| Miscellaneous Information / Notes |
| PEDESTRIAN WALKWAY BRIDGE |
| |
| |
| |
| |
| |
| 9/25/07 THREE APPROVED SUBMITTALS: CLIP |
| CALCULATIONS, DOOR PRODUCT APPROVALS, AND ONE BLDG |
| R SUBMITTAL P/U BY BEN AJP |
| 09-25-07 CALLED SPOKE WITH BEN SUBMITTALS FILED |
| UNDER "P-SMALL PLAN" FOR PBM DEVELOPMENT JW |
| 09/19/2007 BLDG SUBMITTAL NO FEE (BUILDING |
| AS-BUILTS) MMILLER |
| 09/14/07 BLDG REV $60 FEE- PRODUCT APPROVALS FG |
| 09/14/07 BLDG REV $60 FEE- PRODUCT APPROVALS FG |
| 9/14/07 TWO DENIED SUBMITTALS: ROOFING PANEL |
| CLIPS, AND EXERIOR DOOR PRODUCT APP.) P/U BY BEN |
| AJP |
| 9/7/07 PRODUCT APPROVAL FOR EXTERIOR DOOR AT |
| PEDESTRIAN BRIDGE NO FEE SPALMER |
| 9/7/07 SUBMITTAL ROOFING PANEL CLIPS NO FEE |
| SPALMER |
| 7/2/07 BEN P/U PLUMB REV DATED 6/29/07 SPALMER |
| 6-29-7 CALLED FOR P/U PLUMB REVISIONS. LEFT A MSG |
| ON BEN DYER ANSWERING MACHINE AND INDICATED THAT |
| REVISION WAS READY TO PICK UP AND THAT HE NEEDED |
| THE RECIEPT AND/OR BLUE CARD TO RETRIEVE THE |
| REVISIONS. "P" KSTEVENS |
| 6/29/07 PLUMB REV $60 PLACED ON KEN STEVENS DESK |
| PER HIS INSTRUCTIONS TO CUSTOMER SPALMER |
| 6/27/07 BEN P/U ELEC REV DATED 6/15/07 SPALMER |
| 6/27/07 BEN P/U PLUMB REV DATED 6/6/07 SPALMER |
| 6-25-7 CALLED FOR P/U SPOKE TO BEN DYER AND |
| INDICATED HE NEEDED THE RECIEPT AND/OR BLUE CARD |
| TO RETRIEVE DENIED PLANS **LARGE BINS** "P" |
| KSTEVENS |
| 6/21/07 ELEC REV OK,CALLED SPOKE TO BEN, TOLD TO |
| BRING RECEIPT/BLUE CARD. UNDER "P". DV PALMER. |
| 6/15/07 ELEC REV ADING POWER TO ROLLDOWN GATE @ |
| SOUTH END OF PEDESTRIAL BRIDGE $70 SEW |
| 6-6-07 REV #1 PLUMB $60 "CHG DRAINAGE SYS FOR |
| PEDESTRIAN BRIDGE TRENCH DRAIN TO DOWNSPOUT, |
| ETC...PAUL SCMITZ HAS APPROVED DRAIN DESIGN IN |
| PRINCIPLE PENDING DRAWING REV" WL |
| 5/23/07 RECEIVED INPSECTION PLAN HHP |
| 5/2/07 NOEL P/U PERMIT SPALMER |
| 5-01-07 CALLED FILED UNDER "P" LARGE PLAN JW |
| 4-23-07 3RD RESUB $348 'ROLLED PLANS" WL |
| 4/23/07 PATTY P/U DENIED PLANS SPALMER |
| 4-12-07 CALLED FILED "P" LARGE PLAN JW |
| 3/12/07 2ND RESUB W/PLANS & APPL SEW |
| 2/7/07 DOMINIK P/U DENIED PLANS SPALMER |
| 2/7/07 CALLED FOR P/U "P" MRW IN LARGE BIN |
| 12/14/06 1ST RESUB PLANS/APP NO FEE SLS |
| 10/30/06 BEN P/U DENIED PLANS SPALMER |
| 10/26/06 CALLED FOR P/U IN LARGE BIN "P" MAW |
| **** 9/19/06 NOC AS LISTED UNDER MASTER HAS |
| EXPIRED AND DOES NOT INCLUDE THIS SCOPE OF WORK |
| PER FS 713.13(2). DV PALMER. |
| **** |