| Miscellaneous Information / Notes |
| 5 STORY BLDG WITH 6 STORY ATTACHED PARKING GARAGE |
| |
| |
| |
| |
| |
| |
| 5/14/07 BEN P/U HEALTH DEPT REV SPALMER |
| 5-07-07 CALLED FILED **LARGE BINS** "P" JW 5/4/07 |
| PARTIAL CO ISSUED, SEE NOTES HHP |
| 5/3/07 BEN P/U ELECTRICAL REV. DATED 5/2/07./WRT. |
| 5/3/07 BEN P/U PLUMB REV DATED 4/2/07 SPALMER |
| 5-3-7 CALLED FOR P/U PLMG REV "P-LARGE" KSTEVENS |
| 5/2/07 ELEC REV $70 SPALMER |
| 5/2/07 BEN P/U MECH REV DATED 4/20/07 SPALMER |
| 4/25/07 MECH REV M2.1A,M2.5 CALLED FOR P/U SM BIN |
| UNDER "P" RJR |
| 4/23/07 BEN P/U ELEC REV DATED 4/22/07 SPALMER |
| 4/20/07 ELECTRICAL REV. UNDER "P"./WRT. |
| 4/20/07 MECH REVISION # 27 $70 SLS |
| 04/06/2007 BLDG REVISION (MEATAL LOUVER IN LIFT |
| STATION FEES $ 80.00 MMILLER |
| 04/05/2007 MECHANICAL REVISION WITH RATED FIRE |
| ASSEMBLY WITH FIRE DAMPER INSTALATION IN SHAFT |
| WALL P/U BY BEN MMILLER |
| 04-05-07 BEN DYER PICKUP BLDG SUBMITTAL DATED |
| 3-22-07 & REV # 34 ELEC DATED 3/13/07 |
| 04-03-07 CALLED FILED **LARGE BINS** "P" JW |
| 04/02/2007 ELECTRICAL REVISION FEES $ 70.00 |
| (ADDPOWER TO THE EMS PANELS IN THE PHONE ROOM & |
| SECURITY ROOM ON THE 1ST FLOOR AS WELL AS THE 5TH |
| FLOOR MECHANICLA ROOM SHOULD CORESPOND WITH E3-1A |
| AND E617 THAT WERE SUBMITTED ON 03/29/2007) |
| MMILLER |
| 04/02/2007 PLUMBING (ASBUILT SET) REVISION FEES |
| $190.00 MMILLER |
| 3/30/07 3RD TCO ISSUED SEE NOTES HHP |
| 03/30/07 RECV'D LETTER FOR TCO $500 FEE- ROUTED TO |
| H PISKURA DESK FG |
| |
| |
| 3.29.07 MECH ROOM WALL DETAIL CALLED FOR P/U SM |
| BIN UNDER 'P' RJR |
| 03/28/07 BEN P/U ZONING REV DATED 3/20/07 NEEDED |
| ADDITIONAL INFO NO REVIEW DONE AT ALL - WHEN COMES |
| BACK IN NO FEES ARE TO BE CHARGED FG |
| 03/28/07 BEN P/U REVISION FG |
| 3/28/07 CORRIDOR REVISION FILED UNDER 'P' (LARGE |
| BIN) LM |
| 03/28/07 RE INSPECTION FEE $50 FG |
| 3/23/07 ELECTRIC REV UNDER "P", BIG PLAN |
| BIN./WRT. |
| 03/22 V/2007 BLDG SUBMITTAL NO FEE MMILLER |
| 03/20/2007 ZONING REVSION FEES $70.00 MMILLER |
| 3/20/07 BEN P/U PLUMB REV DATED 2/8/07 SPALMER |
| 3/20/07 BEN P/U MECH REV DATED 3/13/07 SPALMER |
| 3.19.07 MECH REV CALLED FOR P/U SM BIN UNDER 'P' |
| RJR |
| 03/13/07 ELECTRICAL REV $90 FEE-ADDITIONAL POWER |
| FOR EMS PANELS FG |
| 03/13/07 MECHANICAL REV $60 FEE- CHANGING CODE |
| FROM 2004 TO 2001 FG |
| 3-12-7 CALLED FOR P/U PLMG REV "P-LARGE" KSTEVENS |
| 3-7-07 BEN DYER PICKUP STAIR HAND RAIL & WINDOW |
| PROD APPROV SUBMITTALS & MECH REV DATED FEB 28 |
| 2007 WL |
| 3.6.07 MECH REV CALLED FOR P/U LG BIN UNDER 'P' |
| RJR |
| 3/6/07 BEN P/U REV DATED 1/17/07 SPALMER |
| 3/6/07 BEN P/U REV DATED 12/20/06 SPALMER |
| 3/5/07 BLDG/ELEC/PLBG/MECH & FIRE REVISION, FOR |
| REMOVING CORRIDORS $680 SLS |
| 3-5-7 CALLED FOR P/U "P-LARGE" KSTEVENS |
| 3/01/07 CALLED FILED UNDER "P" JW |
| 3/1/07 2ND TCO ISSUED SAME CONDITIONS HHP |
| 2/28/07 MECH REV M21A/M22/M23/M24/M25 SEW |
| 02/27/07 RECV'D LETTER REQUESTING TCO - $500 FEE |
| ROUTED ALL INFO TO H PISKURA DESK/INBOX FG 2/21/07 |
| BEN P/U REV DATED 2/9/07 SPALMER |
| 2.13.07 MECH REV CALLED FOR P/U LG BIN UNDER B |
| RJR |
| 02/09/07 BLDG-MECH- REV $60 FEE- 2 HOUR RATED |
| ASSEMBLY WITH FIRE DAMPER INSTALLATION IN SHAFT |
| WALL FG |
| 2/8/07 PLUMBING REV ERROR CORRECTIONS SEW |
| 2/8/07 MECH REV ERROR CORRECTIONS SEW |
| 2/1/07 BEN P/U MECH REV SPALMER |
| 2/1/07 MECH REV CALLED FOR P/U LARGE BIN UNDER 'P' |
| RJR |
| 1/31/07 TCO ISSUED SEE NOTES HHP |
| 01/30/07 TCO REQUESTED $500 FEE ROUTED TO H |
| PISKURA DESK FG |
| 1/24/07 PU BY MARK SEW |
| 1/23/07 MIKI P/U ENG SUBMITTALS SPALMER |
| 1/23/07 ENGINEERING SUBMITTALS UNDER "M"./WRT. |
| 1/23/07 ELEC REVISION UNDER "P", LARGE PLAN |
| BIN./WRT. |
| 01/19/07 SUBMITTAL NO FEE- ROUTED TO B TROBAUGH |
| DESK FG |
| 1/18/07 ELEC REVISION $170 SLS |
| 1/18/07 CALLED FOR P/U, BIN"P", RVC |
| 1/17/07 MECH REV $70 SEW |
| 1/17/07 PLUMBING REV $90 SEW |
| 1/17/07 PU BY BEN SEW |
| 1-17-07 CALLED FOR P/U "P LARGE" KSTEVENS |
| 01/12/2007 PLANS P/U BY MIKY MMILLER |
| 1/10/06 MECH REV TAKEN FROM REVIEW PER BEN |
| DYER(P)LARGE BINS ADARROUGH 1/4/07 MECH REVISION |
| $90 SLS |
| 1/3/07 MECH REVISION P/U BY BEN SLS |
| 1-3-07 CALLED FOR P/U UNDER P PHK 12/20/06 BLDG |
| REV $60 REVISED CURB & SIDEWALK GRADE SEW |
| 12/15/06 STAIR HAND RAIL SUBMITTAL NO FEE SLS |
| 12/11/06 BLDG SUBMITTAL NO FEE PER JIM SLS |
| 12/07/06 BEN P/U INCORRECT PLANS NO REVIEW WAS |
| DONE SPALMER |
| 12/07/06 ELECTRICAL REVISION NO FEES PER LUIS |
| MARTINEZ BECAUSE CUSTOMER PAID FOR IT ON 12/06/06 |
| AND NOW IT IS BEING SUBMITTED AS TO DIFF REVISION |
| MMILER |
| 12/07/06 MECHANICAL REVISON NO FEES PER LUIS |
| MARTINEZ BECAUSE CUSTOMER PAID FOR IT ON 12/06/06 |
| AND NOW IT IS BEING SUBMITTED AS TO DIFF REVISION |
| MMILER |
| 12/6/06 ELEC/MECH REVISION $120 SLS |
| 12/4/06 MECH REV P/U BY BEN SLS |
| 12/04/06 CALLED FOR P/U PLANS IN BOX P HM. |
| 11/30/06 REV $640 FEE- SET OF ARCH MECH-ELEC- |
| PLUMB REVISIONS TO ORIGINAL SET OF PERMIT DRAWINGS |
| "CORRIDOR" FG |
| 11/30/06REV $90 FEE MECH SCRIBNER ERRORS- THAT |
| HAVE BEEN CORRECTED SO FIELD INSPECTION WILLL |
| RESUME- INSPECTOR REFUSED TO CONTINUE INSPECTIONS |
| UNTIL ATTACHED HAVE BEEN REVIED FG |
| 11/28/06 AMANDA P/U DENIED PLANS SPALMER |
| 11/22/06 ELECTRICAL REVISION UNDER "M"./WRT. |
| 11/22/06 REV PU BY BEN SEW |
| 11-07-06 CALLED FILED **LARGE BINS** "P" JW |
| 10/20/06 BLDG/ELEC/MECH REVISION $160 SLS |
| 10/5/06 BEN P/U REV DATED 7/10/06 SPALMER |
| 9-6-06 CALLED FOR P/U UNDER "P" LARGE BIN "PHK" |
| 7/10/06 BLVD/MECH/ELEC REV $160 BLUE CARD RECD SLS |
| 6/26/06 BEN P/U REV SPALMER |
| 6/14/06 CALLED FOR P/U **LARGE BINS** "P" MRW |
| 6/7/06 CHRIS P/U SUBMITTAL & CIVIL DRAWINGS |
| SPALMER |
| 6/6/06 LEFT MESSAGE FOR PATTI LUDLOW TO P/U HER |
| FILE COPY OF ZONING APPROVED LANDSCAPE PLAN, FIRST |
| FLOOR PLAN AND WEST ELEVATION STAMPED ON 12/12/05 |
| *LARGE BINS*.'P'.RB |
| 6/6/06 READY FOR P/U **LARGE BINS** "P" SPALMER |
| 5/8/06 ELEC REV $190 SPALMER |
| 4/20/06 BLDG REV SEW |
| 4/13/06 TWO SUBMITTALS, CONSISTING OF 2 PACKAGES |
| OF APPS/PLANS AND TWO LARGE ROLLS OF PLANS P/U BY |
| JESSICA AJP |
| 4-05-06 CALLED FILED UNDER "P" LARGE PLANS |
| 4/4/06 SHORING DRAWINGS NO FEE FG |
| 4/4/06 PRECAST JOIST AND BEAM SHOP DRAWING NO FEE |
| FG |
| ****************************** |
| ****************************** |
| 5/13/04 GIVEN TO ANTHEA OR ANA MARIE TO REVIEW MM |
| 5/25/04 FAILED SEE NOTES MM |
| 6-7-04 CALLED FOR P/U UNDER W PHK 6-16-4 PLANS |
| PU/NOEL - KAM |
| 8/3/04 2ND PLAN REVIEW BZ244669 PSMITH |
| 8/31/04 SPRINKLER DRAWINGS ADDED OK PER L MARTINEZ |
| 10-7-04 2ND PLN CHK DENIED CALLED FOR P/U BOTTOM |
| SHELFS |
| 10-25-04 NOEL KUCICH PICKUP PLANS WL |
| |
| 2-18-5 CHANGED FROM PROJECT TO PERMIT - KAM |
| 2-18-5 WILL BRING PROOF OF OWNERHSIP PAPERS BEFORE |
| PICKING UP PERMIT - KAM |
| 2-24-05 SUBMITTALS N/C PR CUSTOMER NFL |
| 3/31/05 CALLED CONTRACTOR FOR P/U FILE P |
| 4/1/05 PLANS P/U NOEL R |
| 4/27/05 SPECS SEPERATED FROM PLANS UNDER "P" DR |
| 5/3/5 1ST RESUB NO FEE FG |
| 5/11/05 ONLY 3 ROLLS OF PLANS (ARTITECT) P/U BY |
| NOEL KUCICH TO PAY IMPACT FEES PT |
| 5/11/05 SUB/PRODUCT APPROVALS PT |
| 5-16-05 SUBMITTALS NFL |
| 6/7/05 CORR, CALLED CONTR, BIN 'PBM' SMH |
| 6-7-05 NOEL P/U PLANS NFL |
| 6-23-05 2ND RESUB $18050 (CONTR DID NOT HAVE CHECK |
| WILL RETURN TOMORROW WITH CHECK CONTR HAS RECEIPT |
| FOR $18050 ALREADY SIGNED BY L MARTINEZ & ENGINEER |
| LTR NO FEE PER J WITMER/L MARTINEZ) WL |
| |
| 7/7/05 CALL FOR P/U (P)/ROLLED PLANS AND BINDERS |
| ADARROUGH |
| 7/7/05 SUBMITTAL (3RD SET OF FA/FS), PUT W/PLANS |
| IN BIN "COURTHOUSE COMMONS" SMH |
| 7/7/05 ***NO RESUBMITTAL FEE PER LM*** |
| 8-23-05 PLANS IN THE OFFICE OF THE LICENSE/PERMIT |
| SERVICES MANAGER PHK |
| 9/7/05 PERMIT VALUE ADJUSTED TO $16.900,000 DUE TO |
| CONTRACTOR SUBMITTING SEPERATE APP FOR FOUNDATION |
| ONLY WHICH HAD A DOLLAR VALUE OF $1,100,000 PERMIT |
| #05060136 WHICH WAS INCLUDED IN THE VALUE OF |
| PERMIT #04042022 ORIGINALLY (APPROVED BY LUIS |
| MARTINEZ & JIM WITMER) PT |
| 9/7/05 PLANS UNDER P BOTTOM SHELF/READY TO ISSUE |
| PT |
| 10/03/05 PERMIT P/U BY PATTI PT |
| 10/03/05 SUB/ZONING PT |
| 10/03/05 CUSTOMER INFORMED US CORRECT PCN # IS |
| 74434321060360060 (COPY GIVEN TO JOHN HIGGINS TO |
| RESEARCH) PT |
| 10/04/05 SP/W/JOHN HIGGINS PARCEL CONTROL # WAS |
| CHANGED TO THE ABOVE PT |
| 10/11/05 REV $500 FEE/REVISED 45 PAGES ADD 6TH |
| FLOOR TO PARKING STRUCTURE FG |
| 10/18/05 GIVEN TO ANA/AMY/MATTHEW 822-1435 |
| LANDSCAPE PLANS ONLY MM |
| 12/12/05 APPROVED & RETURNED BY MATTHEW |
| (LANDSCAPE) CALL FOR P/U FILE P MM |
| 01-12-06 CALLED FILED UNDER " P" JW |
| 1/18/06 LANDSCAPE PLANS P/U BY JESSICA AJP 1/18/06 |
| PLANS/COMMENTS FOR 6TH FLR PARKING DECK P/Y BY |
| JESSISCA(45 PAGES ON 3 ROLLS) AJP |
| 2-9-06 REVISION 50 PGS $550 NFL |
| 2-13-06 REV #3 BLDG $180 (PLANS ARE ROLLED) WL |
| 2-22-06 CALLED FILED UNDER "P" JW |
| 2/28/06 JESSICA P/U REV SPALMER |