Permit Information - Permit 07120513

Loading permit details...

Permit Information
Permit Number 07120513 Property ID 74434404000003010
Permit Desc BLD-COM Balance Due $0.00
Property Address 4440 DREHER TRL N Status Closed

Permit Plan Reviews Inspections Fees Contractors All
Permit
Permit Information
Application Date 2007-12-20 Operator mmiller
Issued Date 2008-06-03 Operator spalmer
Master Number   Project Number  
C.O. Number 9866 Operator kconrad
C.O. Issued 2009-04-28
C-404 Type 328 .. Usage Class NONE
Applied Value 2500000 Units 10079
Calculated Value 0 Contractor ID CGC046429
Property On Permit
Property ID 74434404000003010    
Building Ext. 0002
Address 4440 DREHER TRL N
City WEST PALM BEACH
State FL
Zip Code 33405
Owner On Permit
Name WEST PALM BEACH CITY OF LESSOR
Address PO BOX 3366
City WEST PALM BEACH Type Public
State FL Zip Code 33402
Miscellaneous Information / Notes
NEW CONSTRUCTION OF A 10,074 SF VETERNIARY
HOSPITAL, THE PALM BEACH ZOO AT DREHER PARK.
 
 
 
 
 
4/28/09 ISSUE C OF O. TO CO BOX. FILED "S".KC
4/24/09 LETTER SUBMITTED FOR TCO $500 ROUTED TO
KCONRAD SEW
04/20/2009 APPROVED BLDG SUBMITTAL THAT CAME IN
04/14/2009 WAS P/U BY JOSEPH SPENCE MMILLER
****CUSTOMER STATED THAT OUR OFFICE KEPT THE BLUE
CARD THEREFORE CUSTOMER DOES NOT NEED BLUE CARD TO
P/U SUBMITTAL MMILLER*****
04/16/2009 CALLED CUSTOMER APPROVED SUBMITTAL THAT
WAS SUBMITTED ON 04/14/2009 IS READY FOR P/U FILED
UNDER "S" MMILLER
4/14/9 SUBMITTAL OK, TO MM DESK FOR PROCESSING SMH
4/14/09 SUBMITTAL NO FEE SPALMER
4/3/09 ALUMN CANOPY & CORNISE SUBMITTALS P/U BY
BRAD PRITCHARD SLS
4/2/09 APPRIOVED ALUM CANOPY REVISION READY FOR
P/U CALLED CONT SPOKE TO JOE FILED UNDER "S" SLS
04/01/2009 CALLED CUSTOMER DENIED BLDG REVISION
APPROVED ZONING IS READY FOR P/U FILED UNDER "S"
MMILLER
3/31/9 ALUM CANOPY OK, TO MM DESK FOR PROCESSING
SMH
3/31/9 DENIED SUBMITTAL (ALUM CORNICE) TO MM DESK
SMH
3/25/09 2ND TCO ISSUED. TO CO BOX, FILE"S".CALLED
JOE FOR P/U.KC
3/24/09 LETTER SUBMITTED FOR TCO $500 SEW
3/13/09 BLDG SUBMITTAL ALUM CANOPY SHOP DRAWINGS
SEW
3/13/09 BLDG SUBMITTAL ALUM CORNICE SHOP DRAWINGS
SEW
3/6/09 NAT P/U REV DATED 2/12/09 SPALMER
3/5/09 REVISION FROM FEB. 12TH FILED UNDER 'S' LM
3-3-09 ENG REVIEW -APPROVED [email protected]
3-3-09 NAT HEALY PICKUP PLUMB REV (DATED 2-27-09)
WL
3-3-09 JOSEPH SPENCE PICKUP 2 BLDG SUBMITTALS
(DATED 2-17-09 FOR ALUM CORNICE & ALUM CANOPY)
GAVE HIM INVOICE FOR $110.00 REV FEE ADDED BY S
HILL ON 2-26-09 WL
03-02-09 CALLED FOR P/U OF APPROVED PLMG. REVS.
SUBMITTED 02-27-09 AND TALKED TO NAT H. INDICATING
THE REQUIREMENT FOR THE BLUE CARD OR RECIEPT.
"S-LARGE" KSTEVENS.
02/27/2009N CALLED CUSTOMR DENIED BLDG REVISION &
BLDG SUBMITTAL THAT WAS SUBMITTED 0N 02/17/2009 IS
READY FOR P/U FILED UNDER "S" MMILLER
2/27/9 DENIED REVISION & SUBMITTAL TO MM DESK SMH
2/27/09 EXPEDITED REQUEST: SPOKE TO NAT HEALY,
GAVE ESTIMATED TIME AND FEES. FEES HAVE BEEN ADDED
TO PERMIT. RJR
2/27/09 EXPEDITED PLAN REVIEW REQUEST SUBMITTED
AND ROUTED RREGUEIRO SEW
2/27/09 PLUMBING REV AS PER PLANS $140 SEW
2/26/09 REVISIONS GIVEN TO MCRUZ FOR FURTHER
PROCESSING. JPR
2/26/9 ADDED REVISION FEE FOR ALUMINUM CANOPY
STRUCTURAL DETAILS, SUBMITTAL AND REVISION ROUTED
TO ZONING FOR ZONING REVIEW SMH
2/25/09 ISSUED TCO.E-MAILED TO BRAD AND HARD COPY
IS IN CO BOX FILED "S".KC
2-24-09 PER JOE SPENCE TCO DOCUMENTS REQUESTED BY
KEN CONRAD NO FEE CHARGED "2 FINAL SURVEYS
(SEALED), 1 INSULATION CERT,1 SPECIAL INSPECTOR
CERT (SEALED),1 TERMITE TREATMENT CERT, & 1 ROOF
WARRANTY...ROUTED TO KEN CONRAD WL
2/23/09 NAT PU PLUMBING SHEETS FROM KSTEVENS FOR
REV SUBMITTED ON 2/12/09 SEW
2/17/09 BLDG SUBMITTAL ALUMINUM CANOPY SEW
2/17/09 BLDG SUBMITTAL ALUMINUM CORNICE SEW
2/17/09 ELEC/BLDG REV PU BY NAT SEW
2/17/09 RECD TCO LETTER $500 GAVE TO KEN CONRAD
SLS
2/17/09 RECD OVERTIME INSPECTION LETTER FOR MECH
THAT WAS DONE ON 2/14/09 $300 GAVE TO HAROLD SLS
2/13/09 REVISIONS FILED UNDER 'S' LM
2/13/09 RECD OVERTIME INSPECTION LETTER FOR
ELECTRIC $300 GAVE TO JAKE SLS
2/13/09 EXPEDITED REVIEW: SPOKE TO NAT HEALY. GAVE
ESTIMATED COMPLETION DATE AND ADDED FEES TO SYSTEM
(6 HOURS). RJR
2/12/09 PLUMB REV $170 SPALMER
2/12/09 BLDG/ELEC REV $320 SPALMER
2/12/09 REQUEST FOR EXPEDITED PLAN REVIEW
BLDG/ELEC/PLUMB GIVEN TO RON REGUEIRO SPALMER
1/27/09 PLUMB REV DATED 12/26/09, PULLED FROM
REVIEW BY NAT HEALEY ADARROUGH
1/15/09 PU BY NAT SEW
1/15/09 ELEC REV OK, CALLED AND SPOKE TO NAT,
UNDER "S" FOR PU. DV PALMER.
1-13-09 NAT HEALY PICKUP "MED GAS REV" (DATED
12-12-08) WL
1-13-09 CALLED FOR P/U OF MED-GAS REVISION AND
TALKED TO NAT H. INDICATING THE REQUIREMENT FOR
THE BLUE CARD OR RECIEPT. "S" KSTEVENS.
1-13-09 NAT HEALY PICKUP MECH REV (DATED 12-26-08)
WL
1/12/09 CALL FOR P/U, UNDER(S), SPOKE TO NAT HEALY
ADARROUGH
12/26/08 MECH REV $110 SPALMER
12/26/08 PLUMB REV $110 SPALMER
12/23/08 PLBG REVISION P/U BY NAT SLS
12-22-08 CALLED FOR P/U PLMG REVISION AND TALKED
TO NAT H. INDICATING THAT 2 REV. WERE APPROVED AND
2 REV WERE DENIED AND THAT THE BLUE CARD OR
RECIEPT WAS REQUIREC. "S" KSTEVENS
12/22/08 PU BY NAT SEW
12/22/08 MECH REV READY FOR PU "S" PER RREGUEIRO
SEW
11/12/8 MECHANICAL EQUIP WIND CALCS PROVISO
ADDRESSED SMH
12/12/2008 MECHANICAL REVISION #10 FEES $110.00
MMILLER
12/12/2008 PLUMBING REVISION #09 FEES $ 80.00
MMILLER
11/25/08 MECH REVISION P/U BY NAT SLS
11/25/2008 CALLED CUSTOMER APPROVED MECHANICAL
REVISION THAT WAS SUBMITTED ON 11/18/2008 IS READY
FOR P/U FILED UNDER "S" MMILLER
11/18/08 MECH REV #3 $100 SEW
11/18/08 PLUMBING REV #3 $90 SEW
11/17/08 MECH/PLUMB REV PU BY NAT SEW
11/15/08 MECH/PLUMB REVS CALLED FOR P/U. LEFT MSG
FOR NAT HEALY. LG BIN UNDER "S" RJR
11-6-08 NAT HEALY PICKUP ELEC REV (DATED 10-28-08)
WL
11/6/08 ELEC REV OK,CALLED AND SPOKE TO NAT, UNDER
"S" IN THE SMALL BINS. DV PALMER.
11/03/08 JOSEPH SPENCE P/U DENIED PLANS SPALMER
10/31/2008 CALLED CUSTOMER LEFT MESSAGE APPROVED
BUILDING REVISION THAT WAS SUBMITTED ON 10/24/2008
IS READY FOR P/U FILED UNDER "S" MMILLER
10/31/8 MECHANICAL UNIT CALCS OK, TO MM DESK FOR
PROCESSING SMH
10/30/8 CORR (FRAMING CALCS), CALLED CONTR, 'S'
SMH
10/30/8 MECHANICAL CALCS ON SMH DESK PENDING
RESPONSE FROM ENGINEER SMH
10-28-08 REV #6 $110 ELEC "ATTN: DEWEY PALMER" WL
10/24/08 BLDG/MECH SUBMITTAL WIND LOAD CALCS SEW
10/24/08 BLDG SUBMITTAL EXTERIOR FRAMING W/CALCS
SEW
10/17/08 PLUMBING/MECH REV PER INSPECTOR $150 SEW
10/11/08 STRUCTURAL ANALYSIS FOR RTUS CALLED FOR
P/U. LEFT MSG FOR JOE SPENCE. SM BIN UNDER "S" RJR
10/10/8 TO RR DESK SMH
10/3/08 RATIONAL ANALYSIS SUBMITTED GIVEN TO RON
PER ADRIANNA SLS
9-9-08 NAT HEALY PICKUP REV #3 (DATED 8-8-08) WL
9-9-08 D PALMER WAS GOING TO PUT UNDER "S" BUT NAT
HEALY CAME IN BEFORE HE COULD CALL. PER DEWEY
READY FOR PICKUP WL
9-3-08 CONTR (STILES CONST) PAID ROOF REV FEE WL
9/2/8 REVISION FEE ADDED (ROOF REVISION SUBMITTED
BY ROOFING CONTRACTOR), CALLED ROOF CONTR (L/M)
AND STILES (S/W ASHLEY) SMH
8/8/08 BLDG/ELEC/PLBG/MECH REVISIONS # 3 $240 SLS
8/7/08 NAT HEALY P/U PERMIT JREYES
8/6/08 APPROVED REV READY FOR P/U, UNDER(S),
**LARGE BINNS**, SPOKE TO NAT HEALY ADARROUG 8/6/8
TO AD DESK FOR PROCESSING SMH
7/31/08 ZONING SUBMITTAL CURB & SIGNAGE SEW
7/24/08 PU BY NAT SEW
7/23/08 REV APPROVED, UP FRONT UNDER(S), LEFT
MESSAGE ON NAT HEALY'S VM.
ADARROUGH
7/23/8 TO AD DESK SMH
7/23/08 BLDG REV COMMENT ON BI-FOLD DOOR $60
ROUTED TO SHILL SEW
07/11/2008 DENIED BLDG APPROVED ELECTRICAL
PARTIAL/APPROVED PLUMBING APPROVED MECHANICAL,
DENIED ZONING APPROVED FIRE & APPROVED ENGINEERING
THAT WAS SUBMITTED ON 06/05/2008 WAS P/U BY NAT
HEELY MMILLER
 
7-11-8 CALLED FOR P/U AND TALKED TO NAT INDICATING
THAT THE REVISIONS WERE READY FOR P/U AND THAT
SOME WERE APPROVED AND OTHERS DENIED. ALSO TOLD
HIM THAT THE BLUE CARD OR RECIEPT WAS REQUIRED TO
RETRIEVE THE REVISIONS. "S-LARGE" KSTEVENS
6/5/08 BLDG/ELEC/MECH/ZONING/FIRE/ENGINEER REV
SEW
6/3/08 NAT P/U PERMIT & PAID FEE SPALMER
6/2/08 PLANS UNDER "S" (LARGE BINS) ON FLOOR IN
BROWN BOX. TWO SETS OF PLANS AND TWO BOOKS. READY
FOR ISSUANCE ONCE FEES ARE PAID. OWES $19,252.50
IN PERMIT FEES IN ORDER FOR PERMIT TO PRINT.
CALLED AND SPOKE TO NAT HEALY WILL BRING IN CHECK
AND BLUE CARD. DV PALMER.
5/12/08 3RD RESUB W/PLANS & APPL SEW
5/12/08 HAD ALREADY BEEN PICKED UP BY NAT SEW
5/6/08 PLANS FILED UNDER 'S' (LARGE BIN)
LM
4/25/08 - NAT SUBMITTED MISSING ZONING DOCUMENTS.
CJH
4/14/08 2ND RESUB W/PLANS & APPL SEW
4-2-08 NAT HEALY PICKKUP LOCAL PROD APPROV FOR
ROOF HATCH WL
4/1/8 ROOF HATCH LOCAL PRODUCT APPROVAL AT FRONT
COUNTER FOR P/U, CONTRACTOR REQUEST SMH
3-21-08 NAT HEALY PICKUP DENIED PLANS WL
3/20/8 CORR, CALLED CONTR, BIG BIN 'STILES' SMH
02/13/2008 1ST RESUB PLANS PLUS APP NO FEE
MMILLER
1-28-08 FRANK LOMANNO PICKUP DENIED PLANS WL
1/25/08 CALLED FOR P/U "S" MRW LARGE BIN
SITE AREA LESS THAN AN ACRE. NOI NOT REQUIRED.