| Miscellaneous Information / Notes |
| RE ROOF INSTALL BASE-2PLY ANP CAP ON FLAT ROOF-1/8 |
| SLOPE-INSTALL DECRA SHINGLE PLUS ON MANSARDS 12/12 |
| PITCH 20'HGT |
| |
| |
| |
| 9/25/06 SUBMITTAL FOR BELL CHAMBER UPLIFT TEST |
| REPORT LETTER DATED 9/5/06 FROM HERNACKI |
| ENGINEERING REVIEWED AND GIVEN TO KEN CONRAD. RB |
| 6/19/06 CHRIS P/U DENIED REV SPALMER |
| 6/17/06 CALLED WEBSTER FOR REVISION P/U.'W'.RB |
| 06/05/06 ENG REV IS NOT FOR THIS PERMIT. |
| CONTRACTOR SUPPLIED WRONG PERMIT #. ENG LTRS HAVE |
| BEEN PUT WITH THE CORRECT PERMIT #. TA |
| 06/01/06 REV $ 110 FEE ENGINEEING CHANGED FG |
| 06/01/06 DIANE P/U DENIED PLANS FG |
| 05/30/06 HOLD FOR RET CK/AMM |
| 5-18-06 DENIED CALL TO P/U UNDER 'W' MJACOBS. |
| 5/16/06 BLDG REV SEW |
| 4/19/06 OK TO REMOVE HOLD-RECV'D FEE FG |
| *********************************************** |
| 2-17-06 DENIED CALL TO P/U UNDER 'W' MJACOBS |
| 2-17-06 CHRIS P/U APPLICATION. MJ |
| 3/3/06 1ST RESUB NO FEE SPALMER |
| 3-4-06 CALL TO P/U PERMIT UNDER 'W' MJACOBS. |
| 3/6/06 CHRIS P/U PERMIT SPALMER |
| 3/9/06 PERMIT ON HOLD DUE TO RETURN CK BY |
| CONTRACTOR/AM |