| Miscellaneous Information / Notes |
| NEW 4 STORY LIBRARY & EXISTING OCTAGON BLDG |
| TO BE GUTTED & RENOVATED SEE BLDG PROVISO |
| |
| |
| |
| |
| 10/5/09 DENIED LANDSCAPE PLANS FILED UNDER 'T' LM |
| 10/05/2009 APPROVED LANDSCAPE THAT WAS SUBMITTED |
| ON 09/28/2009 WAS P/U BY DOUG MMILLER |
| 10/1/09 LANDSCAPE SUBMITTAL FILED UNDER 'T' LM |
| 9-30-09 NO FEE CHGD ROUTED TO KEN CONRAD |
| "ELEVATION CERTIFICATE FOR CO" WL |
| 09/30/09 LANDSCAPE APPROVED & RETURNED TO AV |
| 09/28/2009 LANDSCAPE SUBMITTAL NO FEE OK PER AV |
| (DEPUTY DIRECTOR) (REVISED AS-BUILTS LANDSCAPE |
| PALNS AS REQUESTED BY ROBERT KUSSNER) MMILLER |
| 9/16/09 DENIED LANDSCAPE PLAN NEEDS TO CALL IN AN |
| INSPECTION FOR PHASE I. PLANS ON RK DESK SO |
| INSPECTION CAN BE DONE. AV |
| 09/16/2009 APPROVED MECHANICAL REVISION THAT WAS |
| SUBMITTED ON 08/24/2009 WAS P/U BY DOUG MMILLER |
| 09/16/2009 RCVD LETTER OF REQUEST FOR "TCO" FEES $ |
| 500.00 ROUTED TO KEN CONRAD'S DESK MMILLER |
| 9/14/09 DENIED CONTRACTOR CALLED FILED UNDER WEITZ |
| COMPANY AV |
| 9/8/2009 CALLED DOUG TO P/U T&B REPORT. REPORT IN |
| BOX (T) HM. |
| 9/2/09 SENT TO JOHN ROACH RAK |
| 8/26/09 LANDSCAPE REVISION # 100 $110 AS-BUILTS NO |
| HISTORICAL APPROVAL PER ROBERT KUSSNER SLS |
| 8/24/09 BLDG SUBMITTAL TEST/BALANCE REPORTS |
| CLARIFICATION ROOF CURB CAP TIE DOWN DETAIL SEW |
| 8/17/09 PAID $500 PICKED UP TCO SEW |
| 8/17/09 (4) REVISIONS PU BY DOUG SEW |
| 8/13/09 ELEC REV'S UNDER "T" (BROWN BINS) FOR PU. |
| THERE ARE FOUR REVISION, DATING, 6/11, 6/24, 7/15, |
| AND 7/20. CALLED AND SPOKE TO TO DOUG. REMINDED OF |
| BLUE CARD. DV PALMER |
| 8/12/09 LETTER SUBMITTED FOR TCO ROUTED TO KCONRAD |
| - WAS ADVISED TO PAY AT TIME OF P/U SEW |
| 07/29/2009 BLDG SUBMITTAL NO FEE ROUTED TO KEN |
| CONRAD'S DESK MMILLER |
| 7/28/09 LETTER SUBMITTED FOR TCO ROUTED TO KCONRAD |
| - HAS NOT PAID YET UNTIL APPROVAL SEW |
| 07/22/2009 BLDG SUBMITTAL NO FEE ROUTED TO DOUG |
| WISE'S DESK MMILLER |
| 7/20/09 BLDG SUBMITTAL P/U KINSSON SPALMER |
| 7/20/09 ELEC REV $110 SPALMER |
| 7/20/09 SHORING LTRS PLACED ON KEN CONRADS DESK |
| SPALMER |
| 7-20-09 CALLED CONTRACTOR AND SPOKE WITH DOUG |
| PLANS FILED UNDER "T" SMALL PLAN JW |
| 07/15/2009 BLDG SUBMITTAL NO FEE (LIGHT POLE & |
| FIXTURE PER PREVIOUS SUBMITTAL COMMENTS ATTN: JIM |
| WITMER)MMILLER |
| 07/15/2009 ELECTRICAL REVISION #02 FESS $110.00 |
| MMILLER |
| 7/9/09 BLDG REVISION P/U BY KINSSON SLS |
| 7-09-09 CALLED CONTRACTOR FILED SUBMITTALS UNDER |
| "T" SMALL PLAN JW |
| 06/29/2009 BLDG REVISION # 101 FEES MMILLER |
| **** ADDED REVISION FEES $ 140.00 CUSTOMER PAY |
| PRIOR TO P/U MMILLER**** |
| 06/24/2009 ELECTRICAL REVISION #100 FEES $140.00 |
| MMILLER |
| 6/15/09 KINSSON P/U EAST STAIR RAILINGS SUBMITTAL |
| DATED 6/8/09 SPALMER |
| 6/15/09 KINSSON P/U ALUMINUM RAILING SUBMITTAL |
| DATED 5/29/09 SPALMER |
| 06-15-09 CALLED CONTRACTOR PLANS FILED UNDER "T" |
| SMALL PLANS JW |
| 06/11/2009 APPROVED BLDG ELECTRICAL & MECHANICAL |
| THAT WAS SUBMITTED ON 05/13/2009 WAS P/U BY |
| KINSSON MMILLER |
| 06/11/2009 ELECTRICAL REVISION # 100 FEES $170.00 |
| MMILLER $170 REV FEE PAID UNDER #0899 ON 6/23/09 |
| SEW |
| 06/11/2009 APPROVED ELECTRICAL THAT WAS SUBMITTED |
| ON 05/21/2009 AND APPROVED ELECTRICAL THAT WAS |
| SUBMITTED 06/03/2009 WAS P/U BY KINSSON MMILLER |
| MMILLER |
| 6/11/09 ELEC REV'S FROM 5/21 AND 6/3 UNDER "T" |
| (LARGE BROWN BINS) FOR PU. CALLED AND LEFT MESSAGE |
| ON KINSSON GRACIEN'S VM. REMINDED OF BLUE CARD. DV |
| PALMER. |
| 6/11/09 BLD/MECH/ELEC REV FROM 5/13 PASSED, CALLED |
| FOR P/U. LEFT MSG FOR KINSSON. LG BIN UNDER "W" |
| RJR |
| 6/8/09 SUBMITTAL BLDG NO FEE SPALMER |
| 6/3/09 ELEC REV SHEET E1.01 # 8 PER RFI #182R $80 |
| SEW |
| 6/3/09 PU BY KINSON SEW |
| 06/02/09 RVSD PLANS READY FOR P/U; LARGE BIN "T" |
| MAW |
| 5/29/09 BLDG SUBMITTAL ALUM RAILING @ BRIDGE SEW |
| 5/29/09 REV PU BY KINSON SEW |
| 5/26/09 REV FROM 4/10 LOCATED AND PLACED UNDER "T" |
| FOR PU. ( MEDIUM PACKAGE IN BROWN BINS). CALLED |
| AND LEFT MESSAGE FOR KINSON, REMINDING OF BLUE |
| CARD. DV PALMER. |
| 5-21-09 REV #99 ELEC $290 "RFI #197 & 199 (FLAT |
| SCREEN PANELS & NAC PANEL)" WL |
| 5-21-09 KINSSON PICKUP PLUMB REV PL.03 (DATED |
| 5-13-09) WL |
| 5-20-09 CALLED FOR P/U OF PLMG REVISIONS SUBMITTED |
| 5-13-09 AND TALKED TO KINSSON G. INDICATING THE |
| REQUIREMENT FOR THE RECIEPT OR BLUE CARD. "T" |
| KSTEVENS. |
| 5/13/09 ELEC/MECH REV BASEMENT SMOKE BARRIER $ SEW |
| 5/13/09 PLUMBING REV P1.03 $80 SEW |
| 5-1-09 KINSSON G. PICKED UP PLMG REVISION. |
| KSTEVENS. |
| 5-1-09 CALLED FOR P/U OF DENIED PLMG REVISION |
| SUBMITTED 3-27-09 AND TALKED TO KINSSON G. |
| INDICATING THE REQUIREMENT FOR THE RECIEPT OR BLUE |
| CARD. "T-LARGE" KSTEVENS. |
| 4-29-09 REV #896 $200 "REVISED LOW VOLT DRAWINGS" |
| WL |
| 4-21-09 KINSSON GRACIEN PICKUP ELEC REV (DATED |
| 3-24-09) WL |
| 4/21/09 ELEC/MECH REV OK AND DENIED UNDER "T" |
| (LARGER BROWN SHELVES) FOR PICK UP. ONE FLAT |
| PACKAGE APPROX 12X30". CALLED AND SPOKE TO |
| GARCIEN, REMINDED OF BLUE CARD WITH A DATE OF |
| 3/24. DV PALMER. |
| 4/14/09 ELEC/FIRE REVISION DATED 3/10/09 P/U BY |
| KINSSON GRACIEN SLS |
| 4/10/09 CALLED FOR P/U "T" ROLLED PLAN MRW |
| 4/10/09 BLDG SUBMITTAL P/U BY KINSSON GRACIEN SLS |
| 4/10/09 PLBG/MECH REVISION #95 $260 SLS |
| 4-01-09 CALLED CONTRACTOR SPOKE WITH KINSSONPLANS |
| FILED UNDER "T" SMALL PLAN JW |
| 3/27/09 PLUMB REV $80 SPALMER |
| 3/24/09 ELEC/MECH REV $260 SPALMER |
| 03/17/2009 DENIED/APPROVED PLUMBING REVISIONS THAT |
| WERE SUBMITTED ON 02/19/2009 WAS P/U BY KINSSON |
| MMILLERR |
| 3-16-09 CALLED FOR P/U OF PLUMBING REVISIONS |
| SUBMITTTED 2-19-09 ONE APPROVED & ONE DENIED AND |
| SPOKE TO KINNSON G. INDICATING THE REQUIREMENT FOR |
| THE RECIEPT OR BLUE CARD. "T-LARGE" KSTEVENS. |
| 3-16-09 KINSSON GRACIEN PICKUP 2 SUBMITTALS (1 |
| DATED 2-23-09 "STOREFRONT" & 1 DATED 3-11-09 "EAST |
| STAIRS" 3) & REV #91 "SIGNED & SEALED RFI'S |
| 118-169" WL |
| 3-13-09 CALLED CONTRACTOR (2) SUBMITTALS READY FOR |
| PICK UP FILED UNDER "T" LARGE PLAN JW |
| 3/11/09 KINSSON P/U MECH REV DATED 2/19/09 SPALMER |
| 3/11/09 BLDG SUBMITTAL EAST STAIRS #3 SHOP |
| DRAWINGS NO FEE SPALMER |
| 3/10/09 ELEC/FIRE $320 SPALMER |
| 3/5/09 MECH REVISION CALLED FOR P/U. SPOKE TO |
| KINSSON. LG BIN UNDER "W" RJR |
| 2-27-09 KINSSON GRACIEN PICKUP PLUMB REV (DATED |
| 2-10-09) WL |
| 02-27-09 CALLED FOR P/U OF APPROVED PLMG REVISION |
| SUBMITTED 2-10-09 AND LEFT A MESSAGE ON KENSSON |
| G'S VOICE MAIL INDICATING THE REQUIREMENT FOR THE |
| RECIEPT OR BLUE CARD. "T" KSTEVENS. |
| 02/25/2009 BLDG SUBMITTAL NO FEE (EAST ROOF FASCIA |
| ENGINEERING) MMILLER |
| 02/25/2009 BLDG REVISION # 91 FEES $800.00 MMILLER |
| 2/23/09 BLDG SUBMITTAL REVISED DETAIL SHEET 8&9 |
| SEW |
| 2/19/09 MECHANICAL REV $110 SPALMER |
| 2/19/09 PLUMBING REV $110 SPALMER |
| 2/12/09 KINSSON P/U DENIED REV DATED 1/28/09 |
| SPALMER |
| 2-12-09 CALLED FOR P/U OF DENIED/APPROVED PLMG |
| REVISION #7 AND LEFT A MSG ON THE VOICE MAIL OF |
| KINSSON G. INDICATING THE REQUIREMENT FOR THE |
| RECIEPT OR BLUE CARD. "T-LARGE" KSTEVENS. |
| 2/10/09 PLUMBING REV RFI #159R DRAIN LINES-1 1/2" |
| FOR CUPOLA DRAIN PAN $80 SEW |
| 2/10/09 PU BY KINSON SEW |
| 2-06-09 CALLED KINSSON AT THE WEITZ CO PLANS FILED |
| UNDER "T" LARGE PLAN JW |
| 2/3/09 BLDG SUBMITTAL STAIR #4 SHOP DRAWINGS SEW |
| 2/3/09 REV PU BY KINSSON SEW |
| 2/2/09 REV DATED 1/6/09, READY FOR P/U, |
| UNDER(T)**LARGE BINNS**, LEFT VM MESSAGE ADARROUGH |
| 1-28-09 KINSSON GRACIEN PICKUP REV #15 (12-5-08) |
| WL |
| 1/28/09 REVISION #15 THAT WERE SUBMITTED ON |
| 12/5/08 |
| FILED FOR PICK UP UNDER 'T' (LARGE BIN) LM |
| 1/28/09 PLUMBING REV #7-STORM PIPING COORDINATION |
| SEW |
| 1-26-09 KINSSON GRACIEN PICKUP 3 BLDG SUBMITTALS |
| (DATED 1-6-09 .."STAIR 4 & RAILING SHOP DRAWINGS & |
| EAST ROOFS FASCIA" WL |
| 01-23-09 CALLED CONTRACTOR, SPOKE WITH KINSSON'S |
| VOICE MAIL PLANS FILED UNDER "T" LARGE PLAN JW |
| 01/06/2009 BLDG SUBMITTAL NO FEE (RAILING SHOP |
| DRAWINGS) MMILLER |
| 01/06/2009 BLDG SUBMITTAL NO FEE (STAIR 4 SHOP |
| DRAWINGS) MMILLER |
| 01/06/2009 BLDG SUBMITTAL NO FEE (EAST ROOFS |
| FASCIA "CONNECTION DETAILS") MMILLER |
| 01/06/2009 ELECTRICAL & MECHANICAL REVISION #086 |
| FEES $230 MMILLER |
| 1/5/09 KENSSON P/U 2 REV DATED 12/5/08 SPALMER |
| 1/5/09 KENSSON P/U REV DATED 12/16/08 SPALMER |
| 1/5/09 KENSSON P/U REV DATED 11/17/08 SPALMER |
| 1-02-09 CALLED THE CONTRACTOR PLANS FILED UNDER |
| "T" SMALL PLAN, SPOKE WITH KENSSON VOICE MAIL JW |
| 12/30/08 CALLED FOR PICK-UP SPOKE WITH KINSSON |
| PLANS FILED UNDER "T" SMALL PLANS JW |
| 12/30/08 REVISIONS FROM 11/17 ARE UNDER "T" (LARGE |
| BINS) FOR PICK UP.CALLED AND SPOKE TO KINSON AND |
| REMINDED OF BLUE CARD. DV PALMER. |
| 12/22/08 REVISIONS FROM 11/17 ARE UNDER "T" |
| WAITING FOR THE ENGINEER TO COME IN AND SIGN, DATE |
| AND SEAL PLANS. SEE ELECTRICAL REVIEW DATED 12/17. |
| DO NOT RELEASE PLANS. DV PALMER. |
| |
| |
| 12/16/08 SUBMITTAL EXTERIOR FRAMING DETAILS NO FEE |
| SPALMER |
| 12/5/08 BLDG/ELEC/PLUMBING/MECH REV CCD #15 SEW |
| 12/5/08 BLDG SUBMITTAL GLASS HANDRAIL ENGINEERING |
| SEW |
| 12/5/08 BLDG SUBMITTAL LOUVERS AT THE CUPOLA |
| EXTERIOR FASTENING DETAILS SEW |
| 11/17/08 ELEC & FIRE REVISION # 84 $380 SLS |
| 11-13-08 KINSSON GRACIEN PICKUP (3) BLDG |
| SUBMITTALS "CUPOLA"(DATED 10-7-08), RFI RESPONSES |
| (DATED 10-29-08) & MOD BIT RFG SYS (DATED 11-4-08) |
| WL |
| 11-12-08 CALLED CONTRACTOR FILED UNDER "T" SMALL |
| PLANS SPOKE WITH KINSSON JW |
| 11-07-08 CALLED CONTRACTOR AND SPOKE WITH KINSSON |
| SUBMITTALS FILED UNDER "T" SMALL PLAN JW |
| 11-4-08 BLDG SUBMITTAL NO FEE CHARGED "MODIFIED |
| BITMEN RFG SYS FOR STEEL DECK ROOF AT EAST SIDE OF |
| ROTUNDA" WL |
| 10/29/08 BLDG REV $ SPALMER |
| 10-24-08 KINSSON GRACIEN PICKUP BLDG/ELEC/FIRE CCD |
| # (9-18-08) WL |
| 10/23/08 CALLED FOR P/U "T" LARGE BIN MRW |
| 10/7/08 BLDG SUBMITTAL STORE FRONT SHOP DRAWINGS |
| NO FEE SPALMER |
| 9/30/08 KINSSON P/U SHOP DRAWINGS 3RD/4TH FLOOR |
| FRAMING SPALMER |
| 9-30-08 CALLED FILED UNDER"T" SMALL PLANS SPOKE |
| WITH |
| KINSSON JW |
| 9/18/08 BLDG REV CCD #14 REVISION INTERIOR & RFI |
| CLARIFICATION SEW |
| 9/18/08 BLDG SUBMITTAL 3RD & 4TH FLOOR STRUCTURAL |
| STEEL SHOP DRAWINGS SEW |
| 9-4-08 KINSSON G PICKUP MECH REV "2 COPIES" (DATED |
| 8-28-08) WL |
| 9-4-08 P/F MECH/REV. CALLED KINSSON P/U "T" TG. |
| 9/2/08 KINSSON P/U SUBMITTAL SPALMER |
| 8-29-08 SUBMITTAL, CALLED CONTRACTOR AND SPOKE |
| WITH |
| KINSSON SUBMITTAL IS FILED UNDER "T"**LARGE BIN** |
| JW/WL |
| 8-28-08 MECH/REV. NO FEE TG. |
| 8/26/08 BLDG SUBMITTAL SHOP DRAWINGS SIGNED & |
| SEALED W/CALCS & SHORING DESIGN SEW |
| 8/26/08 3 BLDG & 1 MECH PU BY KINSSON SEW |
| 8-25-08 CALLED CONTRACTOR AND SPOKE WITH |
| KENSONPLANS FILED UNDER T" LARGE PLANS JW |
| 8-22-08 CALLED KINSSON TO P/U "T" 'LARGE BEN' |
| MECH/REV. NEED TO BE SEALED BY ENGINEER, NO FEE |
| WHEN RETURNED TG. |
| 8-21-08 2 REVISIONS REV #80 MECH $100 "ATTN TOM |
| GORDON PER MTG 8-14-08 PLS FIND 3 COPIES OF SIGNED |
| SEALED LTR FROM HANSON & REVISION SHEETS |
| AC-1,AC-2,AC-3,AC-4,& SHEET M7.03 REVISION 3, REV |
| #81 BLDG $380 "PLS FIND SIGNED & SEALED SKETCHES |
| FOR RFI RESPONSES NO EXTERIOR CHGS IN SUBMITTED |
| RFI SKETCHES" WL |
| 8-15-8 CALLED FOR P/U PLMG REVISIONS AND LET HIM |
| KNOW THE REVISIONS WERE APPROVED AND THAT THE |
| RECIEPT OR BLUE CARD WAS REQUIRED TO RETRIEVE THE |
| REVISIONS. "T" LARGE KSTEVENS |
| 8/12/08 BLDG SUBMITTAL STRUCTURAL STEEL SHOP |
| DRAWINGS SEW |
| 8/12/08 BLDG SUBMITTAL EXTERIOR FRAMING SEW |
| 8/6/08 PLUMBING REV ADDRESSING DENIED COMMENTS $80 |
| SEW |
| 7/28/08 PLUMBING REVISIONS P/U BY KINSSON SLS |
| 7-24-08 CALLED FOR P/U (3) AND TALKED TO KINSSON |
| INDICATING THAT SOME REVISIONS WERE DENIED AND |
| SOME APPROVED AND THAT THE RECIEPT OR BLUE CARD |
| WAS REQUIRED TO RETRIEVE THE REVISIONS. "T-LARGE" |
| KSTEVENS. |
| 7/23/08 PU BY KINSSON SEW |
| 8/17/08 CALLED KINSSON TO P/U PLANS, LARGE BIN "W" |
| RVC |
| 7/15/08 PLUMB REV OVER FLOW DRAIN OUTLET $70 |
| SPALMER |
| 7/15/08 PLUMB REV $100 SPALMER |
| 7/15/08 ENG REV $70 SPALMER |
| 7-9-08 KINSSON GRACIEN PICKUP BLDG SUBMITTAL |
| DATEED (6-30-08) RFI #008 WL |
| 7-09-08 CALLED COMTRACTOR AND SPOKE WITH KENSSON, |
| (2) SUBMITTALS FILED UNDER "T" LARGE PLANS JW |
| 07/02/2008 APPROVED/DENIAL BLDG ELECTRICAL |
| PLUMBING & MECHANICAL REVISION THAT WAS SUBMITTED |
| ON 05/29/2008 WAS P/U BY TIFFIANY KERPS MMILLER |
| 7-2-08 CALLED FOR P/U OF P-M-E REVISIONS AND |
| TALKED TO DOUG INDICATING THAT THE E & M REVISION |
| PASSED AND THAT 2 P REVISION PASSED, 2 FAILED AND |
| THAT THE BLUE CARD OR RECIEPT IS REQUIRED TO |
| RETRIEVE THE REVISIONS. "T-LARGE" KSTEVENS |
| 6/30/08 BLDG SUBMITTAL TYPICAL WINDOW ANCHORING |
| SPALMER |
| 6/27/08 BLDG SUBMITTAL ALUM STOREFRONT & ENTRANCE |
| SHOP DRAWINGS & NOA'S SEW |
| 6-26-08 KINSSON GRACIEN PICKUP 4 BLDG SUBMITTALS, |
| (EXTER FRAMING DETAILS DATED 6-16-08, STRUCTURAL |
| STEEL TEMP BRACE SHOP DRAWINGS FOR SUPPORT OF |
| ROTUNDA BLDG DATED 6-16-08, BLDG ENGINEERING & NOA |
| FOR GAF RUB MOD ROOF SYS FOR CONCR DECKS FOR 3 |
| STORY ADDIT DATED 6-9-08, BLDG HELICAL PILE REV #3 |
| DATED 6-9-08) WL |
| 6-26-08 CALLED CONTRACTOR AND SPOKE WITH KINSSON |
| PLANS FILED UNDER "T" LARGE PLAN JW |
| 6/16/08 BLDG SUBMITTAL STRUCTURAL STEEL ROTUNDA |
| BLDG NO FEE SPALMER |
| 6/16/08 BLDG SUBMITTAL EXTERIOR FRAMING DETAILS NO |
| FEE SPALMER |
| 6/9/08 BLDG SUBMITTAL ENGINEERING & NOA FOR GAF |
| RUBEROID MOD BITUMEN ROOF SYSTEM FOR CONCRETE |
| DECKS SEW |
| 6/9/08 ELEC REV ES.03 $60 SEW |
| 6/9/08 BLDG REV ADDRESSING DENIED COMMENTS $280 |
| SEW |
| 6/3/08 BLDG REVISIONS DATED 5/29 & 4/16 P/U BY |
| KINSSON SLS |
| 6-03-08 CALLED CONTRACTOR SPOKE WITH DOUG PLANS |
| FILED UNDER "T" SMALL PLANS JW |
| 5/29/08 ELEC/PLUMBING/MECH REV M1.01 P1.01 PL.03 |
| P3.05P5.01 E2.01 SEW |
| 5/29/08 BLDG REV ADDRESSING COMMENTS OF THE UPLIFT |
| CAPACITY OF THE HELICAL PIERS BOLT * NEW CONST |
| SEW |
| 5/29/08 PU BY KINSSON SEW |
| 05/20/08 CALLED FOR PLANS P/U; IN LARGE BIN "W" |
| MAW |
| 05-08-08 DOUG STRATHIE PICKUP BLDG REV BULLETIN #6 |
| HELICAL PIER SHOP DRAWINGS WL |
| 05-07-08 CALLED CONTRACTOR FILED UNDER "T" LARGE |
| PLANS |
| LEFT MESSAGE ON DUOGS ANSWER MACHINE JW |
| 04-30-08 CALLED CONTRACTOR AND SPOKE WITH VOICE |
| MAIL FOR KINSSON, PLANS FILED UNDER "T" SMALL PLAN |
| JW |
| 04/22/08 BLDG REV FOR PHASE II CLARIFICATIONS $230 |
| SPALMER |
| 04/22/08 BLDG REV BULLETIN #6 HELICAL PIER SHOP |
| DRAWINGS $290 SPALMER |
| 4/16/08 BLDG REV DETAILS & CLARIFICATIONS |
| REGARDING CONCRETE RESTORATION $90 SEW |
| 4/16/08 ELEC/PLUMBING/MECH/FIRE REV PER CITY'S |
| REVIEW COMMENTS $520 SEW |
| 3-11-08 NITA PENNINGTON PICKUP BLDG REV DATED |
| 2-28-2008 WL |
| 3-10-08 CALLED CONTRACTOR SPOKE WITH NITA CONCRETE |
| REPAIR SKETCHES FILED UNDER "T" SMALL PLAN JW |
| 2/28/08 BLDG REV ADDL REPAIR DETAILS FOR |
| RESTORATION OF EXISTING CONCRETE BEAM $70 SEW |
| 1-29-08 NITA PENNINGTON PICKUP REV WL |
| 1-29-08 CALLED FILED UNDER "T"SMALL PLAN JW |
| 1/9/08 BLDG REV PROJ MANUAL/SKETCHES FOR CONCRETE |
| RESTORATION REPAIR DETAILS $310 SPALMER |
| 1-7-08 NITA PENNINGTON PICKUP REV #63,#64, & #65 |
| WL |
| 01-07-08 CALLED CONTRACTOR SPOKE WITH NITA FILED |
| UNDER "T" SMALL PLANS JW |
| 12/26/2007 BLDG REVISION #65 FEES $60.00 MMILLER |
| 12/26/2007 BLDG REVISION #64 FEES $ 60.00 MMILLER |
| 12/26/2007 BLDG REVISION #63 FEES $70.00 MMILLER |
| 12/3/07 DENIED BLDG REV #61 P/U BY NITA AJP |
| 11/30/07 DENIED REVISION #58 CALLED FOR P/U |
| UNDER(T), LEFT MESSAGE **LARGE BINNS** |
| ADARROUGH |
| 11/5/07 DENIED REVISION (3 ROLLS OF PLANS)P/U BY |
| NITA AJP |
| 11-5-7 CALLED FOR P/U AND LEFT A MESSAGE WITH THE |
| SECRETARY. INDICATED THAT THE REVISIONS SUBMITTED |
| AUG. 31 07 WERE READY FOR P/U AND THAT SOME WERE |
| APPROVED AND OTHERS HAD COMMENTS. TOLD HER THAT |
| THE REVIEPT OR BLUE CARD WAS REQUIRED TO RETRIEVE |
| THE REVISIONS. "T-LARGE" KSTEVENS |
| 11/01/07 REVISION ( APPROVED BLDG, DENIED FIREL) |
| P/U BY NITA AJP |
| 11/01/07 CALLED FOR ARCH REV FOR P/U LARGE BIN "W" |
| MAW |
| 10/25/07 APPROVED ENG. REV. P/U BY NITA AJP |
| 10/16/07 ENG. REV. FILED UNDER 'T' LM |
| 10/5/07 NEW NOC PROVIDED BY NITA AJP |
| 10/02/2007 BLDG REV # 58 FEES $ 230.00 MMILLER |
| 10/01/07 ENG REV $60 SPALMER |
| 9/18/07 DENNIED ENG.REV. P/U BY NITA PENNINGTON |
| AJP |
| 9/6/07 CALLED 681-4807, THIS IS NOT THEIR PROJECT, |
| BIN "T",RVC |
| 8/31/07 BLDG REV SEW |
| 8/31/07 ELEC/PLUMBING/MECH/FIRE REV SEW |
| 8/31/07 ENGINEERING REV $60 SEW |
| 6/5/07 ALYCE P/U ELEC REV DATED 5/29/07 SPALMER |
| 6/5/07 ELEC REV OK,CALLED LEFT MESSAGE ON ALYCE'S |
| VM/CELL. TOLD TO BRING IN BLUE CARD/RECIEPT. DV |
| PALMER. |
| 5/29/07 ELEC REVISION $80 SLS |
| 5/21/07 PU BY ELISE SEW |
| 5-18-07 P MECH/ELEC. REV. LEFT MSG. P/U "T" TG. |
| 05/01/2007 ELECTRICAL REVISION FEES $80.00 |
| (RELOCATION/ADDITION OF VAV AND ASSOCIATED |
| DUCTWORK INELECTRICAL ROOMS 2A24,3A16,3828 DUE TO |
| EXCESSIVE HEAT FROM THE TRANSFORMERS WHERE DRYWALL |
| CEILINGS OCCUR SEE ENGINEERS SKETCHES MMILLER |
| 3/9/07 ALYCE P/U ELEC REV DATED 1/17/07 SPALMER |
| 3/9/07 ALYCE P/U BLDG SUBMITTAL DATED 1/25/07 |
| SPALMER |
| 3/9/07 ALYCE P/U REV DATED 1/24/07 SPALMER |
| 3/9/07 ALYCE P/U REV DATED 1/17/07 SPALMER |
| 3-6-07 P MECH/REV. CALLED ALYCE P/U "T" TG. |
| 3-6-7 CALLED FOR P/U "T" KSTEVENS |
| 2/15/07 ALYCE P/U 2 SUBMITTALS & 1 REV SPALMER |
| 2/8/07 ELEC SUBMITTAL UNDER "T" FOR PU,CALLED, |
| LEFT MESSAGE ON ALYCE;S VM. DV PALMER. |
| 2-7-07 F MECH/REV. LEFT MSG. P/U "T" TH. |
| 2-06-07 CALLED FILED UNDER "T" JW |
| 2/3/07 ELEC REV'S FROM 1/17 OK,CALLED, LEFT |
| MESSAGE ON ALYCE'S VM. UNDER "T" (LARGE BINS). DV |
| PALMER. |
| 2/2/07 PARTIAL CERTIFICATE OF OCCUPANCY ISSUED. |
| SEE NOTES. HHP |
| 2/2/07 REINSPECTION FEE $50 SPALMER |
| 01/31/07 ELECTRICAL SUBMITTAL NO FEE- ROUTED TO D |
| PALMER DESK FG |
| 01/26/07 RECV'D LETTER FOR TCO $500 FEE ROUTED TO |
| H PISKURA DESK FG |
| 01/25/07 RESUBMITTED ORNAMENTAL GLASS RAIL SHOP |
| DRAWINGS PER JERALD SMITH FG |
| 01/25/07 BLDG SUBMITTAL NO FEE- LETTER ROUTED TO H |
| PISKURA DESK FG |
| 1/25/07 ALYSE P/U SUBMITTAL DATED 1/22/07 SPALMER |
| 01-25-07 CALLED FILED UNDER "T" JW |
| 01/24/2007 PLUMBING REVISION FEES $ 60.00 MMILLER |
| 01/22/2007 BLDG SUBMITTAL NO FEES MMILLER |
| 01/22/2007 ELECTRICAL & MECHANICAL REVISION FEES $ |
| 60.00 MMILLER |
| 01/17/07 REV $190 FEE ELECTRICAL CLEANUP FG |
| 01/17/07 REV $60 FEE- REVISED FLOOR SINKS/DRAINS |
| IN JAZZMAN'S FG |
| 1/10/07 ALYSSE P/U REV SPALMER |
| 1-3-07 MECH REV CALLED FOR P/U UNDER T PHK |
| 12/22/06 SUB/LETTER/ATTN NEIL/(PLACED IN DIANE'S |
| INBOX) PT |
| 12/22/06 REV/MECH P/U BY ALYCE PT |
| 12/22/06 REV/MECH & FIRE P/U BY ALYCE PT |
| 12/22/06 REVISED PLANS (FIRE COMMAND PANEL)READY |
| FOR P/U UNDER "W" MAW/FIRE 12/20/06 CALLED FOR P/U |
| PLANS IN BOX T HM. 12-19-06 ALYCE HANNA PICKUP |
| FIRE REV DATED 12-4-05 WL |
| 12/19/06 REVSED PLANS READY FOR P/U UNDER "W" |
| MAW |
| 12/08/06 MECH SUBMITTAL LTR TO NMELICK SPALMER |
| 12/08/06 MECH SUBMITTAL NO FEE SPALMER |
| 12/08/06 ALYCE P/U REV DATED 12/05 12/04 SPALMER |
| 12/7/06 ELEC REV FROM 12/4, 12/5, 12/6 UNDER "T" |
| FOR PU, CALLED SPOKE TO ALYCE. (LARGE BINS). DV |
| PALEMR. |
| 12/06/06 SUBMITTAL FIVE PUMP & CONTRLR NO FEE |
| SPALMER |
| 12/05/06 ELECTIRCAL REV $ 100.00 MMILLER |
| 12/05/06 ALYCE P/U 2 ELEC REV DATED 11/22/06 |
| SPALMER |
| 12/5/06 2- ELEC REV'S FROM 11/22 UNDER "T" FOR PU. |
| (SMALL) LEFT MESSAGE ON ALYCE'S VM. DV PALMER. |
| 12/04/06 MECH SUBMITTAL NO FEE- RETURN AIR PLENUM |
| ISSUE -ATTN H MOSER- ALBERTO FERNANDEZ FG 12/04/06 |
| BLDG SUBMITTAL NO FEE-GIVEN TO R BROWN |
| FG |
| 12/4/06 FIRE REV $60 FEE- REVISED PUMP SIZE FG |
| 12/04/06 ELEC REV $70 FEE- SHEET E4.01 REDUCED |
| MOTOR SIZE FOR FIRE PUMP FROM 60HP-50HP FG |
| 12/04/06 ALYCE P/U SUBMITTAL DATED 11/15/06 |
| SPALMER |
| 11/30/06 ELEC SUBMITTIAL FROM 11/15 UNSAT,CALLED |
| LEFT MESSAGE FOR ALYCE. DV PALMER. |
| 11/22/06 ELEC REV ADDED BATTERY BACKUP FOR LTS IN |
| ELEC ROOMS SEW |
| 11/22/06 ELEC REV ADD'L LIGHTING & REVISED BOARD |
| ROOM LIGHTING SEW |
| 11/15/06 ELEC SUBMITTAL ENGINEERS |
| APPROVAL/ACKNOWLEDGEMENT OF SYSTEM SEW |
| 11/15/06 MECH REV $60 SEW |
| 11/15/06 PU BY ALYCE (2) SEW |
| 11/14/06 ELEC REV FROM 11/6 WITH THE ELEC REV FROM |
| 11/3. CALLED AND LEFT A MESSAGE WITH ON ALYCE'S |
| VM. TOLD TO BRING IN BLUE CARD RECEIPT FOR EACH. |
| UNDER "T"FOR PU. DV PALMER |
| 11/13/06 ELEC REV'S FROM 11/3 OK, CALLED LEFT |
| MESSAGE ON ALYCE'S VM. UNDER "T" FOR PU, DV |
| PALMER |
| 11/6/06 ELEC REVISION $60 SLS |
| 11/03/06 MECH REV $60.00 MMILLER |
| 11/03/06 ELEC REV $70.00 MMILLER |
| 11/03/06 ALYCE P/U REV DATED 10/17/06 SPALMER |
| 11/03/06 ALYCE P/U REV DATED 9/26/06 SPALMER |
| 11/3/06 CALLED FOR P/U UNDER T PHK 10/30/06 ALYCE |
| P/U REV DATED 10/25/06 SPALMER 10/28/06 ELEC REV |
| OK/UNSAT, UNDER "T" FOR PU, CALLED, LEFT MESSAGE |
| FOR ALYCE. TOLD TO BRING BLUE CARD. DV PALMER |
| 10/25/06 ELEC REV $70 SPALMER |
| 10/23/06 ALYCE P/U ELEC REV DATED 8/18/06 SPALMER |
| 10/23/06 ALYCE P/U ELEC REV DATED 9/5/06 SPALMER |
| 10/23/06 ALYCE P/U 2 ELEC REV DATED 9/26/06 |
| SPALMER |
| 10/23/06 ALYCE P/U ELEC REV DATED 10/13/06 |
| SPALMER |
| 10/21/06 ELEC REV OK,CALLED,UNDER "T" (LARGE |
| BINS)FOR PU, LEFT MESSAGE ON ALYCE'S VM,TOLD TO |
| BRING IN BLUE CARD. DV PALMER. |
| 10/21/06 SUBMITTED UPDATED RE-RECORD NOC. DVP. |
| 10/17/06 MECH REV (M6.0INLINE PUMP DETAIL) $60 |
| TA |
| 10/13/06 ELEC REV SEW |
| 10/05/06 ELEC LTR AND ELEC REV **LARGE BINS** "T" |
| FOR PU, CALLED ALYCE FOR PU. DV PALMER |
| 10-02-06 CALLED FILED UNDER "T" JW |
| 9/26/06 FIRE REV (REV PIPE ROUTING IN STH STRWL) |
| $80 TA |
| 9/26/06 ELEC REV $100 TA |
| 9/26/06 BLDG REV (PARTITION CHGS) $90 TA |
| 9/26/06 ELEC/MECH REV $120 TA |
| 9/26/06 SUBMITTAL OF ROOF CRICKET DETAILS. NO FEE |
| TA |
| 9/26/06 SUBMITTAL OF ELEC LTR FOR DP NO FEE TA |
| 9/26/06 ALYCE P/U ELEC REV SPALMER |
| 9/22/06 ELEC REV'S UNDER "T" (LARGE BINS0 SPOKE TO |
| ALYCE, SOME SHEETS OK, SOME NOT. DV PALMER. |
| 9/12/06 ELEC REV (SITE LGT,MOTORIZED SHDS,PANIC, |
| MISC RELOC) $150 TA |
| 9/12/06 MECH REV (RELOCATED FIREMAN'S PANEL)$60 |
| TA |
| 9/5/06 ONE APPROVED BLDG REV, FIVE APPROVED BLDG |
| SUBMITTALS, AND ONE DENIED BLDG SUBMITTAL P/U BY |
| ALYCE AJP |
| 9/5/06 BLDG REV SEW |
| 8/31/06 MOVED TO SLARGE PLAN BIN "T" AJP |
| 8-31-06 CALLED FILED UNDER "T" JW |
| 8/22/06 APPR. P;LUMBING REV. P/;U BY ALYCE AJP |
| 8-22-6 CALLED FOR P/U PLMG REV "T" KSTEVENS |
| 8-18-06 BLDG REV # 32 $80 ADDED DUCT ENCLOSURE FOR |
| EF-6A REVISED SHEETS A1.04, A1.06, & A1-08 WL |
| 8-18-06 BLDG REV # 31 $60 NON-RATED CEILING ABOVE |
| ELEC PANELS IN ROOM 3416 PARTIAL SHEET A6.06 WL |
| 8/17/06 BLDG SUBMITTAL NO FEE SLS |
| 8/17/06 - PLBG REVISION $90 SLS |
| 8/15/06 EL. REV. AND PLUMBING REV. P/U BY ALYCE |
| AJP |
| 8-15-6 CALLED FOR P/U "T" KSTEVENS |
| 8/10/06 APPROVED PLUMBING/EL REV. P/U BY ALYCE |
| AJP |
| 8-10-6 CALLED FOR P/U "T" KSTEVENS |
| 8/2/06 (2) BLDG SUBMITTALS SHOP DRAWINGS SEW |
| 8/2/06 PLUMBING REV SEW |
| 7/27/06 ELEC REV FROM 7/25 UNDER "T" FOR |
| PU,CALLED. DV PALMER |
| 7/27/06 SUBMITTIALS FROM 7/25 PICKED UP BY ALYCE. |
| DV PALMER |
| 7/25/06 CALLED FOR P/U PLANS IN BOX T HM. |
| 7/25/06 ONE SET OF ROLLED PLANS( STEEL TRUSS AND |
| STEEL DECK SHOP DRWGS) AND TWO APPROVED EL. REV'S |
| P/U BY ALYCE AJP |
| 7/25/06 BLDG SUBMITTAL NO FEE FG |
| 7/25/06 ELECTRICAL REV $60 FEE- REVISED ROUTING OF |
| COMMUNICATIONS LINES FG |
| 7/24/03 TWO ELEC REV'S FROM 7/13 ARE IN THE "LARGE |
| BINS" UNDER "T" FOR PU. DV PALMER. |
| 7/13/06 ELEC/PLUMBING/BLDG SUBMITTAL SEW |
| 7/13/06 ELEC REV LTGING CONTROL/MISC SEW |
| 7/13/06 ELEC REV FLOOR BAY $100 SEW |
| 7/13/06 MECH REV $60 SEW |
| 7/13/06 PU BY ALICEY SEW |
| 7-10-06 CALLED FILED UNDER "T" LARGE PLAN PICK-UP |
| JW |
| 7-03-06 CALLED FILED UNDER "T" SMALL & LARGE PLAN |
| PICK-UP JW |
| 6/30/06 PU BY TOM SEW |
| 6/25/06 ELEC REV OK,CALLED,LEFT MESSAGE ON ALYCE |
| VM,UNDER"T" FOR PU. DV PALMER |
| 6/20/06 ELEC REV FOR ADM MACHINES SEW |
| 6/20/06 MECH REV DUCT WORK FOR SMK DET SEW |
| 6/20/06 BLDG SUBMITTAL FOR STRUC STEEL & STEEL |
| DECK SEW |
| 6/20/06 BLDG SUBMITTAL FOR STATE/LOCAL PROD |
| APPROVALS FOR TRAINOR GLASS CO SEW |
| 6/20/06 BLDG SUBMITTAL FOR ALUM STAIR SEW |
| 6/20/06 BLDG SUBMITTAL FOR ENG FRAMING FOR E & Y |
| WINDOWS SEW |
| 6/20/06 PU BY ALYCE SEW |
| 6-15-06 CALLED FILED UNDER "T" JW |
| 6/9/06 ALYCE P/U SUBMITTAL FROM 4/17/06 SPALMER |
| 6/9/06 BLDG SUBMITTAL SEW |
| 6-1-6 CALLED FOR P/U "T" KSTEVENS |
| 5/23/06 ELEC/PLUMB/MECH/ FIRE CAULKING SUBMITTALS. |
| NO FEE. TA |
| 5/23/06 BLDG REV & SUB P/U BY ALYCE. TA |
| 5/14/06 ELEC REV UNSAT,CALLED,UNDER "T" LARGER |
| PLANS BIN FOR PU. DVP |
| 5/9/06 CALLED FOR P/U "T" MRW ON TOP SHELF |
| 5/5/06 MOVED TO LARGE PLAN BIN "T" AJP |
| 5/04/06 CALLED FILED UNDER "T" JW |
| 5/1/06 BLDG SUBMITTALOF SHORING DRAWINS AND |
| COMPLIANCE. NO FEE TA |
| 5/1/06 BLDG SUBMITTAL OF ROOF SHEATHING |
| ASSEMBLIES. NO FEE TA |
| 5/1/06 BLDG SUBMITTAL OF ANCHARAGE CALCULATIONS |
| FOR EXTERIOR KEYSTONE. NO FEE TA |
| 5/1/06 BLDG REV SUBMITTED $230 FEE CHG. TA |
| 5/1/06 ELEC REV SUBMITTED $130 FEE CHG. TA |
| 5/1/06 MECH REV SUBMITTED $80 FEE CHG. TA 4/25/06 |
| TWO APPROVED REV'S(1 BLDG,1 EL.) P/U BY ALYCE AJP |
| 4/24/06 ELEC REV OK,CALLED, UNDER "T" (BIG |
| PACKAGE) FOR PU. DV PALMER. |
| 4/20/06 CALLED, FILED UNDER "T" JW |
| 4/17/06 ELECTRICAL REV $120 FEE FG |
| 4/17/06 BLDG SUBMITTAL NO FEE ROUTED TO H PISKURA |
| DESK FG |
| 4/17/06 BLDG SUBMITTAL NO FEE FG |
| 4/17/06 BLDG REV $60 FEE FG |
| 4/17/06 ELECTRICAL AND PLUMBING REV $100 FEE FG |
| 4/5/06 ONE PLUMBING/MECH REV., FOUR BLDG |
| REV.'S(INCLUDES LETTERS, SHOP DRAWINGS), AND THREE |
| EL. REV.'S P/U BY ALYCE |
| 4-04-06 CALLED FILLED UNDER "T" JW |
| 4/3/06 THREE ELECTRICAL REV'S, 2 OK, 1 UNSAT, |
| UNDER "T" FOR PU (IN LARGER PLANS BIN). CALLED. DV |
| PALMER |
| 3/30/06 PLUMB/MECH REV $60 SPALMER |
| 3/30/06 ELEC REV $120 SPALMER |
| 3/30/06 BLDG REV $70 SPALMER |
| 3/30/06 SUBMITTAL EXT METAL STUD FRAMING ENG SHOP |
| DRAWINGS SPALMER |
| 3/30/06 SUBMITTAL LTRS ELEC NO FEE SPALMER |
| 3/24/06 PLUMBIN/MECH REV. P/U BY ALYCE AJP 3/23/06 |
| PLBG & MECH REV CALLED FOR P/U UNDER "T" MRPERSON |
| 3/20/06 ELEC. REV. P/U BY CINDY AJP |
| 3/17/06 ELECV REV FROM 2/15/06,UNSAT UNDER"T" FOR |
| PU,CALLED. DV PALMER. |
| ************************************************** |
| ************************************************** |
| ************************************************** |
| ************************************************** |
| ************************************************* |
| |
| 11-19-04 3 SETS OF ROLLED PLANS (CONTR |
| MISCALCULATED FEES PAID $31968.00 INSTEAD OF |
| 30%)OK PER L MARTINEZ TO TAKE IN PERMIT APPL WL |
| 12-30-4 CALLED FOR P/U "BELOW UNDER "B/C" |
| KSTEVENS |
| 1-26-05 LARRY P/U PLANS |
| 2/10/05 1ST RESUB/NC PLANS + APP PT |
| 4-4-05 CALLED FOR P/U ON THE BOTTOM SHELF PHK |
| 5-16-05 LARRY P/U PLANS NF |
| 5-26-05 2ND RESUB "ROLLED PLANS" WL |
| 7/1/05 3RD PLAN SUBMITTAL NO FEE DPALMER |
| 7/26/05 ALYCE P/U PERMIT SPALMER |
| 8/5/5 REVISION $1120 FEE FG |
| 8-12-5 REV $80 - KAM |
| 8-12-5 SUBMITTAL TO HAROLD P - KAM |
| 8/20/05 SUBMITTALS FILED UNDER "T" JW |
| 8-22-05 ALLYSE P/U PERMIT NFL |
| 9-1-05 REV #3 BLDG WL |
| 9-08-05 CALLED, FILED UNDER "T" JW |
| 9/9/05 ALYCE P/U REV SPALMER |
| 9-13-05 REV/CALLED FOR P/U UNDER T |
| 9/14/05 ALYCE P/U REV SPALMER |
| 10/4/05 SUBMITTAL NO FEE SPALMER |
| 10-13-05 REV #4 BLDG WL |
| 10-14-05 CALLED FILED UNDER "T" JW |
| 10/21/05 ALYCE P/U PERMITS LMILLER |
| 11/07/05 BLDG SUBMITTAL GIVEN TO H PISKURA NO FEE |
| FG |
| 11-16-05 CALLED FILED UNDER "T" JW |
| 11/21/05 RECEIVED SUB NO FEE,SHORING DRAWINGS. LTM |
| 12-2-05 BLDG SUBMITTAL 3RD FLR SHORING COMPLIANCE |
| LTRS WL |
| 12-2-05 BLDG SHORING DRAWINGS FOR 4TH FLOOR & ROOF |
| WL |
| 12/8/05 SUBMITTAL LOCAL APPR NOA FOR TRAINOR GLASS |
| SYSTEMS & SHORING DRAWINGS FOR JIM WITMER SPALMER |
| 12/28/05 PLANS P/U BY ALYCE AJP |
| 1/5/06 5TH REVISION $130 FEE. LTM |
| 1-9-06:4TH FL & ROOF SHORING DRAWINGS FAILED, |
| CALLED 4 PU. UNDER T. JAH |
| 01/20/06 SUBMITTAL NO FEE - 4TH FLOOR SHORING |
| COMPLIANCE LETTERS FG |
| 01/23/06 PLUMBING REV $60 FEE FG |
| 1/27/06 MECH REV $60 SPALMER |
| 2-14-06 P MECH. REV. CALLED ALYCE P/U "T" TG. |
| 2/14/06 ALYCE P/U SUBMITTALS 4TH FL AND ROOF |
| SHORING DRAWINGS/ROUTING FOR CHILLED WATER PIPING |
| SPALMER |
| 2-14-06 CHANGE OF CONTRACTOR RFG #04111078 (SUB) |
| $50 NFL |
| 2-14-06 ZELDA P/U PERMIT NFL |
| 2/15/06 8TH REV ELEC DRAWINGS/PLANS FEE 120.00 |
| 2-21-6 CALLED FOR P/U PLMB REV "T" KSTEVENS |
| 2/22/06 CINDY P/U PLUMB REV SPALMER |
| 3/17/06 BLDG/ELEC REV FEE CHG TA |
| 03/17/06 ELEC REV FEE TA |
| 3/17/06 ELEC REV FEE CHG FOR 14 PGS |
| 3/17/06 MECH REV FEE FOR 4 PAGES TA |