| Miscellaneous Information / Notes |
| SOUTH TOWER,CITY PLACE. NEW 20 STORY, 420 UNIT |
| CONDO BUILDING W/PARKING ON 8 FLOORS. 9TH FLR |
| POOL |
| |
| |
| |
| |
| 9/11/08 - LANDSCAPE PLAN APPROVED. NAT HEALY P/U. |
| ~MC |
| 09/10/2008 ZONING REVISION #61 FEES $90.00 MMILLER |
| 9-9-08 NAT HEALY PICKUP FIRE SUBMITTAL "SMOKE |
| CONTROL PANEL" (DATED 8-25-08) WL |
| 9/9/08 CALLED FOR P/U "M" MRW |
| 9/8/08 3RD TCO ISSUED, EXPIRES 15 OCT 08 JDS |
| 9/5/08 LETTER SUBMITTED FOR 3RD TCO $500 ROUTED TO |
| KCONRAD SEW |
| 8-28-08 NAT HEALY PICKUP SUBMITTAL FOR RAILING |
| (DATED 5-27-08) WL |
| 08/27/2008 RCVD LETTER OF EXTENSION SENT TO NEIL |
| MELICK'S DESK MMILLER |
| 8/27/08 CALLED NAT FOR SUBMITTAL P/U. 'M'. RB |
| 08/25/2008 FIRE SUBMITTAL ( FIRE ALARM AS-BUILT |
| SHOP DRAWINGS FOR REIVEW AND APPROVAL) NO FEE |
| MMILLER |
| 08/25/2008 FIRE SUBMITTAL (GRAPHIC DISPLAY SHOP |
| DRAWINGS FOR THE SMOKE CONTROL PANEL FOR REIVEW |
| AND APPROVAL) NO FEE MMILLER |
| 8/14/08 LETTER SUBMITTED FOR TCO $500 ROUTED TO |
| KCONRAD SEW |
| 08/12/08 CALLED FOR CONTROL PANEL P/U; UNDER "M" |
| MAW |
| 08/04/08 FIRE SUBMITTAL NO FEE ( OVERIDE DISPLAY |
| FOR THE SOMKE CONTROL PANEL AS REQUESTED BY FIRE |
| MARSHALL CARSILO) MMILLER |
| 8-4-08 NAT HEALY PICKUP PLUMB REV (DATED 7-16-08) |
| WL |
| 7/30/08 REVISED TCO ISSUED JDS |
| 7/24/08 LETTER SUBMITTED FOR WEEK-NIGHT OVERTIME |
| ON MONDAY 7/28/08 & TUESDAY 7/29/08 $300 SEW |
| 7/17/08 RECEIVED LETTER FOR OVERTIME WEEK-NIGHT |
| INSPECTIONS $1200 SLS |
| 7/16/08 PLUMBING REV ADDRESSING COMMENTS FROM REV |
| #7 $60 SEW |
| 7/16/08 TCO ISSUED FOR INSTALLATION OF FURNITURE |
| AND EQUIPMENT ONLY. JDS |
| 07/08/2008 RCVD LETTER FOR A REQUEST FOR A TCO |
| FEES $500.00 SENT TO KEN CONRAD'S DESK MMILLER |
| |
| 06/17/2008 RCVD LETTER FOR A REQUEST FOR AN |
| OVERTIME ELECTRICAL & MECHANICAL INSPECTION FES $ |
| 2400 SENT TO HAROLD MOSER'S DESK & JAKE LEAHY'S |
| DESK I (MIRELLE MILLER) MADE A COPY OF THE LETTER |
| IN ORDER TO PUT A COPY ON JAKE LEAHY'S DESK |
| MMILLER |
| |
| 06/11/2008 RCVD LETTER FOR A REQUEST FOR AN |
| OVERTIME INSPECTION SENT TO HAROLD MOSER'S DESK |
| MMILLER |
| |
| 6/5/08 LETTER SUBMITTED FOR OVERTIME MECHANICAL |
| INSPECTION FOR JUNE 7-13-08 TIMES & HOURS TO BE |
| COINCIDED W/HMOSER ROUTED TO HMOSER SEW |
| 5/27/08 BLDG SUBMITTAL FOR RAILING GAVE CUSTOMER |
| BLUE CARD FOR SUBMITTAL SPALMER |
| 5/27/08 NAT HEALY P/U BLDG REV DATED APRIL 17 |
| SPALMER |
| 5/27/08 NAT HEALY P/U BLDG SUBMITTALS DATED MAY 1 |
| SPALMER |
| 5/24/08 CALLED NAT HEALY FOR REVISION AND |
| SUBMITTAL P/U. 'M'. RB |
| 05/01/2008 BLDG SUBMITTAL (RAILINGS @THE POOL |
| DECK)MMILLER |
| 05/01/2008 BLDG SUBMITTAL (PLEASE REVIEW THE |
| INCLUDED SUBMITTAL FOR THE REQUIRED RAILINGS @THE |
| BLDG ENTRY HIGHLIGHTED LOCATIONS) NO FEE MMILLER |
| 4/29/08 LETTER SUBMITTED FOR MECH INSPECTION X (2) |
| INSPECTORS ON SATURDAY 5/3/08 $600 ROUTED TO |
| HMOSER SEW |
| 04/17/2008 BLDG REVISION # 59 FEES $ 60.00 |
| MMILLER |
| 4/11/08 BLDG REVISION # 58 EXPANSION JOINT $80 SLS |
| 4-10-08 NAT HEALY PICKUP REV DATED 1-31-2008 & |
| BLDG SUBMITTAL DATED 3-3-2008 "RFG PROD DATA" WL |
| 4-9-08 CALLED NAT HEALY FOR REVISION AND SUBMITTAL |
| P/U. LARGE BINS. 'M'. RB |
| 4-8-08 NAT HEALY PICKUP ELEC SUBMITTAL DATED |
| 3-28-08 WL |
| 4/7/08 PUT OUT FRONT FOR P/U UNDER "M" *LARGE BIN* |
| CALLED NAT JL/WL |
| 4-1-08 NAT HEALY PICKUP MECH REV PG AC-30 WL |
| 3/31/08 MECH REV PG AC-30 CALLED FOR P/U SPOKE TO |
| NAT. SM BIN UNDER "M" RJR |
| 3-6-08 NAT HEALY PICKUP PLUMB REV DATED 3-6-08 WL |
| 3-29-08 CALLED FOR P/U TALKED TO NAT L. INDICATING |
| THE PLMG REVISIONS WERE APPROVED AND THAT HE NEEDS |
| THE RECIEPT OR BLUE CARD TO RETRIEVE THE |
| REVISIONS. "M-LARGE" KSTEVENS |
| 3/28/08 SUBMITTAL ELEC TO JAKE LEAHYS DESK |
| SPALMER |
| 3/28/08 MECH REV $60 SPALMER |
| 03/26/2008 DENIED ELECTRICAL REVISION THAT WAS |
| SUBMITTED ON 03/21/2008 WAS P/U BY NAT MMILLER |
| 3/26/08 PUT OUT FRONT FOR PICKUP UNDER"M" *LARGE |
| BIN**CALLED NAT FOR P/U JL/WL |
| 3-25-08 NAT HEALY PICKUP 3 MECH REV (DATED |
| 2-8-08,3-6-08, & 3-17-08) WL |
| 3/25/08 3 SEPARATE MECH REVS IN ONE ROLL. CALLED |
| FOR P/U. SPOKE TO NAT. LG BIN UNDER "M" RJR |
| 3/21/08 SUBMITTAL FOR ELEC NO FEE TO JAKE LEAHYS |
| DESK SPALMER |
| 3/17/08 MECH REV $60 SPALMER |
| 3/6/08 PLUMB REV $100 SPALMER |
| 3/6/08 MECH REV $60 SPALMER |
| 3-5-08 NAT HEALY PICKUP SUBMITTAL DATED 2-5-08 |
| "TCO PLAN" WL |
| 3/4/08 CALLED NAT HEALY (AND LEFT A MESSAGE) FOR |
| P/U OF TCO PLAN. 'M'. RB |
| 3/3/08 BLDG SUBMITTAL NO FEE SPALMER |
| 2-25-08 FRANK LOMANNO PICKUP REV #49 |
| ELEC/PLUMB/MECH/FIRE "EMER GENERATOR & FUEL TANK" |
| DATED 1-29-08 & PLUMBING REV DATED 2-5-08 WL |
| 2-23-8 CALLED FOR P/U AND LEFT A MSG ON NAT |
| HEALY'S VOICE MAIL INDICATING THAT THE REVISIONS |
| SUBMITTED JAN. 29TH AND FEB. 5TH WERE READY FOR |
| PICK UP AND THAT SOME WERE DENIED AND OTHERS |
| APPROVED. INDICATED THAT THE RECIEPT OR BLUE CARD |
| WAS REQUIRED TO RETRIEVE THE REVISIONS. "M-LARGE" |
| KSTEVENS |
| 2-19-08 FRANK LOMANNO PICKUP MECH REV DATED 2-5-08 |
| WL |
| 2/16/08 MECH REVS AC-1, AC-4, AC-5, AC-6, AC-7, |
| AC-8, AC-19 CALLED FOR P/U. SPOKE TO NAT HEALY. LG |
| BIN UNDER "M" RJR |
| 2-14-08 FRANK LOMANNO PICKUP BLDG SUBMITTAL DATED |
| 1-11-08 WL |
| 2/13/08 CALLED NAT FOR FIRESTOP SUBMITTAL P/U. |
| 'M'. RB |
| 2/13/08 ENGINEERING LETTER SUBMITTED FOR NEIL |
| MELICK NO FEE SLS |
| 02/07/2008 MECHANICAL REVISION # 53 FEES $70.00 |
| MMILLER |
| 2/7/08 CBAA APPLICATION PU BY FRANK SEW |
| 2/7/08 ELEC REV PU BY FRANK SEW |
| 2/5/08 ELEC REV FROM 1/29 OK, UNDER "M" FOR PU, |
| CALLED AND LEFT MESSAGE ON NAT'S VM, REMINDED OF |
| BLUE CARD. DV PALMER. |
| 2/5/08 BLDG/ELEC/PLUMBING/MECH SUBMITTAL TCO PLANS |
| SEW |
| 2/5/08 MECH REV MISC ATTACHED DRAWINGS SEW |
| 2/5/08 PLUMBING REV DRAINS $120 SEW |
| 1/31/08 BLDG REV #50 ARCHITECTURAL DRAWING $110 |
| SEW |
| 01/29/2008 ELECTRICAL,PLUMBING, & MECHANICAL |
| REVISION #49 FEES $110.00 MMILLER |
| 01/29/2008 MECHANICAL REVISION #48 FEES $80.00 |
| MMILLER |
| 01/29/2008 ELECTRICAL REVISION #47 FEES $60.00 |
| MMILLER |
| 1/11/08 BLDG SUBMITTAL DETAIL 4HR RATED EXPANSION |
| JOINT ASSEMBLY IN THE FPL VAULT ROOM SEW |
| 12-26-07 NAT HEALY PICKUP 2 REV ELEC DATED |
| 12-11-07, ELEC 11-2-07 & 1 BLDG/ELEC/MECH |
| SUBMITTAL "SAUNA & STEAM" DATED 11-2-07 WL |
| 12/24/07 ELEC REV FROM 11/2 AND 12/11 UNDER "M" |
| (LARGE BINS) FOR PU, CALLED AND SPOKE TO NAT |
| HEALY. BOTH ARE RUBBER-BANDED TOGETHER. DV PALMER |
| 12-24-07 FRANK LOMANNO PICKUP {(11 SUBMITTAL & |
| REV)..REV #31,37,41,ADDENUM 4 ADD TRUSS VILLA ROOF |
| TRUSS DATED 10-23-07,ROOF PROD DATA VENT TILE |
| DATED 10-30-07,ARCH LOUVERS DATED 11-9-07,TRASH |
| CHUTE DATED 11-9-07,COPPER SPIRE SHOP DRAWINGS |
| DATED 11-13-07,PRECASTED SHOP DRAWINGS DATED |
| 11-15-07, BLDG MECH PIPE BRIDGES ROOF LEVEL DATED |
| 12-13-07,MECH FASTENERS HOLDING DEAD LOAD CALCS |
| DATED 12-13-07} WL |
| 12/21/07 CALLED NAT TO P/U SUBMITTALS AND |
| REVISIONS. LARGE BIN. 'M'. RB |
| 12/20/2007 DENIED ELECTRICAL PLUMBING REVISION |
| ALONG WITH APPROVED FIRE REVISION THAT WAS |
| SUBMITTED ON 11/07/2007 WAS P/U BY NAT HEALLY |
| MMILLER |
| 12/20/07 CALLED FOR REVISED PLAN P/U UNDER "M" |
| MAW |
| 12/13/07 BLDG SUBMITTAL MECH FASTENERS HOLDING THE |
| DEAD LOAD OF ONE FULL PIECE OF EIFS SEW |
| 12/13/07 BLDG SUBMITTAL CALCS FOR MECHANICAL PIPE |
| BRIDGES @ THE ROOF LEVEL SEW |
| 12/11/07 ELEC REV $100 SPALMER |
| 12-7-07 FRANK LOMANNO PICKUP REV #45 MECH WL |
| 12/7/07 MECH REVS (SEE REVIEW NOTES) CALLED FOR |
| P/U. SPOKE TO NAT. LG BIN UNDER "M" RJR |
| 12/5/07 DENIED EL/PLBG/MECH,APPR. FIRE REV# 39 P/U |
| BY NAT HEALY AJP |
| 12-4-07 CALLED FOR P/U AND TALKED TO NAT |
| INDICATING THAT THE REVISIONS WERE DENIED AND THAT |
| THE RECIEPT OR BLUE CARD IS REQUIRED TO RETRIEVE |
| THE PLANS. "M-LARGE" KSTEVENS |
| 11/27/2007 MECHANICAL REVISION # 45 FEES $110.00 |
| MMILLER |
| 11/19/07 NAT HEALY P/U STOREFRONT SHOP DRAWING |
| SUBMITTAL. RB |
| 11/16/07 SUBMITTAL FOR STOREFRONT SHOP DRAWINGS. |
| RB |
| 11/15/07 BLDG SUBMITTAL PRECAST SHOP DRAWINGS & |
| ENERGY CALCS SEW |
| 11/13/07 BLDG SUBMITTAL COPPER SPIRE SHOP DRAWINGS |
| & CALCS SEW |
| 11/13/-07 DENIED SUBMITTAL P/U BY FRANK (NAT |
| HEALY)AJP |
| 11/13/07 MOVED TO LARGE PLAN BIN "M" AJP |
| 11/12/07 E-MAILED MIKE GONZALEZ TO P/U DENIED |
| STOREFRONT CALULATION AND SHOP DRAWING SUBMITTAL. |
| 'M'. RB |
| 11/9/07 SUBMITTAL TRASH CHUTE NO FEE SPALMER |
| 11/9/07 SUBMITTAL ARCH LOUVERS NO FEE SPALMER |
| 11-8-07 REV #44 ELEC/PLUMB $80 "REVISED ELEC & |
| PLUMB DRAWINGS" WL |
| 11/08/07 EL. REV #43 P/U BY FRANK (NAT HEALY) |
| AJP |
| 11/7/07 MOVED TO LARGE PLAN BIN "M" AJP |
| 11/7/07 CALLED FOR P/U "M" MRW |
| 11/02/2007 ELECTRICAL REVISION #43 FEES $90.00 |
| MMILLER |
| |
| 11/02/2007 BLDG SUBMITTAL NO FEE (PLEASE REVIEW |
| THE INCLUDED SAUNA & STEAM ROOM SHOP DRAWINGS AND |
| PRODUCT DATA SAUNA & STEAM ROOM IS LOCATED ON/IN |
| THE 9TH FLOOR SHOWER/CLUB AREA) MMILLER |
| |
| 10/30/2007 BLDG SUBMITTAL NO FEES (ROOF PRODUCT |
| DATA INCLUDING ARE ADDITIONAL FLASHING DETAILS; |
| EXPANSION JOINT PRODUCT DATA REVSIED LIGHT WEIGHT |
| DRAWINGS, & VENT TILE PRODUCT DATA) MMILLER |
| |
| 10/23/2007 BLDG SUBMITTAL NO FEE (SIGNED & SEALED |
| COPIES 0F SHOP DRAWINGS & CALCULATIONS FOR VILLAS |
| ROOF TRUES ADDENUM 4 ADD TRUSS 14T17) MMILLER |
| 10/23/2007 BLDG SUBMITTAL (STOREFRONT SHOP |
| DRAWINGS & PRODUCT DATA) NO FEE MMILLER |
| 10/22/07 APPROVED MECH REV (AC-13 ADRESSING |
| PROVISO) P/U BY FRANK (NAT HEALY) AJP |
| 10/22/07 ELECTRICAL REV $110 FEE- FG |
| 10/22 MECH REV PG AC-13 CALLED FOR P/U SPOKE TO |
| NAT. SM BIN UNDER "M" RJR |
| 10/19/07 GORDON P/U SUBMITTAL DATE 10/12/07 |
| SPALMER |
| 10/19/07 E-MAILED GORDON FOR SUBMITTAL P/U. 'M'. |
| RB |
| 10/16/07 BLDG REV ARCHETECTURAL DRAWINGS $80 SEW |
| 10/12/07 BLDG SUBMITTAL #0002-07330-1 ROOF TILE |
| (HIGH & LOW DECK) SEW |
| 10/11/07 SUBMITTAL FOR EIFS PRODUCT DATA.RB |
| 10/10/07 MECH REV AC-13 ADDRESSING PROVISO $60 |
| SPALMER |
| 10/9/07 APPROVED MECH REV.P/U BY FRANK (NAT HEALY) |
| AJP |
| 10/9/07 MECH REV READY FOR P/U SPOKE TO NAT. LG |
| BIN UNDER "M" RJR |
| 10/09/07 TWO REV.'S TRASH CHUTE AND EL--P/U BY |
| FRANK (NAT HEALY) AJP |
| 10/09/2007 ELECTRICAL SUBMITTAL NO FEE MMILLER |
| 10/09/2007 ELECTRICAL & PLUMBING REVISION #39 |
| FEES |
| |
| 10/7/07 ELEC REV FROM 9/27 OK,UNDER "M" FOR PU, |
| CALLED AND LEFT MESSAGE ON NAT'S CELL VM, TOLD TO |
| BRING IN BLUE CARD/RECEIPT. DV PALMER. |
| |
| 10/5/07 CALLED AND LEFT MESSAGE FOR MIKE GONZALEZ |
| TO P/U SUBMITTALS. 'M'. RB |
| 10/02/07 TWO APPROVED BLDG REV'S (ONE IS REV #36) |
| P/U BY FRANK (NAT HEALY) AJP |
| 10/1/07 E-MAILED ARTURO TO HAVE NAT P/U REVISIONS. |
| LARGE BIN. 'M' |
| 9/28/07 BLDG SUBMITTAL - REV FROM 9/26/07 DIDN'T |
| HAVE THE SIGNED & SEALED SET OF PLANS SEW |
| 9/27/07 BLDG SUBMITTAL NO FEE SPALMER |
| 9/27/07 ELEC REV $80 SPALMER |
| 09/26/2007 BLDG REVISIONS #37 FEES (PLEASE REVIEW |
| THE INCLUDED ARCHITECTURAL REVISIONS) $140.00 |
| MMILLER |
| 09/26/2007 BLDG SUBMITTAL( PLEASE SEE THE INCLUDED |
| DRAWINGS & CALCUATIONS FOR EXTERIOR FREAMING/DROP |
| CIELING BUILDING DEPART COMMENTS ADDRESED) |
| DEPARTMENT NO FEE MMILLER |
| 9/24/07 NINE SUBMITTALS P/U BY FRANK (NAT HEALY) |
| AS FOLLOWS:DENIED TRASH CHUTE SHOP DRAWINGS, |
| APPROVED PRODUT DATA & SIZES FOR FPL VAULT |
| LOUVERS, APPROVED SUBMITTAL # 0004-5170-0, |
| APPROVED WASHING SYSTEM SHOP DRAWINGS, APPROVED |
| TRUSS DRAWING SUBMITTALS # 0001-05170-1 & |
| 001-05170-3, APPROVED/DEN. STOREFRONT CALCS, |
| DENIED EXTERIOR FRAMING/DROP CEILING SUBMITTAL, |
| ARCHITECTURAL DRAWING REV. ( NOT INDICATED IF |
| APPR. OR DEN.), AN V ONE SUBMITTAL OF VARIOUS |
| REV.S FOR PARKING GARAGE,L LPOOL DECK, WITH |
| APPROVALS AND DENIALS AJP |
| 09/24/2007 BLDG REV #36 FEES $120.00 MMILLER |
| 9/23/07 CALLED NAT TO P/U REVISIONS AND |
| SUBMITTALS. LARGE BIN. 'M'. RB |
| 9/20/07 ELEC REV #28 PU BY FRANK SEW |
| 9/20/07 PLUMBING/MECH REV #29 PU BY FRANK SEW |
| 9-19-7 CALLED FOR P/U. NEEDS RECIEPT/BLUE CARD |
| "M-LARGE" MW |
| 9/10/07 FRANK P/U SUBMITTAL FOR 8/14 8/16 & 8/17 |
| SPALMER |
| 9/10/07 FRANK P/U SUBMITTAL FOR 7/31/07 SPALMER |
| 9/10/07 FRANK P/U SUBMITTAL FOR 7/27/07 SPALMER |
| 9/10/07 FRANK P/U 3 SUBMITTALS FOR 7/10/07 |
| SPALMER |
| 9/10/07 FRANK P/U SUBMITTAL FOR 7/2/07 SPALMER |
| 9/10/07 CALLED NAT TO P/U SUBMITTALS.'M'.RB |
| 9/5/07 MECH REV ATTACHED REVISED MECH DRAWINGS |
| $160 |
| SEW |
| 9/4/07 BLDG REV TRASH CHUTE $60 SPALMER |
| 08/30/2007 BLDG SUBMITTAL NO FEE (PRODUCT DATA & |
| SIZES FOR FPL VAULT LOUVERS) MMILLER |
| 8/27/07 REVISIONS (GARAGE/POOL DECK) P/U BY FRANK |
| (NAT HEALY) AJPP |
| 08/27/2007 RCVD NOC AGAIN THAT SHOWS IT COVERS THE |
| POOL MMILLER |
| 8/26/07 ELEC REV FROM 7/31 UNDER "M" (SMALL) FOR |
| PU,CALLED AND LEFT MESSAGE ON NAT HEALY'S VM, TOLD |
| TO BRING IN BLUE CARD. DV PALMER. |
| 8/26/07 ELEC REV FROM 7/27 UNDER "M" (LARGE BINS) |
| FOR PU, CALLED GORDAN SPRINGMYER AND LEFT MESSAGE |
| TO BRING IN BLUE CARD. DV PALMER. |
| 8/24/07 APPROVEDMECH REV P/U BY NAT HEALY AJP |
| |
| 8/24/07 MECH REVS OK. SPOKE TO NAT FOR P/U. LG BIN |
| UNDER "M" RJR |
| 08/24/2007 BLDG SUBMITTAL (SIGNED & SEALED) |
| #0004-05170-0 SHOP DRAWINGS & CAL FOR ALTERNATE |
| CONNECTION OF METAL TRUSSES TO CONCRETE TIE BEAM @ |
| VILLAS) NO FEE MMILLER |
| 08/21/2007 BLDG SUBMITTAL NO FEE (RAILINGS & |
| CALCULATIONS) MMILLER |
| **** EXPALINED TO CUSTOMER THAT MECH & PLUMBING & |
| ELECTRICAL MAY BE CONSIDERED AS REVISIONS IF THAT |
| IS THE CASE THEN THERE WILL BE FEES OWED PRIOR TO |
| P/U OF REVISIONS MMILLER****** |
| 08/21/2007 ELECTRICAL & MECHANICAL & PLUMBING |
| SUBMITTAL NO FEES MMILLER |
| 08/21/2007 BLDG SUBMITTAL ( PLEASE APPROVE THE |
| ATTACHED WINDOW WASHING SYSTEMS SHOP DRAWINGS) NO |
| FEE MMILLER |
| 8/20/07 PU BY NAT SEW |
| 8/18/07 3 MECH REVISIONS IN ONE PACKAGE CALLED FOR |
| P/U LEFT MESSAGE FOR NAT. LG BIN UNDER "M" RJR |
| 08/17/07 BLDG SUBMITTAL NO FEE- SHORING LETERS FOR |
| S TOWER AT CITYPLACE HIGH ROOF AREA 12 -ATTN R |
| BROWN FG |
| 08/16/2007 BLDG SUBMITTAL (SHORING LTRS SOUTH |
| TOWER @CITYPLACE HIGH ROOF AREA 2 NO FEE MMILLER |
| 8/14/07 BLDG SUBMITTAL SHORING LETTERS FOR SOUTH |
| TOWER HIGH ROOF - AREA 7B SEW |
| 8/10/07 BLDG SUBMITTAL ROOF TRUSSES NO FEE SLS |
| 08/03/2007 BLDG REVISION #31 FEES $70.00 MMILLER |
| 7/31/07 BLDG SUBMITTAL SHORING LETTERS FOR SOUTH |
| TOWER HIGH ROOF/AREA 1 SEW |
| 7/31/07 ELEC/MECH REV $100 SEW |
| 7/27/07 PLBG & MECH REVISION # 29 $180 SLS |
| 7/27/07 ELEC REVISION # 28 $200 SLS |
| 7/27/07 SHORING LETTERS SE HIGH ROOF VILLAS NO FEE |
| SLS |
| 7/24/07 ARCHITECTURAL BLDG REV $240 SPALMER |
| 7/20/07 BLDG SUBMITTAL STOREFRONT CALCULATIONS & |
| SHOP DRAWINGS NO FEE SLS |
| 7/17/07 MECH REV $170 SEW |
| 07/10/07 BLDG SUBMITTAL NO FEE- SHOP DRAWINGS & |
| CALCS FOR HIGH ROOF SHORING FG |
| 07/10/07 BLDG SUBMITTA; NO FEE- DRAWINGS AND |
| CALCULATIONS FOR EXTERIOR & FRAMING & DROP CEILING |
| FG |
| 7/10/07 BLDG SUBMITTAL SHORING LTR INTERMEDIATE |
| ROOF ELEVATION +207'-4" NO FEE SLS |
| 7/10/07 BLDG SUBMITTAL SHORING LTR ROOF POUR # 2 |
| SLS |
| 7/3/07 BLDG REV VARIOUS CHANGES FOR PARKING LOT & |
| POOL DECK SEW |
| 7/2/07 BLDG SUBMITTAL SHORING LTRS S TOWER ROOF |
| POUR #2 SEW |
| 7/2/07 NAT P/U REV #20 DATED 4/30/07 SPALMER |
| 7/2/07 CALLED FOR P/U "M" MRW LARGE BIN |
| 7/2/07 NAT P/U REV DATED 6/7/07 SPALMER |
| 7/2/07 NAT P/U REV DATED 6/20/07 SPALMER |
| 7/2/07 NAT P/U 32 SUBMITTALS |
| 7/2/07 NAT P/U REV DATED 6/21/07 SPALMER |
| 7/2/07 NAT P/U ELEC REV #21 SPALMER |
| 7/2/07 ELEC REV FROM 5/17 UNDER "M" FOR PU, SPOKE |
| TO NAT. DV PALMER. |
| 6/30/07 CALLED NAT FOR SUBMITTAL P/U. FILED IN A |
| BOX AT LARGE BINS. 'M'. RB |
| 06/29/07 BLDG SUBMITTALS NO FEE- 3 REVISED |
| HANDRAIL AND MISC METASL SUBMITTALS FG |
| 6/29/07 ELEC REV UNDER "M"(LARGE BINS) FOR |
| PU.CALLED SPOKE TO NAT HEALY. DV PALMER. |
| 06/27/2007 NAT P/U SUBMITTAL (NOA'S AND SHOP |
| DRAWINGS FOR STORE FRONT DOORS AND WINDOWS) |
| MMILLER |
| 6/27/07 CALLED NAT FOR SUBMITTAL P/U. LARGE BINS. |
| 'M'. RB |
| 6/26/07 BLDG SUBMITTAL SHORING LETTER ROOF POUR #1 |
| SEW |
| 6-25-07 NAT HEALY PICKUP BLDG REV #19 & BLDG REV |
| DATED 5-11-07 WL |
| 6/25/07 CALLED NAT FOR SUBMITTAL AND REVISION P/U. |
| LARGE BINS. 'M'. RB |
| 6/25/07 PU BY NAT SEW |
| 6/24/07 CALLED NAT FOR SUBMITTAL AND REVISION P/U. |
| LARGE BINS. 'M'. RB |
| 06/22/2007 BLDG SUBMITTAL NO FEE (SHORING FOR |
| SOUTH TOWER AT CITY PLACE LEVEL 9 POUR #3 |
| 06/21/2007 BLDG REVISION # 24 FEES $110.00 (PLEASE |
| FIND THE ATTACHED ELECTRICAL DRAWINGS REVISION) |
| MMILLER |
| 06/20/2007 BLDG REVISION # 23 FEES $ 60.00 |
| (ATTACHED PLEASE FIND REVISED DETAIL TO ROOF TRUSS |
| SHOP DRAWINGS) |
| 6/19/07 SHORING LTR LEVEL 20 POUR 2 SUBMITTAL NO |
| FEE SLS |
| 6/18/07 NAT P/U 2 REV DATED 3/15/07 SPALMER |
| 6/16/07 CALLED NAT FOR REVISION P/U. LARGE BINS. |
| 'M'. RB |
| 6/14/07 SHORING LTR LEVEL 9 POUR 2 SUBMITTAL NO |
| FEE SLS |
| 6-14-07 NAT HEALY PICKUP MECH SUBMITTAL "LTR IN |
| REFERENCE TO A/C CLOSET DESIGN" WL |
| 6/13/07 MECH SUBMITTAL LETTERS FROM 5/30/07 CALLED |
| NAT FOR P/U. SM BIN UNDER "M" RJR |
| 06/11/07 BLDG SUBMITTAL NO FEE- SHORING LETTER FOR |
| S TOWER LEVEL 20 POUR # 1 FG |
| 06/11/07 BLDG SUBMITTAL NO FEE- SHORING LETTER FOR |
| S TOWER LEVEL 20 POUR # 1 FG |
| 6/7/07 BLDG REV ROOF TRUSS $70 SEW |
| 6/5/07 MECH SUBMITTAL FROM 5/30 DENIED. CALLED |
| CARRIE, LEFT VOICEMAIL FOR P/U. SM BIN UNDER "M" |
| RJR |
| 06/05/2007 BLDG SUBMITTAL NO FEE (SHOP DRAWINGS |
| #SS.12 SUBMITTAL #0026-03100-0) MMILLER |
| 06/05/2007 BLDG SUBMITTAL NO FEE (PLEASE FIND |
| ATTACHED THE OSUTH TOWER AT CITY PLACE SHOP |
| DRAWINGS & CALCULATIONS FOR INTERMEDIATE ROOF |
| LEVEL SHORING/RESHORING SIGNED & SEALED SUBMITTAL |
| #0028-03100-0)MMILLER |
| 06/05/2007 BLDG SUBMITTAL NO FEE (SOUTH TOWER AT |
| CITY PLACE LEVEL 19 PUR #2) MMILLER |
| 06/05/07 BLDG SUBMITTAL NO FEE (SOUTH TOWER AT |
| CITY PLACE LEVEL 9-VILLAS) MMILLER |
| 6/5/07 NAT P/U PLUMB REV DATED 4/19/07 SPALMER |
| 6-4-7 CALLED FOR P/U LEFT A MESSAGE INFORMED NAT |
| HEALY TO BRING A RECIEPT AND/OR THE BLUE CARD FOR |
| PICK UP OF THE REVISION LEFT OUT FRONT UNDER "M" |
| KSTEVENS |
| 5/31/07 BLDG SUBMITTAL WINDOW WASHING SYSTEM SHOP |
| DRAWINGS SEW |
| 05/30/2007 MECHANICAL SUBMITTAL NO FEE (REFERENCE |
| TO A/C CLOSET DESIGN) |
| 05/29/2007 BLDG SUBMITTAL NO FEE (SHORING LTRS @ |
| CITY PLACE LEVEL 19 POUR #3 |
| 05/29/2007 BLDG SUBMITTAL NO FEE ( SHORING LTRS @ |
| CITY PLACE LEVEL 19 POUR #1) MMILLER |
| 05/22/2007 BLDG SUBMITTAL NO FEE (SHORING LTRS FOR |
| SOUTH TOWER @CITYPLACE LEVEL 18 POUR #2) MMILLER |
| 05/22/2007 BLDG SUBMITTAL NO FEE (PLEASE APPROVE |
| THE ATTACHED ROOF TRUSS SHOP DRAWINGS AND |
| CALCULATIONS) MMILLER |
| 5/17/07 BLDG SUBMITTAL SHORING DRWGS & CALCS FOR |
| 9TH FLR VILLAS & CABANA ROOF NO FEE ATTN: ROBERT |
| BROWN |
| SLS |
| 5/17/07 2 BLDG SUBMITTALS SHORING LETTERS FOR |
| LEVEL 18 POUR 1 & POUR 3 NO FEE ATTN: ROBERT BROWN |
| SLS |
| 5/17/07 ELECTRICAL REVISION $200 SLS |
| 5/11/07 BLDG SUBMITTAL SHOP DRAWINGS FLAME SPREAK |
| DATA BLDG ELEVATIONS SEW |
| 05/10/07 SHORING LETTERS FOR S TOWER IN CITY PL- |
| LEVEL 17- POUR 2- ROUTED TO R BROWN FG |
| 5/9/07 SHORING LETTERS FOR SOUTH TOWER LEVEL 17 |
| POUR 3 GIVEN TO ROBERT BROWN NO FEE SLS |
| 5/9/07 SHORING LETTERS FOR SOUTH TOWER POOL DECK |
| NO FEE GIVEN TO ROBERT BROWN NO FEE SLS |
| 05/03/2007 BLDG SUBMITTAL SHORING LETTERS FOR |
| SOUTHTOWER AT CITY PLACE ORIGINALLY SUBMITTED |
| 01/25/2007 FLOOR #4 POUR #1 MMILLER |
| 05/03/2007 BLDG SUBMITTAL SHORING LETTERS FOR |
| SOUTH AT CITY PLACE LEVEL # 17 POUR #1 TOWER |
| MMILLER |
| 5-2-07 NAT HEALY PICKUP FIRE REV DATED 2-08-07 WL |
| 5-2-07 BLDG SUBMITTAL SHORING LTRS FOR SOUTH TOWER |
| @ CITY PLACE 8TH FL POUR #3 VILLAS WL |
| 04/30/2007 NAT P/U BLDG SHORING LETTERS (FOR |
| GARAGE LEVEL 4 POUR # 1 THAT WAS SUBMITTED ON |
| 01/25/2007 PLEASE CHECK PROGRESS)MMILLER |
| 04/30/2007 BLDG, ELECTRICAL, PLUMBING, & |
| MECHANICAL REVISION FEES $370.00 MMILLER |
| 04/30/2007 BLDG SUBMITTAL (SHOP DRAWINGS) PLEASE |
| APPROVE THE ATTACHED NOA'S AND SHOP DRAWINGS FOR |
| STORE FRONT DOORS & WINDOWS MMILLER |
| 04/30/2007 BLDG SUBMITTAL # 3 NO FEE MMILLER |
| 04/30/2007 BLDG SUBMITTAL DESIGN NO.V452 TO BE |
| USED WHEN WET AREAS ARE ADJACENT TO A FIRE RATED |
| PARTITION MMILLER |
| 04/30/2007 BLDG REVISION FEES $70.00 (DOOR |
| SCHEDULE) MMILLER |
| 04/30/2007 SHORING LETTERS NO FEE LEVEL 16 POUR # |
| 2 MMILLER |
| 04/30/2007 SHORING LETTERS SUBMITTAL NO FEE (FOR |
| SOUTH TOWER AT CITY PLACE LEVEL 16 PUR # 3 |
| SUBMITTED MMILLER |
| 04/30/07 REVISED PLANS SP8-SP12 READY; LARGE BIN |
| "M" MAW |
| 04-27-07 CALLED NAT FOR TO P/U UNSEALED SHORING |
| LETTER.'M'. JDS |
| 04/27/07 SUBMITTAL NO FEE- SHORING LETTERS FOR |
| SOUTH TOWER-ROUTED TO R BROWN FG |
| 4/26/07 DUPL BLDG SUBMITTAL (1/25/07) |
| SHORING/RESHORING GARAGE LEVEL 4 POUR #1 ROUTED TO |
| GSMITH SEW |
| 4/26/07 BLDG SUBMITTAL SHORING LETTER S TOWER L-16 |
| POUR #2 SEW |
| 4-20-07 NO FEE BLDG SUBMITTAL SHORING LTRS FOR S |
| TOWER @ CITY PLACE GARAGE LEVEL #8 POUR #1 "ATTN |
| ROBERT BROWN" WL |
| 4/19/07 PLUMBING REVISION $60 SLS |
| 4/19/07 NAT P/U MULTIPLE SUBMITTALS SPALMER |
| 4/18/07 E-MAILED NAT HEALY FOR P/U OF MULTIPLE |
| SUBMITTALS. LARGE BINS. 'M'. RB |
| 4/18/07 BLDG SUBMITTAL SHORING LTR SOUTH TOWER |
| LEVEL 16 POUR #1 SEW |
| 4/13/07 BLDG SUBMITTAL SHORING LTR SOUTH TOWER |
| LEVEL 15 POUR #3 SEW |
| 4/11/07 BLDG SUBMITTAL SHORING LTR SOUTH TOWER |
| LEVEL 15 POUR #2 SEW |
| 4/11/07 BLDG SUBMITTAL SHORING LTR SOUTH TOWER |
| LEVEL 7 POUR #3 SEW |
| 4/11/07 PU BY NAT SEW |
| 04/10/07 DENIED REV/PLAN READY; P/U UNDER "M" MAW |
| 04/09/07 SUBMITTAL NO FEE- ROUTE TO R BROWN- 9TH |
| FLOOR PARKING GARAGE PT CABLES-SHOP DRAWINGS & |
| CALUCALTIONS (3 SIGNED & SEALED) FOR SOUTH TOWER @ |
| CITY PLACE FG |
| 04/06/2007 BLDG SUBMITTAL NO FEE (SHORING LETTERS |
| FOR SOUTH TOWER @ CITYPLACE MMILLER |
| 4/6/07 NAT HEALY P/U TWO SUBMITTALS SHORING & |
| CALCULATIONS SPALMER |
| 4/6/07 CALLED NAT FOR SUBMITTAL P/U.'M'.RB |
| 4/5/07 ROOF SHORING & CALCULATIONS FOR SOUTH TOWER |
| @ CITYPLACE NO FEE GIVEN TO ROBERT B SLS |
| 4/5/07 SHORING LETTER SUBMITTAL FOR SOUTH TOWER @ |
| CITYPLACE NO FEE GIVEN TO ROBERT B SLS |
| 4/5/07 NAT P/U PLUMB REV SPALMER |
| 4/4/07 NAT HEALY P/U ONE PLUMB REV SPALMER |
| 4-4-7 CALLED FOR P/U PLMG REV "M" KSTEVENS |
| 4-3-7 CALLED FOR P/U PLMG REV "M" KSTEVENS |
| 4/3/07 PRODUCT INFO/DATA FOR EXT METAL FRAMING |
| SUBMITTAL ROUTED TO ROBERT BROWN NO FEE SLS |
| 4/3/07 SHORING LETTER FOR SOUTH TOWER @ CITYPLACE |
| ROUTED TO ROBERT BROWN NO FEE SLS |
| 04/02/07 BLDG SUBMITTAL NO FEE- SHORING LETTERS |
| FOR SOUTH TOWER AT CITY PLACE ROUTED TO R BROWN |
| DESK FG |
| 03/30/07 BLDG SUBMITTAL NO FEE- REVIEW ROOFING |
| PACKAGE ROUTED TO R BROWN DESK FG |
| 03/30/07 BLDG SUBMITTAL -SHORING LETTER FOR S |
| TOWER AT CITY PLACE ROUTED TO R BROWN FG |
| 3/28/07 NAT HEALY P/U MECH REV DATED 3/15/07 |
| SPALMER |
| 3.27.07 MECH REV PG AC-5 CALLED FOR P/U SM BIN |
| UNDER 'M' RJR |
| 03/27/2007 BLDG SUBMITTAL ( SHORING LETTERS)N0 FEE |
| MMILLER |
| 03/27/2007 NAT P/U ELECTIRCAL & FIRE REVISION |
| MMILLER |
| 03/26/07 REVISED SHEET E2 READY; P/U UNDER "M" |
| MAW |
| 03/26/07 FIRE REVSION FEES $70.00 MMILLER 3/23/07 |
| NAT HEALY P/U DENIED MECH REV DATED 3/15/07 |
| SPALMER |
| 3.22.07 MECH REVS AC4/AC7 DENIED CALLED FOR P/U SM |
| BIN UNDER "M" RJR |
| 03/22/2007 BLDG SUBMITTAL (SHORING LETTERS NO FEE |
| MMILLER |
| 3/21/07 SHORING LETTERS LEVEL 13 POUR 3 NO FEE |
| SLS |
| 03/21/2007 BLDG SUBMITTAL NO FEE MMILLER |
| 03/15/2007 BLDG SUBMITTAL NO FEE MMILLER |
| 03/15/2007 BLDG REVISION FES $ 150.00 MMILLER |
| 03/15/2007 MECHANICAL REVISON FEES $ 70.00 |
| MMILLER |
| 03/15/2007 PLUMBING REVISION FEES $80.00 MMILLER |
| 03/15/2006 BLDG REVISION FEES $100.00 MMILLER |
| 03/15/2007 MECHANICAL REVSION FEES $ 60.00 MMILLER |
| 03/15/2007 PLUMBING REVISION FEES $ 60.00 MMILLER |
| 03/15/2007 ELECTRICAL REVISION FEES $ 60.00 |
| MMILLER |
| 03/15/2007 BLDG SUBMITTAL NO FEES MMILLER |
| 3/14/07 BLDG SUBMITTAL SHORING LTR S TOWER @ CITY |
| PLACE SEW |
| 3/9/07 SUBMITTAL NO FEE- ROUTE TO GERALD SMITH |
| DESK FG |
| 3-8-07 BLDG SUBMITTALS SHORING LTR FOR 12TH FLR |
| POUR 3 S TOWER @ CITY PLACE WL |
| 03/07/2007 BLDG SUBMITTALS NO FEE MMILLER |
| 3/5/07 4 BLDG SUBMITTALS SHORING LTR 11TH FLR |
| PARCEL 1 & 2 SHORING LTR VILLA PARCEL 5 & SHORING |
| LTR 12TH FLR POUR 1 NO FEE SLS |
| 02/22/2007 BLDG SUBMITTAL NO FEE MMILLER |
| 02/22/2007 BLDG SUBMITTAL NO FEE MMILLER |
| 2/22/07 3 BLDG SUBMITTALS NO FEE SLS |
| 2/13/07 2 BLDG SUBMITTALS SHORING/RESHORING |
| LETRERS POUR #2 & #3 LEVEL 10 |
| 2/12/07 CARRIE P/U 15 REV SPALMER SPALMER |
| 2-11-07 CALLED CARRIE TO P/U REVISION AND |
| SUBMITTALS. LARGE BINS.'M'.RB |
| 2-9-7 CARRIE WOOLBERT PICKUP MECH REV WL |
| 2/9/07 MECH REV CALLED FOR P/U LG BIN UNDER'M' |
| RJR |
| 2/8/07 (5) BLDG SUBMITTALS/SHORING LTRS FOR |
| VILLA/9TH FL SHORING CALS FOR VILLA/9TH FL SHORING |
| DRAWINGS FOR VILLA & GARAGE/INTERMEDIATE & HIGH |
| ROOF CALS/INTERMEDIATE & HIGH ROOF DRAWINGS PT |
| 2/8/07 REV/BLDG $110 PT/WL |
| 2-5-07 (2) BLDG SUBMITTALS DATED 2-5-07 NO FEE WL |
| 2/2/07 (2) BLDG SUBMITTALS 8THFL SHOP DRAWINGS & |
| 8THFL CALCULATIONS NO FEE SEW |
| 01/30/07 BLDG SUBMITTAL NO FEE-PLEASE |
| SIGNED/SEALED LETTERS FOR POUR 2 LEVEL 9 FG |
| 01/30/07 BLDG SUBMITTAL NO FEE-SIGNED/SEALED |
| LETTERS FOR POUR 3 LEVEL 9 FG |
| 01/25/07 BLDG SUBMITTAL- NO FEE ROUTED TO GERALD |
| SMITH PER CONTRACTOR- SHORING/ RESHORING GARAGE |
| LEVEL 4 POUR- 1 FG |
| 1/24/07 SUB/BLDG/SHOP DRAWINGS FOR WINDOWS & |
| SLIDER PT |
| 1/24/07 SUB/BLDG/CAL FOR WINDOWS & SLIDER PT |
| 1/24/07 SUB/BLDG/SHORING PT |
| 1-24-07 CARRIE WOOLBERT PICKUP 2 REV PLUMB DATED |
| 1-11-07 & PLUMB DATED 12-18-06 WL |
| 1-23-7 CALLED FOR P/U (2) "M LARGE" KSTEVENS |
| 1/19/07 RE-SHORING LTR FOR LEVEL 8 POUR 3 NO FEE |
| SEW |
| 1/16/07 SHORING LETTER FOR VILLAS LEVEL 3 NO FEE |
| SLS |
| 1/16/07 SHORING LETTER FOR TOWER LEVEL 8 NO FEE |
| SLS |
| 1/11/07 BLDG SUBMITTAL NO FEE -SIGNED AND SEALED |
| SHORING /RESHORING LETTERS FOR 8TH FLOOR - POUR 1 |
| FG |
| 1/11/07 PLUMBING REV $90 FEE- DELETED TWO TRENCH |
| DROPS AT POOL DECK-ADD 1 FLOOR DRAIN AT ENTRY TO |
| TOILET AREA FROM POOL FG |
| 01/08/07 CARRIE P/U 34 SUBMITTALSS FG |
| 01/08/07 SUBMITTAL NO FEE- SIGNED SEALED LETTERS |
| FOR POUR 3 LEVEL 7-ROUTE TO R BROWN FG |
| 1/7/07 CALLED CARRIE TO P/U SUBMITTALS. LARGE |
| BINS.'M'. RB |
| 01/03/07 BLDG LETTERS NO FEES MMILLER |
| 01/03/07 BLDG LETTERS SUBMITTALS NO FEES MMILLER |
| 1/2/07 CARRIE P/U REV DATED 12/15 AND 12/18/06 |
| SPALMER |
| 12/31/06 ELEC REV'S FROM 12/15 AND 12/18 UNDER "M" |
| IN LARGE BINS FOR PU. CALLED AND LEFT MESSAGE ON |
| CARRIE'S VM AND SENT E-MAIL TO ARTURO. TOLD TO |
| BRING IN BLUE CARD/RECEIPT. DV PALMER. |
| 12/27/06 BLDG SUBMITTAL SHORING/RESHORING LETTER |
| LEVEL 7 POUR ONE SEW |
| 12/22/06 BLDG SUBMITTAL LETTERS FOR LEVEL SIX POUR |
| THREE SEW |
| 12/22/06 BLDG SUBMITTAL LEVEL 2 SHORING/RESHORING |
| LETTERS FOR VILLA SEW |
| 12/19/06 BLDG SUBMITTAL (GARAGE) LETTERS NO FEES |
| MMILLER |
| 12/19/06 BLDG SUBMITTAL LETTERS NO FEES MMILLER |
| 12/18/06 BLDG REV $220 FEE FG |
| 12/18/06 ELECTRICAL REV $130 FEE FG |
| 12/18/06 MECHANICAL REV $70 FEE FG |
| 12/18/06 MECHANICAL REV $100 FEE FG |
| 12/18/06 REV $110 FEE- PLUMB FG |
| 12/15/06 ELECTRICAL REVISION FEES $160.00 MMILLER |
| 12/14/06 5 BLDG SUBMITTALS CALCS/DRAWINGS FOR 9TH |
| FL GARAGE LEVEL 6 POUR #1 CALCS/DRAWINGS FOR 8TH |
| FL GARAGE SEW |
| 12/08/06 BLDG SUBMITTAL NO FEE- POST TENSION |
| DRAWINGS FOR FLOORS 3-7 IN THE GARAGE FG |
| 12/08/06 BLDG SUBMITTAL NO FEE- POST TENSION |
| CALCULATIONS FOR FLOORS 3-7 IN PARKING GARAGE FG |
| 12/08/06 BLDG SUBMITTAL NO FEE- SHORING /RESHORING |
| DRAWINGS FOR FIFTH FLOOR POUR 3 IN THE TOWER FG |
| 12-6-06 (3 BLDG SUBMITTALS) SHORING CALC VILLA & |
| GARAGE FLOORS 3-7, SHORING DRAWINGS VILLAS & |
| GARAGE FLOORS 3-7, SHORING PLANS FLLORS 11-20 CALC |
| PREVIOUSLY SUBMITTED WL |
| 12/05/06 SUBMITTAL OF BLDG LETTERS MMILLER |
| 12/04/06 SUBMITTAL SHORING/RESHORE LTRS 5TH FL |
| POUR 2 SPALMER |
| 12/4/06 CARRIE P/U SUBMITTALS SPALMER |
| 12/3/06 E-MAILED ARTURO FOR EQUIPMENT SPEC BINDER |
| PICK UP. LARGE BINS. 'M'. RB |
| 11/30/06 BLDG SUBMITTAL (LTRS FLR 5 POUR ) NO FEE. |
| TA |
| 11/30/06 BLDG REV TO TRASH CHUTE SEW |
| 11/21/06 BLDG SUBMITTAL (RESHORING LTRS FOR 4TH FL |
| POUR 3) NO FEEE. TA |
| 11/17/06 3 SUBMITTAL NO FEE POST TENSION DRAWINGS |
| 4TH - 20TH FLOOR/SHORINGS DRAWINGS FOR THE |
| 4TH-20TH/ PORT TENSION 4TH-20TH FLOOR FG |
| 11/16/06 3 BLDG SUBMITTAL PER ROBERT BROWN NO FEES |
| MMILLER |
| 11/13/06 7 BLDG SUBMITTALS PER ROBERT NO FEE SLS |
| 11/13/06 CARRIE WOOLBERT P/U SUBMITTALS -PER R |
| BROWN OK TO RELEASE W/O BLUE CARD FG |
| 11/12/06 E-MAIL SENT TO CARRIE AND ARTURO FOR |
| SUBMITTAL P/U. 'M' LARGE BINS. RB |
| 11/03/06 SUBMITTAL OF POST TENSION DRAWINGS FOR |
| THE GARAGE MMILLER |
| 11/03/06 SUBMITTAL THREE SETS POST TENSION |
| CALATIONS FOR THE GARAGE MMILLER |
| 11/03/06 SUBMITTAL SEALING SHORING LETTERS FOR POR |
| # 3 & LEVEL 3 MMILLER |
| 11/3/06 CARRIE P/U REV DATED 8/1/06 SPALMER |
| 10-29-06 E-MAILED ARTURO TO P/U PRODUCT APPROVAL |
| BINDERS. 'M'. LARGE BINS. RB |
| 10-27-06 CARRIE WOLLBERT PICKUP SUBMITTAL DATED |
| 10-26-06 WL |
| 10/26/06 REVIEWED DRY-IN PLAN.TO BOX "M".CALLED |
| CARRIE FOR PICK-UP.KC |
| 10/23/06 SUBMITTAL NO FEE- LETTERS FG |
| 10/16/06 SUBMITTAL SHORING LAYOUT 2ND FL CONCRETE |
| BEAMS 10TH-20TH FL/PARTIAL 11TH-20TH F/PARTIAL |
| SEW |
| 10/10/06 SUBMITTAL NO FEE- SIGNED AND SEALED |
| LETTERS FOR LEVEL 3 POUR 1 FG |
| 9/27/06 SHORING LETTERS FOR 2ND FLOOR POUR 3 SLS |
| 9/20/06 - (5) SUBMITTALS/SHORING LETTERS/FLOOR |
| SHORING PLANS & DETAILS/CAST IN PLACE CONCRETE |
| FRAMING/SHORING FOR 3RD FL/PTT030 PTT031 PT |
| 9/19/06 PRODUCT DATA FOR MOISTURE CONTROL |
| SUBMITTED NO FEE SLS |
| 9/8/06 SHORING LETTERS/SOIL BEARING CAPACITY |
| LETTERS/DOWEL SURVEY/SLAB MEETING FLOOD ELEVATIONS |
| SLS |
| 9/7/06 TOM P/U PERMIT CARD ONLY SPALMER |
| 9-6-06 CALLED ARTURO TO P/U PERMIT CARD ONLY. |
| PLANS TO BE PROCESSED AT A LATER DATE. 'M'. RB |
| 8-28-06 PRODUCT APPOVALS & CALCSP/U BY ARTURO PHK |
| 8/25/06 BLDG SUBMITTAL SHORING DRAWINGS/CALCS SEW |
| 8/17/06 BLDG SUBMITTAL TO RBROWN SEW |
| 8/1/06 2ND RESUB PLANS/APP $50 SLS |
| 7/26/06 PLANS PICKED UP BY ARTURO. DV PALMER. |
| 7/26/06 E-MAILED ARTURO AND LET HIM KNOW THE PLANS |
| ARE READY FOR P/U(M) ADARROUGH |
| 5/9/06 NOC TURNED IN TODAY SPALMER |
| 4/27/06 1ST RESUB NO FEE SPALMER |
| ************************************************ |
| ************************************************ |
| 2-20-06 DENIED. CALLED ARTURO FOR P/U. 'M'. RB |
| 2/21/06 ARTURO P/U DENIED PLANS SPALMER |