| Miscellaneous Information / Notes |
| 149 RESIDENTIAL CONDOS 9 STORIES OVER 2 STORIES OF |
| PARKING +/- 240 SPACES - 'THE METROPOLITAN' |
| |
| |
| |
| |
| |
| 10/31/06 ROBIN P/U REV DATED 9/8/06 SPALMER |
| 10/31/06 ROBIN P/U SUBMITTAL DATED 10/19/06 |
| SPALMER |
| 10/31/06 ROBIN P/U SUBMITTAL DATED 10/13/06 |
| SPALMER |
| 10-31-6 CALLED FOR P/U PLMG REV "T" KSTEVENS |
| 10/28/06 CALLED STEVE TO P/U SUBMITTALS. 'T'. RB |
| 10/19/06 BLDG SUBMITTAL CALC SHEETS SIGNED & |
| SEALED SEW |
| 10/13/06 SUBMITTAL OF REV SUBMITTED IN JULY |
| -RAISED MECH PIPES ADDITIONAL 6' AT METAL RAMPS |
| ROUTED TO RB FG |
| 10/13/06 STEVE BINGER P/U DENIED PLANS FG |
| 10/11/06 CALLED STEVE FOR DENIED DRAWING SUBMITTAL |
| FOR ACCESSIBLE RAMP P/U. 'T'. RB |
| 10/05/06 PLANS PICKED UP BY ROBIN. DV PALMER. |
| 10/5/06 ELEC OK, UNDER "T" FOR PU. CALLED SPOKE |
| TO STEVE, TOLD TO BRING IN BLUE CARD. DV PALMER |
| 10/03/06 BLDG SUBMITTAL NO FEE- SHOP DRAWINGS FOR |
| THE HC ACCESSIBLE RAMPS INSTALLED AT THE ROOF |
| /PAVER TRANSITIONS FG |
| 9/28/06 3RD TCO ISSUED HHP |
| 9/28/06 SUBMITTAL REQ LTRS FOR RENEWAL OF TCO $500 |
| TA |
| 9/26/06 REV. P/U BY ROBIN AJP |
| 9/22/06 ROBIN P/U SUBMITTAL SPALMERZ |
| 9/22/06 ELEC REV $130 TA |
| 9/21/06 CALLED FOR P/U T/B REPORTS IN BOX T HM. |
| 9/8/06 PLBG REVISION $60 SLS |
| 9/8/06 SECOND TCO P/U BY ROBIN AJP |
| 9/1/06 MECH REV SEW |
| 8/28/06 2ND TCO ISSUED HHP |
| 8-28-06 REQUEST FOR EXTENSION OF TCO GIVEN TO |
| HAROLD PISKURA PHK |
| 8-25-06 MECH REV CALLED FOR P/U UNDER T PHK |
| 8/24/06 DENIED REV. P/U BY ROBIN AJP |
| 8/23/06 MOVED TO LARGE PLAN BIN "T" AJP |
| 8-23-06 CALLED TO PICK UP REV. "T" ALANGE |
| 8/20/06 CALLED STEVE BINGER TO P/U SUBMITTALS AND |
| REVISIONS. LARGE BINS.'T'. RB |
| 8/18/06 BLDG/MECH REV $70 SEW |
| 8/15/06 FOR D BOWMAN- SUBMITTAL NO FEE- 3 FINAL |
| RESULTS ON TEST AND BALANCE DATED 8/7/06 FOR THE |
| METROPLITAN FG |
| 8/14/06 SUBMITTAL ( FA DEVICE ) P/U BY ROBIN AJP |
| 8-11-06 MECH SUBMITTAL NO FEE "RESPONSE TO |
| CONCERNS BY MECH INSPECTOR (DICK BOWMAN)THAT SOME |
| DRYER EXHAUST LENGTHS EXCEED THE LENGTHS |
| RECOMMENDED BY THE MANUFACTURER OF THE DRYERS. |
| THE UNITS AFFECTED & THE EXHAUST LENGTHS ARE SHOWN |
| ON THE ATTACHED SPREADSHEET. REQUESTING APPROVAL |
| OF THE INSTALLATIONS" WL |
| 8/4/06 TCO P/U BY LARRY AJP |
| 8/3/06 BLDG SUBMITTAL (3) SIGNED LETTERS SEW |
| 7/31/06 BLDG SUBMITTAL P/U BY ROBIN SLS |
| 7/31/06 BLDG REVISION $80 SLS |
| 7/31/06 ORIGINAL S/S DRWGS THAT WERE ALREADY |
| SUBMITTED SLS |
| 7/31/06 SUBMITTAL OF FA DEVICE SLS |
| 7-28-06 CALLED P/U "T" PES LETTERS FRON ENG. |
| 7/28/06 TCO P/U BY LARRY AJP |
| 7/28/06 1ST TCO HHP |
| 7/27/06 S/S LETTER FROM ENG SUBMITTED GIVEN TO |
| PAUL SCHMITZ SLS |
| 7/26/06 PLUMBING REV. P/U BY LARRY AJP |
| 7-26-06 CALLED P/U LETTER FOR POOL "T" PES |
| 7/26/06 PLUMBING/MECH REV. P/U BY ROBIN |
| AJ |
| P |
| 7-26-06 CALLED FOR P/U PLMG/MECH REV "T" KSTEVENS |
| 7/21/06 REQ FOR TCO GIVEN TO KEN. TA |
| 7/21/06 MECH REVISION $60 SLS |
| 7/20/06 ZONING REV. (LANDSCAPING) P/U BY ROBIN |
| AJP |
| 7/19/06 APPROVED,CALL FOR P/U, PUT UP FRONT FOR |
| P/U (NO NUMBER WAS PROVIDED FOR CONTACT)FOR FILING |
| T MM |
| |
| 7/17/06 OVERTIME INSPECTION FEE $ 600 PER H MOSER |
| FG |
| 7/14/06 BLDG SUBMITTAL SEW |
| 7/14/06 CONTRACTOR SUBMITTED LETTER REQUESTING |
| WEEK-END INSPECTION X 2 INSPECTORS ROUTED TO |
| HAROLD MOSER SLS |
| 7/13/06 ROUTED TO DMP, MATTHEW, AMY, ANA FOR |
| REVIEW MM |
| 7/12/06 SUB/MECH PT |
| 7-10-06 ROBIN WENSYEL PICKUP MECH REV WL |
| 7-10-06 P MECH/REV. LEFT MSG. P/U "T" TG. |
| 7/6/06 MECH REV $70 FEE |
| 7/3/06 ZONING REV $ 100 FEE- FG |
| 6/30/06 REV PU BY TOM THAT ROBIN FORGOT SEW |
| 6/30/06 BLDG REV A.03 A.08 A.09 A.10 SEW |
| 6/30/06 PU BY ROBIN SEW |
| 6/29/06 PLANS FILED UNDER 'T' LM |
| 6/25/06 CALLED STEVE BINGER TO P/U SUBMITTALS AND |
| REVISIONS. LARGE BINS.'T'. RB |
| 6/23/06 ELEC/PLBG/MECH REV P/U BY ROBIN SLS |
| 6/23/06 SUB/TCO PLANS FOR HAROLD PISKURA SLS |
| 6/23/06 SUB/PLBG SIGNED & SEALED LETTERS SLS |
| 6/23/06 CALLED FOR P/U "T" MRW IN BIG BIN |
| 6/19/06 REV/BLD ELEC PLUMB MECH & FIRE P/U BY |
| ROBIN PT |
| 6/19/06 REV/ELEC PLUMB & MECH P/U BY ROBIN PT |
| 6/19/06 SUB/BLDG SIGNED & SEALED DRAWINGS & |
| CALCULATIONS FOR ALUMINUN TRELLIS PT |
| 6/19/06 CALLED FOR P/U.MECHANICAL ONLEY.BOX T UP |
| FRONT HM. |
| 6/19/06 CALLED FOR P/U.MECHANICAL ONLEY.BOX T UP |
| FRONT HM. |
| 6/16/06 TIM P/U MECH REV SPALMER |
| 6-16-06 P MECH/REV. CALLED KEITH P/U "T" TG. |
| 6/12/06 MECH REV $100 SEW |
| 5/22/06 GIVEN TO DMP 822-1435 MM |
| 5/12/06 FIRE REV $200. TA |
| 5/11/06 MECH SUBMITTAL SEW |
| 5/11/06 BLDG SUBMITTAL SEW |
| 5/9/06 DENIED BLDG. REV. PLANS/APP P/U BY KEITH |
| AJP |
| 5/9/06 DENIED, CALL FOR P/U FILE T MM |
| 5/8/06 BLDG REV FEE CHG $100. TA |
| ************************************************** |
| 5/4/06 GIVEN TO ANA, DMP, 822-1435(SUBMITTAL) MM |
| 5/1/06 ELEC/PLUMB/MECH REV FEE $150 TA |
| 4-27-06 BLDG SUBMITTAL NO FEE A/C CLOSET DOORS WL |
| 4/21/06 SUBMITTAL NO FEE/ PROPOSED SIDEWALK DETAIL |
| ALONG SAPODILLA FG |
| 4/21/06 SUMITTAL NO FEE/METAL BIFOLD DOORS TO |
| REPLACE EXISTING A/C CLOSET DOORS FG |
| 4/17/06 REV $90 FEE FG |
| 4/17/06 BLDG REV. P/U BY HANS SEFFER AJP |
| 4/13/06 CALLED HAN SEFFER FOR SUBMITTAL P/U.'T'.RB |
| 4/13/06 PLANS P/U BY ROBIN AJP |
| 4/12/06 CALLED FOR P/U PLANS IN BOX (T) HM |
| 4/11/06 BLDG/ELEC/PLUMB/MECH REV FEE $490 TA |
| ************************************************** |
| 4/6/06 ELEVATOR WARRANTY LETTER AS REQUESTED BY |
| BOB TILLEY. SENT TO BOB TILLEY. RB |
| 4/6/06 SUBMITTAL FIRE/MECH/BLDG. SENT TO FIRE. RB |
| 3/24/06 SUB/BLDG PT |
| 3/23/06 BLDG SUBMITTAL NO FEE FG |
| 3/23/06 PLUMBING AND MECH. REV.'S P/U FOR MASTER |
| PERMIT, ELEC REV. LFOR SUBPERMIT # 05070873 AND |
| PLUMBING REV FOR SUB # 05070878 P/U BY ROBIN AJP |
| 3/20/06 SUBMITTAL NO FEE ROUTED TO B TILLEY- FG |
| ************************************************ |
| ************************************************ |
| OWES BALANCE PAID $37000.00 AT TIME OF SUBMITTAL |
| PLUS APPROACH FEE WAS NOT POSTED 5-2-03WL |
| PER D RUNNELS ASSIGN ONE APPROACH FEE 5-2-03 WL |
| 6-20-03 DENIED CALLED RIF (KENCO?) FOR P/U.'R'. RB |
| 10/29/03 PLANS TAKEN UPSTAIRS TO 5TH FLR TO REVIEW |
| BY URBAN DESIGN(ANTHEA). DV PALMER |
| 10/29/03 RETURNED PLANS FROM URBAN DESIGN.(ANTHEA) |
| DV PALMER. |
| PLEASE RETURN TO DEAN RE SUBS NFL |
| 11-21-03 DENIED. CALLED PERMIT RUNR FOR P/U 'T'.RB |
| 12/01/03 PLANS + APP P/U B MICHELLE PT |
| 12/03/03 OLD PLANS P/U BY MICHELLE PT |
| 2-6-4 2ND RESUB-$22050. BZ#236958 - KAM |
| 10-16-03 CHANGE OF CONTRACTOR BZ 231899 $100 NFL |
| 2/11/04 PLANS + APP P/U BY MITCH BOCOOK PT |
| 2-11-04 ALL PLANS AND DOC'S PICKED UP BY MITCH |
| NEVER FINISHED REVIEW ALANGE |
| 2/11/04 PLANS TAKEN W/OUT PAYING FOR RESUB. OWED |
| $22,000 + FOR RESUB FEE. NOT PAID. OWES 4X FEE FOR |
| SAME COMMENTS PER FS 553.80(2)(B) PLUMB SEE BZ |
| FILE UNDER 'T' FOR THE WEITZ CO.BZ # 237242, |
| $133,200.00. PER KEN STEVENS. DV PALMER |
| 3/31/04 GIVEN TO ANTHEA/ANA MARIE TO REVIEW MM |
| 3/12/04 PLANS RESUBBED, 3RD RESUB NO FEE DUE TO |
| REVIEWS NOT BEING COMPLETED. OK PER NEIL MELICK. |
| PLANS TAKEN IN BY KAM. DV PALMER. |
| 4-19-04 DENIED. CALLED BOB STOUT FOR P/U. 'T'. RB |
| 4/20/04 DENIED APP/PLANS P/U LARRY PSMITH |
| 6/3/04 4TH RESUB BZ240202 $22,050.00 PLANS + APP |
| PT |
| 6/25/04 PLANS P/U BRUCE/BOB FOR IMPACT FEES PSMITH |
| 6/25/04 FEES PAID $105560.80 BZ243206 PSMITH |
| 6/25/04 IMPACT FEES PD SPALMER |
| 7-23-4 RADON FEES PD $2338.38 BZ#243456 - KAM |
| 8/26/04 SUBMITTAL SHOP DRAWINGS NO FEE SPALMER |
| 9-17-04 CALLED FOR 8-26-04 SUBMITTAL P/U.'T'.RB |
| 9/30/04 BLDG REV $350 BZ246612 SPALMER |
| 10/12/04 BLD REV P/U BY HANS S DR |
| 11/02/04 SUBMITTALS NO FEE SPALMER |
| 11-10-04 CALLED FOR SUBMITTAL P/U PER REVIEW |
| NOTES.'T'.RB |
| 11-16-4 3 BLDG SUBMITTALS TO HAROLD P - KAM |
| 11-14-4 6 BLDG SUBMITTALS PU/DAVID M - KAM |
| 11-17-04 CALLED DAVID MATTEI FOR SUBMITTAL P/U PER |
| REVIEW NOTES.'T'.RB |
| 11/19/04 REV/BLDG PLUMB $100 PT |
| 11/19/04 SUB/REPAIR GROUT P/U BY DAVID PT |
| 11/19/04 SUB/EPOXY P/U BY DAVID PT |
| 11/19/04 SUB/VIBROFLOTATION CERTIFICATION P/U BY |
| DAVID PT |
| 11/19/04 SUB/VIRBROFLOTATION SHOP DRAWINGS P/U BY |
| DAVID PT |
| 11/19/04 SUB/SHEET PILE SHOP DRAWINGS P/U BY DAVID |
| PT |
| 11/19/04 SUB/GROUND LEVEL CONCRETE FORM WORK SHOP |
| DRAWINGS P/U BY DAVID PT |
| 11/19/04 SUB/BLDG N/C PT |
| 11/24/04 REV PLUMB $80 SPALMER |
| 11-17-04 CALLED DAVID MATTEI FOR SUBMITTAL P/U PER |
| REVIEW NOTES.'T'.RB |
| 12-2-4 CALLED FOR P/U OF REV (11-19) "T" KSTEVENS |
| 12-11-04 PLUMBING REVISION 4 PAGES DR |
| 12-13-4 4 BLDG SUBMITTALS - NO FEE - KAM |
| 12-13-4 CALLED FOR P/U "T" KSTEVENS |
| 12-14-04 DAVID MATTEI PICKUP PLUMB REV WL |
| 12-15-4 CALLED FOR P/U "T" KSTEVENS (11-24-4 |
| REV.) |
| 12-17-04 CALLED DAVID MATTEI FOR SUBMITTAL P/U PER |
| REVIEW NOTES.'T'.RB |
| 12/20/04 PLUMB REV $90 PSMITH |
| 12/20/04 BLDG SUBITTAL PER CONTR NO FEE PSMITH |
| 12/20/04 (5)BLDG SUB 0006-0009 & FOUNDATION P/U |
| DAVID PSMITH |
| 12/20/04 PLUMB REV P/U SANITARY STORM WATER DAVID |
| PSMITH |
| 12-21-04 CALLED DAVID MATTEI FOR SUBMITTAL P/U PER |
| REVIEW NOTES.'T'.RB |
| 12-29-4 SUBMITTAL PU/DAVID M - KAM |
| 12-30-4 3 LTRS TO HAROLD P - KAM |
| 1-5-05 SUBMITTALS TO H PISKURA'S IN BOX NFL |
| 1-11-5 CALLED FOR P/U "T" KSTEVENS |
| 1-11-05 SUBMTTAL TO H PISKURA NFL |
| 1-11-05 SUBMITTAL NFL |
| 1-11-05 ROBIN P/U PLUMB REV NFL |
| 1-13-5 CALLED FOR P/U "T" KSTEVENS |
| 1/14/05 LETTER TO NEIL MELICK HAND DELIVERED TO |
| NEIL DR |
| 1/14/05 3 LETTERS TO HAROLD P DR |
| 1/14/05 LETTER ABOUT SANTARY "D" TRAPS TO PAUL S |
| DR |
| 1/14/05 SHOP DRAWINGS DR |
| 1-18-05 CALLED DAVID MATTEI FOR SUBMITTAL P/U PER |
| REVIEW NOTES.'T'.RB |
| |
| 1-18-05 SUBMITTAL NFL |
| 1-21-05 SUBMITTALS NFL |
| 1-21-05 SUBMITTAL OF LETTERS TO NEIL MELICK NFL |
| 1-24-05 SUBMITTAL NFL |
| 1-28-05 SUBMITTAL NFL |
| 2-3-5 4 BLDG/1 ELEC SUBMITTAL - NO FEE - KAM |
| 2-3-5 SUBMITTAL TO HAROLD P - KAM |
| 2-3-5 2 SUBMITTALS-LETTERS FROM HAROLD PU/ROBIN - |
| KAM |
| 2-5-05 CALLED P/U "T" PES |
| 2-5-5 1 SUBMITTAL PU/ROBIN - KAM |
| 2-8-05 CALLED DAVID MATTEI FOR SUBMITTAL P/U PER |
| REVIEW NOTES.'T'.RB |
| 2-9-5 2 SUBMITTAL-1 SUBMITTAL TO HAROLD P - KAM |
| 2-10-05 CALLED DAVID MATTEI FOR SUBMITTAL P/U PER |
| REVIEW NOTES.'T'.RB |
| 02-14-05 CALLED FOR P/U UNDER "T" N MCCRAY |
| 2-14-05 SUBMITTAL NO FEE WL |
| 2-14-05 ROBIN WENSYEL PICKUP SUBMITTALS DATED |
| 2-9-05,2-3-05,1-28-05,1-22-05,1-21-05,1-21-05, & |
| 1-14-05 WL |
| 2/17/05 SUBMITTAL FOR HAROLD PISKURA LTRS 2ND LEVL |
| POUR 1 SHORING AND RESHORING COMPLIANCE CERT 3 |
| SKETCHES OF LOCATION OF POUR SPALMER |
| 2/17/05 ROBIN P/U 3 SETS OF FIRE ALARM SUBMITTALS |
| SPALMER |
| 2-18-05 CALLED ROBIN FOR SUBMITTAL P/U PER REVIEW |
| NOTES.'T'.RB |
| 2-23-05 ROBIN W PICKUP SUBMITTAL DATED 2-17-05 WL |
| 2-24-05 4 SUBMITTALS NFL |
| 3/4/5 ENG LETTER 2ND LEVEL POUR TO FILE DR |
| 3/4/5 ENG LETTER 3RD LEVEL POUR TO FILE DR |
| 3/10/05 SUBMITTAL DISP CURING COMP CONCRETE/LTR |
| 3RD LVL POUR 2 SHORING RESHORING COMPL CERT LOC OF |
| POUR/SHOP DRAW FL 2 THRU 7/STEEL STAIR 1 & 3 SHOP |
| DRAWINGS |
| 3/16/05 3RD LEVEL POUR 2 P/U BY ROBIN DR |
| 3/16/05 SHORING LETTERS FOR HAROLD P DR |
| 3-21-05 3 LTRS 4TH LEVEL POUR 1 SHORING & |
| RE-SHORING COMPLIANCE CERTIFICATE & 3 SKETCHES OF |
| LOCATION OF POUR WL WL |
| 2-18-05 CALLED DAVID FOR SUBMITTAL P/U PER REVIEW |
| NOTES.'T'.RB |
| 3/24/05 SUBMITTAL STEEL DECKING SHOP DRAWINGS NO |
| FEE SPALMER |
| 3/24/05 LTR TO HAROLD PISKURA 4TH LEVEL POUR NO |
| FEE SPALMER |
| 3/24/05 SUBMITTAL FLAME BAR SHOP DRAWINGS NO FEE |
| SPALMER |
| 3/28/05 ROBIN P/U SUBMITTALS SPALMER |
| 2-30-05 CALLED DAVID FOR SUBMITTAL P/U PER REVIEW |
| NOTES.'T'.RB |
| 3-31-05 DAVID P/U PLANS NFL |
| 4/5/05 SUBMITTAL TO HAROLD PISKURA LTR REGARDING |
| 5TH LEVEL POUR 2 SHORING AND RESHORING COMPLIANCE |
| CERTIFICATE AND 3 SKETCHES OF THE POUR NO FEE |
| SPALMER |
| 4/7/5 REVISION 145 PAGES DR |
| 4-8-05 CALLED ROBIN FOR SUBMITTAL P/U PER REVIEW |
| NOTES.'T'.RB |
| 4-8-5 SUBMITTAL TO HAROLD P - KAM |
| 4-8-5 2 SUBMITTAL PU/ROBIN - KAM |
| 4-12-05 SUBMITTAL FOR BLDG. D.A. D.R. |
| 4-12-05 SUBMITTAL TO HAROLD P. D.A. D.R. |
| 4-15-05 SUBMITTALS NFL |
| 4/15/05 SUBMITTALS TO HAROLD LETTERS FOR POURS |
| SPALMER |
| 4/15/05 ROBIN P/U SUBMITTALS SPALMER |
| 4-20-05 SUBMITTAL NO FEE - KAM |
| 4-20-5 SUBMITTAL PU/ROBIN - KAM |
| 4/22/05 REV PLUMB $190 SPALMER |
| 4-22-5 BLDG REV $90 - KAM |
| 4-22-5 SUBMITTAL TO HAROLD P - KAM |
| 4-24-05 CALLED FOR PU, UNDER "T" REVISION MRA |
| 4-26-05 DAVID P/U REV NFL |
| 4-26-05 SUBMITTALS NFL |
| 4-27-5 2 LTR TO HAROLD P - KAM |
| 4-27-5 2 BLDG SUBMITTALS - NO FEE - KAM |
| 4-27-05 CALLED DAVID FOR SUBMITTAL P/U PER REVIEW |
| NOTES.'T'.RB |
| 5/2/05 SUB/BLDG SHORING & RESHORING PT |
| 5/2/05 FOLLOWING SUBMITTALS WERE P/U BY |
| ROBIN/SHORING & RESHORING FOR 6TH LEVEL/SHORING & |
| RESHORING 7TH LEVEL/REVISINED PT CABLE SHOP |
| DRAWINGS FLOORS 2 THRU 7/SHORING & RESHORING 5TH |
| LEVEL PT |
| 5-05-05 SUB BLDG LTRS (4 DIFFERENT SETS) DA |
| 5-6-05 CALLED DAVID FOR SUBMITTAL P/U PER REVIEW |
| NOTES.'T'.RB |
| 5-11-05 SUB FIRE DA |
| 5-11-05 SUB BLDG DA |
| 5-11-05 ROBIN P/U SUB (BLDG LTRS) (7) DA |
| 5-17-05 ROBIN SUBMIT 3 LTRS REGARDING SHORING & |
| RESHORING OF 8TH LEVEL POUR 3, SUBMITTAL FOR 8TH |
| FLOOR CONCRETE FORMWORK SHOP DRAWINGS |
| 0013-03100-0, 3 SETS OF ROOF REINFORCING SHOP DWGS |
| 002J-03200-0 WL |
| 5/20/05 SUB/BLDG (ROOF POUR 1 OH SHORING & |
| RESHORING) PT |
| 5-27-05 SUBMITTAL BLDG DA |
| 6-03-05 FIRE PUMP SUBMITTAL UNDER "T" NMCCRAY |
| 6/7/5 BLDG SUBMITTAL NO FEE FG/2ND BLDG SUB |
| DIFFENERNT PHASE/COMPLIANCE ON ROOF |
| 6/7/5 SUBMITTAL P/U BY ROBIN FG |
| 6-15-05 CALLED ROBIN FOR SUBMITTAL P/U PER REVIEW |
| NOTES.'T'.RB |
| 6-16-05 CALLED ROBIN FOR REVISION P/U'T'(LARGE).RB |
| 6/17/05 REV/BLDG ELEC PLUMB MECH FIRE P/U BY DAVID |
| PT |
| 6/17/05 SUB/BLDG PT |
| 6/17/05 SUB/PLUMB PT |
| 6/17/05 SUB/ELEC PT |
| 6/17/05 REV/ELEC PLUMB MECH $280 PT |
| 6/17/05 SUB/BLDG P/U BY DAVID PT |
| 6/17/05 SUB/BLDG (0014031000) P/U BY DAVID PT |
| 6/17/05 FOLLOWING SUBMITTALS P/U BY DAVID LETTERS |
| ON SHORING & RESHORING/ROOF POUR 2/ROOF POUR |
| 1/ROOF REINFORCING SHOPS DWGS/SHORING & RESHORING |
| OF 8TH LEVEL POUR 3/0013031000/8TH LEVEL POUR 2 |
| SHORING & RESHORING LETTERS/8TH LEVEL POUR 1 |
| SHORING & RESHORING COMPLIANCE CERTIFICATION & 3 |
| SKETCHES OF THE POUR/FLOOR TILE COLUMN & MASONRY |
| STEEL REINFORCING SHOPS |
| 002403200/0012031000/0023032000 PT |
| 6-28-05 3 BLDG SUBMITTALS DATED 6-28-05 SOUTHEAST |
| BUCKHOIST RESHORING 0018-03100-0/UPPER ROOF |
| FORMWORK 0017-03100-0/FRAMING DRYWALL CAULKING |
| BACKING/FIRE TREATED WOOD WL |
| 6-29-05 SUBMITTAL CALCS DA |
| 7/7/05 SUB/PLUMB PT - SENT TO HP 8-3-5 KSTEVENS |
| 7/7/05 FOLLOWING SUBMITTALS RECEIVED/ROOF PLANTER |
| WALLS SHOP DRAWINGS 0031032000/PARTIAL STAIR & |
| WALL REINFORCING 0030032000/UPPER ROOF SHORING |
| PLAN 0019031000/EVALUATION OF THE SIM SPACE AT |
| SINGLE HUNG WINDOWS ON THE METROPOLITAN/PT |
| 7/12/05 PLUMBING PRODUCT APROVAL READY UNDER T JHL |
| 7-18-05 REV ELEC, BLDG, PLBG DA |
| 7-18-05 SUBMITTAL BLDG DA |
| 7-18-05 SUBMITTAL (SPECS) BLDG DA |
| 7-18-05 NICK P/U SUBMITTAL DA |
| 7/20/05 CALLED FOR P/U "T" MWENNERGREN |
| 7-26-05 REV DA |
| 7-26-05 NICK P/U REV FIRE ALARM SHOP DWGS & |
| PRODUCT DATA DA |
| 7-27-05 CALLED ROBIN FOR SUBMITTAL P/U PER REVIEW |
| NOTES.'T'.RB |
| 8/2/05 CALLED FOR P/U.PLANS IN BOX T HM. |
| 8-3-5 SUBMITTAL - NO FEE - KAM |
| 8-3-5 1 BLDG SUBMITTAL PU/ROBIN - KAM |
| 8-3-5 1 E,P,M,F REVISION PU/ROBIN - KAM |
| 8-9-05 CALLED DAVID FOR SUBMITTAL P/U PER REVIEW |
| NOTES.'T'.RB |
| 8/10/05 CALLED FOR P/U.MECHANICAL PLANS |
| ONLEY.PLANS IN BOX T HM. |
| 8/10/05 DAVID P/U MECH PLANS SPALMER |
| 8/10/05 DAVID P/U SUBMITTALS SPALMER |
| 8/16/05 SUBMITTALS FOR MECH NO FEE SPALMER |
| 8/17/5 BLDG SUBMITTAL FOR GRATING AT VEHICLE RAMP |
| NO FEE FG |
| 8-22-05 CALLED DAVID FOR REVISION P/U 'T' RB |
| 8-22-05 CALLED DAVID FOR GRATING SUBMTL P/U 'T' RB |
| 8-22-05 ROBIN P/U REV ALL PLANS DA |
| 8-25-05 REV NFL |
| 8/26/05 CALLED TO P/U PLANS.PLANS IN BOX T HM. |
| 8-29-05 CALLED DAVID FOR REVISION P/U 'T' RB |
| 8/30/05 DAVID P/U REV & SUBMITTALS SPALMER |
| 9-12-05 REV (ELEC, PLBG, MECH, BLDG) DA |
| 10-4-05 BLDG NO FEE SUBMITTAL "CLARIFICATION OF |
| DESIGN LOADS AT TIE COLUMNS WL |
| 10/7/5 BLDG SUBMITTAL NO FEE FG |
| 10/21/5 2ND REVISED PLANS THAT WERE MISS PLACED-NO |
| FEE -SENT TO R BROWN DESK FG |
| 11/09/05 BLDG SUBMITTAL NO FEE-POOL/SPA |
| REINFORCING STEEL SHOP DRAWINGS FG |
| 11/16/05 14TH REVISION SUBMITTED LTM |
| 12-2-05 REV #14 ELEC/PLUMB/MECH WL |
| 12-2-05 NO FEE PLUMBING SUBMITTAL WL |
| 12/09/05 MECH REV $150 SPALMER |
| 12/28/05 ELEC REV $110 SPALMER |
| 12/29/05 CALLED FOR P/U.PLANS IN BOX T HM. |
| 12/29/05 REV. P/U BY ROBIN AJP |
| 01/12/06 SUBMITTAL SHOP DRAWINGS FG |
| 1-17-06 REV #18 BLDG/MECH WL |
| 1/18/06 MECH REV $60 SPALMER |
| 2/1/06 SUB/PLUMB LETTERS FROM YKA CONSULTING DATED |
| 11/10/05 PT |
| 2/1/06 SUB/PLUMB LETTERS FROM YKA CONSULTING DATED |
| 1/6/06 PT |
| 02/01/06 BLDG SUBMITTAL NO FEE FG |
| 2/3/06 CALLED FOR P/U PLANS IN BOXT HM. |
| 2/9/06 GIVEN TO ANA APONTE, DMP 822-1435 MM |
| 2/14/06 FAILED, RETURNED TO INCOMING FOR FURTHER |
| PROCESSING MM |
| 2/17/06 ROOFTOP CHAIN LINK FENCE SUBMITTAL FAILED |
| BY ZONING. CALLED STEVE FOR P/U. 'T'. RB |
| 2-24-06 ROBIN P/U MECH DRAWINGS/BLD/ZONING NFL |
| 2-24-06 MECH/ELEC SUBMITTAL NO FEE NFL |
| 2/27/06 DENIED, BY DMP (AMY), RETURNED TO INCOMING |
| FOR FURTHER PROCESSING MM |
| 3-1-06 MECH REV CALLED FOR P/U UNDER T PHK |
| 3-8-6 CALLED FOR REV. P/U "T" KSTEVENS |
| 3-11-06 CALLED ROBIN FOR TWO REVISION P/U 'T'.RB |
| 3/13/06 TWO AREV.'S P/U BY ROBIN AJP |
| 3-14-06 B/F SUB,CALLED P/U "T" PES |
| 3-22-06 DENIED CALLED P/U LETTERS ENG."T" PES |