Code Enforcement Detail
Code Enforcement Detail
Case Number CE19060245 *zones*  
Case Date 2019-06-06 priority 9489009000276064377306
Type DISC Status L - L
Description DISCOVERED BY INSPECTOR Officer 8209
Operator mmanhong
Property On Case
Property ID 74434333050190120 Owner SUAREZ MELISSA M
Property Address 3715 MERRILL AVE Owner Address 13229 LA MIRADA CIR
City/State/Zip WEST PALM BEACH FL 33405 City/State/Zip WELLINGTON FL 33414
Phone  
Case Description
RE-CITED ON 01/29/2020 BY LUIS CRESPO
BUILDING WORK PERFORMED WITHOUT REQUIRED PERMIT(S)
AND INSPECTION(S): EXTERIOR ALTERATIONS (DRIVEWAY
REQUIRES A DUST FREE SURFACE ORD CHAPTER 94, ART
XV, SEC 94-482), WINDOWS, AND DOORS. MUST COMPLY
WITHIN 30 DAYS AND COMPLETE REQUIRED INSPECTIONS
WITHIN 180 DAYS. STOP WORK ORDER. 4XFEE. ALL
DOCUMENTS AND PHOTOS ATTACHED.
Violation Code(s)
1: 105.1 -- FAILURE TO SECURE BLDG PERMIT
2: 109.4 -- WORK COMMENCING BEFORE PERMIT
3: 94-482-A -- PARKING REQUIREMENTS < 3 RES.
4: FBC 107.1 -- PLANS REQUIRED
Inspections/Events Detail
DATETIMEINSPECTION / EVENT TYPEINSTRUCTIONS / COMMENTS
2021-02-0211:04:12COMMENTSLIEN RECORDED 01/13/21 FOR 0.00
BOOK 32094 PAGE 0767
2020-12-3013:11:20COMMENTSADDED FINE ON 105.1
START DATE: 11/16/20 FINE AMT: 100.00
2020-11-1617:09:50AFFIDAVIT OF NON-COMPLIANCEAONC AFFIDAVIT ATTACHED
2020-11-1612:30:20REINSPECTION FOR SM ORDER FEES 
2020-09-1616:40:01NOTICE OF HEARING09/16/2020 HEARING SCHEDULED KPERRE
2020-09-1612:29:55SPECIAL MASTER ORDER60/$100
2020-09-1116:40:01REINSPECTIONPRE-HEARING INSP SCHED KPERRE
2020-08-2510:41:24CERTIFIED MAIL SENT9489009000246064376439
2020-08-2510:10:14AFFIDAVIT OF POSTINGSIGNED 8/25
2020-08-2416:40:01NOTICE OF VIOLATIONNOVCSDFINE PRINTED BY KPERRE
2020-08-2416:34:23FORWARD TO SPECIAL MASTER 
2020-08-2410:19:43NOTICE OF VIOLATIONVOID
2020-08-2410:09:49NOTICE OF VIOLATIONPOSTED 8/25
2020-04-0110:14:09NOTICE OF HEARINGRESCHEDULE DUE TO COVID-19
2020-03-2710:14:09REINSPECTIONVOID
2020-03-2615:38:45CERTIFIED MAIL RETURNEDUNCLAIMED-UNABLE TO FORWARD
2020-03-1915:09:29CERTIFIED MAIL SENT9489009000276064377306
2020-03-1813:44:14AFFIDAVIT OF POSTING 
2020-03-1708:23:23CERTIFIED MAIL RETURNEDRETURNED-FORWARDING EXPIRED
2020-03-1315:20:54COMMENTSGAVE SIGNED NOTICE TO L CRESPO TO POST
2020-03-1215:24:18REINSPECTIONSEND TO SPECIAL MAG PER LUIS CRESPO
2020-03-1210:14:09NOTICE OF VIOLATIONVOID
2020-01-2915:24:18INITIAL INSPECTION 
2019-06-1115:24:18CREATE INITIAL CASE RECORDRE-CITED 01/29/20: NOTES ATTACHED
RE-CITED ON 01/29/2020 BY LUIS CRESPO
BUILDING WORK PERFORMED WITHOUT REQUIRED
PERMIT(S) AND INSPECTION(S): EXTERIOR
ALTERATIONS (DRIVEWAY REQUIRES A DUST
FREE SURFACE ORD CHAPTER 94, ART XV, SEC
94-482), WINDOWS, AND DOORS. MUST COMPLY
WITHIN 30 DAYS AND COMPLETE REQUIRED
INSPECTIONS WITHIN 180 DAYS. STOP WORK
ORDER. 4XFEE. ALL DOCUMENTS AND PHOTOS
ATTACHED.


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved