV DETAIL FOR THE INSTALLATION OF |
| THE NEW HOLLOW METAL DOOR FRAMES INTO EXISTING |
| BLDG $110 SEW |
| 9/14/09 BLDG REV REVISING CANOPY STRUCTURE |
| FOUNDATION & ATTACHMENTS $110 SEW |
| 9/14/09 BLDG REV WALL CHANGED FROM 4" TO 6" $80 |
| SEW |
| 06/18/2009 APPROVED BLDG REVISION THAT WAS |
| SUBMITTED ON 06/12/2009 WAS P/U BY BEN MMILLER |
| 6/17/09 CALLED CONTRACTOR SPOKE WITH BEN DYER |
| REVISION IS FILED UNDER "O" SMALL PLAN JW |
| 6/15/09 BEN P/U ELEC REV DATED 6/3/09 SPALMER |
| 6/15/09 ELEC REV FROM 6/3 UNDER "O" (SMALL) FOR |
| PICK UP. CALLED AND LEFT MESSAGE ON BEN DYER'S VM. |
| REMINDED OF BLUE CARD. DV PALMER. |
| 6/12/09 BLDG REV CHANGED PROD APPROVALS FOR WINDOW |
| FRAMES & GLASS ASSEMBLY & DOOR $140 SEW |
| 06/03/2009 ELECTRICAL REVISION #01 FEES MMILLER |
| 3/4/09 CHANGE OF CONTRACTOR $100 SPALMER |
| 2/12/09 OKAY TO ISSUE PERMIT(PER LMARTINEZ)PU BY |
| ZACH SEW |
| 2/3/09 PLANS FILED UNDER 'C' (LARGE BIN) LM |
| 12/09/2008 CHANGED RESUBITTAL FEES TO PRIOR FEES |
| MMILLER |
| 12/04/2008 2ND RESUB PLANS PLUS APP MMILLER |
| 10-16-08 ZACH YOUNG PICKUP DENIED PLANS WL |
| 10/7/08 CALLED FOR P/U "C" LARGE BIN MRW |
| 09/09/2008 1ST RESUB PLANS PLUS APP NO FEE MMILLER |
| 8/5/08 ROY P/U DENIED PLANS SPALMER |
| 8/1/08 CALLED FOR P/U DENIED "C" LARGE BIN MRW |