Code Enforcement Detail
Code Enforcement Detail
Case Number CE18080080 *zones* 06
Case Date 2018-08-07 priority 9171999991703857243292
Type SUPER Status X - X
Description SUPERVISOR Officer E1496
Operator jfrasca
Property On Case
Property ID 74434316010060090 Owner J & L TRUST
Property Address 1019 8TH ST Owner Address 1028 PRINCESS GATE BLVD
City/State/Zip WEST PALM BEACH FL 33401 City/State/Zip WINTER PARK FL 32792
Phone  
Case Description
**CHRONIC NUISANCE**REF: CE18020078
Violation Code(s)
1: 54-403-A -- DECLARATION - CHRONIC NUISANCE
Notes
2019-03-14 15:49:14MS. PITTMAN 352-988-9704 YOLANDARUBIN@YA
2020-03-11 11:22:39COPY OF EMAIL TO CONTRACTOR FROM NEIGHBO
 [email protected]
 DEAR MR. DANIEL:
 SEE ABOVE PICTURES
 PLEASE MAKE SURE THAT YOUR CREW REMOVE W
 ON THIS PROPERTY. ILLEGAL DUMPING IS PRO
 CITY OF WEST PALM BEACH.
 THE CITY OF WEST PALM BEACH WENT TO GREA
 DEMOLISH THE BUILDING ON 1019 8TH ST. TH
 CLEANED, GRADED AND SEEDED. THE CITY WOU
 IT IN GOOD CONDITION.
 PLEASE ADVISE
 
 JOHN FRASCA
 THE CITY OF WEST PALM BEACH
 CODE ENFORCEMENT OFFICER / CHRONIC NUISA
 DIRECT LINE 561-822-1475
 OFFICE 561-8221465
 FAX 561-822-1486
 
Inspections/Events Detail
DATETIMEINSPECTION / EVENT TYPEINSTRUCTIONS / COMMENTS
2023-07-1815:51:58SERVICE ORDER RE-INSPECTIONCHECK CONTRACT WORK
2023-07-1211:43:01WORK ORDER FAXED TO CONTRACTORWO EMAILED TO DOVES
2023-07-1115:50:42SERVICE ORDER RE-INSPECTIONLS 4,700; TURNED OVER WORK ORDER FOR
APPROVAL SIGNATURE. VMD THE GROUNDS
ARE SEVERELY OVERGROWN, I WILL SEND THE
CONTRACTOR TO CUT AND CLEAN THE LOT BUT
ONLY WHAT IS BEHIND THE FENCE
2023-05-1717:37:15SERVICE ORDER RE-INSPECTIONNOT ADDRESSING ISSUES AT THIS TIME. NEED
TO SEE WHERE PROJECT IS HEADING
2023-04-1417:20:30SERVICE ORDER RE-INSPECTIONGROUNDS OKAY. IN FRONT OF LOT AND ALONG
THE SIDEWALK IS ALL THE DEPOSITS FROM
STREET WORK, WHICH WAS BROUGHT TO THE
ATTENTION OF THE ENGINEERING DEPT.
2023-03-2410:58:55SERVICE ORDER RE-INSPECTION 
2023-02-2411:31:35SERVICE ORDER RE-INSPECTIONNO CONTRACTOR AT THIS TIME. SENDING THE
PHOTOS TO PROGECT MANAGER IN
ENGINEERING. TO SEE IN COMPANY ENGAGED
IN SEWER, STORMWATER, AND STREET REPARIS
CAN REMEDY THE DEBRIS MOVED IN FRONT OF
THIS PROPERTY?
2023-01-0411:14:26CONTRACTORS INVOICE APPROVEDINV. #2558, DOS 12-13-22, AMT. $278.86,
ORIGINAL TO VJM, COPY IN ATTACHMENTS
2022-12-1512:23:16SERVICE ORDER RE-INSPECTIONCHECK CONTRACT WORK / WAITING FOR
INVOICE
2022-12-0912:22:45SERVICE ORDER RE-INSPECTIONLS 4,700; TURNED OVER WORK ORDER FOR
APPROVAL SIGNATURE. VMD
2022-12-0907:49:58WORK ORDER FAXED TO CONTRACTOREMAILED WORK ORDER, COPY IN ATTACHMENTS
ORIGINAL TO VJM
2022-11-1518:35:46SERVICE ORDER RE-INSPECTION 
2022-11-0410:28:09SERVICE ORDER RE-INSPECTIONTHE GROUNDS ARE SEVERELY OVERGROWN /
MOST OF THE CONTRACT DEBRIS HAS BEEN
CLEANED UP
2022-09-1910:25:41SERVICE ORDER RE-INSPECTIONI AM WAITING TO SEE IF CONSTRUCTION
COMPANY(S) EITHER STREET PROJECT OR
HOUSE THAT WAS BUILT NEXT DOOR CLEAN UP
WHAT WAS DEPOSITED ON THIS PROPERTY.
2022-08-1509:00:59SERVICE ORDER RE-INSPECTIONTHERE HAS BEEN NO CHANGES IN CONDTION
2022-07-1108:57:43SERVICE ORDER RE-INSPECTIONI WILL NOT SEND THE CONTRACTOR AT THIS
TIME. THE CONTRACTOR BUILDING NEXT DOOR
HAS LEFT A MESS OF THE LOT. WE WILL SEE
IF HE CLEANS IT UP
2022-05-2612:04:49SERVICE ORDER RE-INSPECTIONWITH THE CONTRUCTION AND ROAD WORK /
UTILITY PROJECT THERE IS NOT MUCH WE CAN
DO AT TIME.
2022-04-2508:17:29SERVICE ORDER RE-INSPECTIONTHE CURRENT CONDITION OF LOT IS
LUDICROUS. IT APPEARS TO BE A
COMBINATION OF EFFORTS BY THE
ENGINEERING COMPANY DOING THE SEWER
PROJECT FOR THE CITY AND THE BUILDER
THAT IS ADJACENT TO THIS PROPERTY. THE
PHOTOS SHOW A TOTAL DISREGARD FOR THIS
LOT, EVENTHOUGH CODE ENFORCEMENT HAS
STEADILY MAINTAINED THIS PROPERTY.
2022-03-2412:18:09SERVICE ORDER RE-INSPECTIONTHE LOT IS OVERGROWN IN AREAS THERE IS
DEBRIS DEPOSITED ON LOT. CURRENTLY THERE
IS A LOT OF CONSTRUCTION IN AREA.
2022-03-1812:50:58CONTRACTORS INVOICE APPROVEDINV. #2346, DOS 2-22-22, AMT. $224.,
ORIGINAL TO VJM, COPY IN ATTACHMENTS
2022-02-1710:15:49WORK ORDER FAXED TO CONTRACTORVJM EMAILED WORK ORDER ON THIS DATE, I
COPIED WO'S INTO ATTACHMENTS
2022-02-1608:44:11SERVICE ORDER RE-INSPECTIONLS 4,700, TURNED OVER WORK ORDER FOR
APPROVAL AND SIGNATURE. VMD
2022-01-1111:02:22SERVICE ORDER RE-INSPECTIONNO CONTRACT SERVICES NEEDED AT THIS
TIME
2021-12-0712:27:37SERVICE ORDER RE-INSPECTIONGRASS IS OVER GRWON IN AREAS, REAR OR
NORTH SETBACK AREA IS OVER GROWN, OVER
ALL LOOKS OKAY, NO CONTRACT SERVICES AT
THIS TIME
2021-11-1809:29:49SERVICE ORDER RE-INSPECTIONGRASS NEEDS TO BE CUT
2021-10-2509:07:11CONTRACTORS INVOICE APPROVEDINV. #2262, DOS 10-18-21, AMT. $60. ;
TURNED OVER ORIGINAL TO VJM, COPY IN
ATTACHMENTS ALONG WITH PHOTOS
2021-10-2111:11:44SERVICE ORDER RE-INSPECTIONCHECK CONTRACT WORK / GOOD JOB / WAITING
FOR INVOICE
2021-10-1507:07:05WORK ORDER FAXED TO CONTRACTOREMAILED WORK ORDER TO VMD AND VJM, COPY
IN ATTACHMENTS, ORIGINALS TO VJM
2021-10-1309:36:47SERVICE ORDER RE-INSPECTIONLS 4,700, TURNED OVER WORK ORDER FOR
APPROVAL AND SIGNATURE. VMD
2021-09-1411:00:36CONTRACTORS INVOICE APPROVEDINV. #2190, DOS 8-28-21, AMT. $80.25,
COPY IN ATTACHMENT ALONG WITH PHOTOS,
TURNED OVER ORIGINAL TO VJM
2021-08-3108:38:38SERVICE ORDER RE-INSPECTIONCHECK CONTRACT WORK / CHANGED INSPECTION
DATE / CONTRACT LATE IN COMPLYING /
WAITING FOR INVOICE
2021-08-1908:46:58WORK ORDER FAXED TO CONTRACTOREMAILED WORK ORDER TO VMD AND VJM, COPY
IN ATTACHMENTS, ORIGINAL IN VJM BIN
2021-08-1708:38:10SERVICE ORDER RE-INSPECTIONLS 4,750; TURNED OVER WORK ORDER FOR
PROCESSING, VMD
2021-08-1307:10:25SERVICE ORDER RE-INSPECTIONCHECK WITH CONTRACTOR / I SPOKE WITH
CONTRACTOR VIA PHONE. HE MADE A SITE
VISIT. HE STATED, THAT IT WOULD BE
DIFFICULT BUT HE CAN CUT AND CLEAN.
2021-08-0913:20:28SERVICE ORDER RE-INSPECTIONI MET WITH CONTRACTOR / I REQUESTED THAT
HE MAKE A SITE VISIT. TO SEE IF HE CAN
BRING HIS EQUIPMENT TO LOCATION TO CUT
THE GRASS. THE LOT IS SEVERELY OVER
GROWN.
2021-07-0814:02:58SERVICE ORDER RE-INSPECTIONTHE LOT IS OUT OF COMPLIANCE BUT BECAUSE
OF THE CONSTRUCTION DEBRIS EMANATING
FROM SEWER/STREET PROJECT AND
CONSTRUCTION ON THE LOTS IN FRONT OF THE
LOT IT WOULD BE IMPOSSIBLE TO CUT AND
CLEAN
2021-05-1112:11:57SERVICE ORDER RE-INSPECTIONTHE LOT CAN NOT BE REACHED. THE 2 LOTS
TO THE WEST HAVE BEEN CLEARED AND
GRADED. THE SECTION OF 8TH ST IS BLOCKED
OFF WITH FILL & UTILITY PIPES. SEE
ATTACHMENTS
2021-04-1913:14:55SERVICE ORDER RE-INSPECTIONNO WAY TO REALLY TELL WHAT IS THE
CONDITION OF THE LOT. THE STREET IS
BLOCKED OFF WITH CONTRUCTION MATERIALS.
THE LOTS IN THE FRONT, AS YOU CAN SEE IN
THE PHOTOS WERE CLEARED AN PUT UP FOR
SALE
2021-03-1812:53:11SERVICE ORDER RE-INSPECTIONNOT SURE WHAT IS GOING ON? FIFTY PERCENT
OF THE LOT HAS BEEN CLEARED AND GRADED.
THERE IS STILL DEBRIS IN THE FRONT.
2021-03-0207:06:39SERVICE ORDER RE-INSPECTIONGRASS NEEDS TO BE CUT SOON. THERE IS
TRASH LITTER AND DEBRIS IN FRONT OF LOT
THAT NEEDS CLEAN UP
2021-02-1810:15:29WORK ORDER FAXED TO CONTRACTOR 
2021-02-1613:17:31SERVICE ORDER RE-INSPECTIONNO CONTRACT SERVICES NEEDED AT THIS
TIME, HOWEVER FRONT OF PROPERTY HAS
DEBRIS
2021-01-2514:11:01CONTRACTORS INVOICE APPROVEDINV. #1896, DOS 1-14-21, AMT. $60.,
TURNED OVER ORIGINAL TO VJM'S BIN, COPY
IN ATTACHMENTS WITH PHOTOS.
2021-01-1909:09:37SERVICE ORDER RE-INSPECTIONCHECK CONTRACT WORK THERE IS DEBRIS IN
THE FRONT PARKWAY AREA?
2021-01-1312:21:37WORK ORDER FAXED TO CONTRACTOREMAILED WORK ORDER TO DVM AND VJM,
ORIGINALS IN VJ'S BIN, COPY IN
ATTACHMENTS
2021-01-1212:32:50SERVICE ORDER RE-INSPECTIONLS 4,750; TURNED OVER WORK ORDER FOR
PROCESSING, VMD
2020-12-1708:11:21SERVICE ORDER RE-INSPECTIONGRASS OKAY, WILL NEED TO BE CUT SOON.
THERE IS SOME DEBRIS IN FRONT OF LOT.
2020-11-0608:15:52CONTRACTORS INVOICE APPROVEDINV. #1786. DOS 11-04-20, AMT. $60. ;
COPY OF INVOICE IN ATTACHMENTS TURNED
OVER ORIGINAL IN VJM?S BIN
2020-11-0508:37:03SERVICE ORDER RE-INSPECTIONCHECK CONTRACT WORK
2020-10-2907:22:15SERVICE ORDER RE-INSPECTIONLS 4,750; TURNED OVER WORK ORDER FOR
PROCESSING. VMDOVE
2020-10-2113:38:14SERVICE ORDER RE-INSPECTIONTHE GROUNDS NEED TO BE CUT / I WILL SEND
CONTRACTOR ON MONDAY IT NOT COMPLIED
2020-09-1708:46:01SERVICE ORDER RE-INSPECTIONNO CONTRACT SERVICES NEED.
2020-09-0313:38:41SERVICE ORDER RE-INSPECTIONNO CONTRACT SERVICE NEEDED AT THIS TIME,
HOWEVER GRASS IS OVER GROWN ALONG THE
EAST SIDE OF LOT AND THERE IS DEAD
VEGETATIVE DEBRIS
2020-08-1209:52:04CONTRACTORS INVOICE APPROVEDINV. #1637, DOS 8-09-20, AMT. $60./
SCANNED INTO ATTACHMENT, EMAILED THE
COPY TO VJM, GAVE ORIGINAL TO LB
2020-08-1108:25:53SERVICE ORDER RE-INSPECTIONCHECK CONTRACT WORK / WAITING FOR
INVOICE
2020-08-0707:56:41WORK ORDER FAXED TO CONTRACTOREMAILED WORK ORDER ON THIS DATE TO VMD
AND VJM, COPY IN ATTACHMENTS AND
ORIGINALS IN VJM'S BIN
2020-08-0707:01:31SERVICE ORDER RE-INSPECTIONLS 4,750; TURNED OVER WORK ORDER FOR
PROCESSING. VMDOVE
2020-07-1410:54:18CONTRACTORS INVOICE APPROVEDINV. #1471, DOS 6-24-20, AMT. $211.;
EMAILED VJ COPY, COPIED TO ATTACHMENTS
ALONG WITH PHOTOS, PLACED ORIGINAL IN
VJ'S BIN
2020-06-2407:12:04SERVICE ORDER RE-INSPECTIONCHECK CONTRACT WORK / WAITING FOR
INVOICE
2020-06-1708:05:31WORK ORDER FAXED TO CONTRACTOREMAILED WORK ORDER ON THIS DATE TO VMD
AND VJM, COPY IN ATTACHMENTS AND
ORIGINALS IN VJM'S BIN
2020-06-1511:46:46SERVICE ORDER RE-INSPECTIONLS 4,750, TURNED OVER WORK ORDER FOR
PROCESSING, VMDOVE TRIM TWO PALMS
2020-05-2108:59:23CONTRACTORS INVOICE APPROVEDINV. #1336, DOS 5-11-20, AMT $100.25 ;
SCANNED INVOICE INTO ATTACHMENTS, PLACE
ORIGINAL IN VJ'S BIN FOR FURTHER
PROCESSING , SENT COPY VIA EMAIL TO VJ
2020-05-1307:26:52SERVICE ORDER RE-INSPECTIONCHECK CONTRACT WORK / WAITING FOR
INVOICE
2020-05-0712:15:09WORK ORDER FAXED TO CONTRACTOREMAIL WORK ORDER TO VMDOVE, AND VJ
MORRIS, COPIED TO ATTACHMENTS AND PLACED
IN VJ'S BIN FOR FURTHER PROCESSING
2020-05-0708:49:32SERVICE ORDER RE-INSPECTIONLS 4,750, TURNED OVER WORK ORDER FOR
PROCESSING, VMDOVE
2020-03-3009:26:01COMMENTSDEBRIS WAS REMOVED
2020-03-1711:21:24SERVICE ORDER RE-INSPECTIONSOME ONE HAS ILLEGALLY DUMP DEBRIS ON
PROPERTY. I BELEIVE THE CONTRACTOR WITH
THE CHURCH PROJECT / BELIEF IS NOT PROOF
/ HOWEVER I BROUGHT IT UP TO THE
CONTRACTOR VIA EMAIL. NO RESPONSE TO
DATE
2020-03-1007:26:09SERVICE ORDER RE-INSPECTIONNO CONTRACT SERVICES NEED AT THIS TIME /
(EVENTHOUGH IT IS THE OWNERS
RESPONSIBILITY TO POLICE THEIR OWN
PROPERTY) HOWEVER IT APPEARS THAT THE
CONTRACTOR FOR THE CHURCH PUSHED THEIR
DEBRIS FOR THE JOB SITE ON THIS
PROPERTY. SENT AN EMAIL TO ALL CONCERNED
PARTIES, STARTING WITH THE CONTRACTOR
DOING THE JOB. 3-11-20 SEE NOTES
2020-02-0413:07:04SERVICE ORDER RE-INSPECTIONGROUND ARE IN OKAY CONDITION. NO WORK
ORDER AT THIS TIME
2020-01-0810:12:51SERVICE ORDER RE-INSPECTIONPASS DOVES #1171 DOS 1/2/20 $235.80
2019-12-3014:28:13WORK ORDER FAXED TO CONTRACTORWO EMAILED TO DOVES
2019-12-2415:38:12SERVICE ORDER RE-INSPECTIONWORK ORDER TO DOVES OVERGROWN, TRIM
BUSHES
2019-11-2114:44:31SERVICE ORDER RE-INSPECTIONBUILDING IS DOWN. SEED NEEDS TO TAKE. NO
WORKORDER AT THIS TIME
2019-11-0714:43:46SERVICE ORDER RE-INSPECTIONBUILDING IS DOWN AND REMOVED. SEEDING IS
STILL REQUIRED.
2019-03-2510:05:14EMAILRECEIVED AN EMAIL FROM OWNER REGARDING
PAPERWORK SENT IN OCTOBER OF 2018. SHE
REQUESTED THAT IT BE ATTACHED TO THE
CASE. I ATTACHED IT AT HER REQUEST.
2019-03-2009:41:22EMAILRECEIVED EMAIL FROM MS. PITTMAN.
CONTRACTOR REQUIRES 60-90 DAYS FOR
INITIAL PHASE AND UP TO 180 FOR
COMPLETION OF THE PROJECT. WILL CONFIRM
WITH R. BROWN IF THIS IS ACCEPTABLE.
2019-03-1415:41:14PHONE CALLSPOKE WITH MS. PITTMAN. FIRST CONTRACTOR
HAD STROK. HAS NEW CONTRACTOR. ROBERT
BROWN GIVING HER EXTENTION OF TIME, SHE
WILL BE SENDING A LETTER TO ME EXPLANING
DELAY.
2018-11-1613:31:47CERTIFIED MAIL RETURNED9171999991703857243292-RETURNED
2018-10-3113:33:27SERVICE ORDER RE-INSPECTIONWAIT FOR LAW
2018-10-3011:35:42COMMENTSCNSO RECORDED 10/30/18 OR BK 30215 PG
1467
2018-10-1607:53:23SERVICE ORDER RE-INSPECTIONGRASS DOES NOT NEED TO BE CUT. THERE IS
DEBRIS ON PROPERTY. THE STRUCTUE IS IN
BAD CONDTION. SEE ATTACHMENTS.
2018-10-0515:23:13COMMENTSRECIEVED PAPERWORK TO GIVE TO MR. FRASCA
AND HE INFORMED ME TO PUT INTO THE FILE
FOR INFORMATIVE INFORMATION FROM THE
CUSTOMER.SCANNED IN THE SYSTEM ON
10/05/2018 10/05/2018.
2018-10-0314:14:21SPECIAL MASTER ORDERCNSO
2018-10-0310:50:43NOTICE OF HEARING 
2018-10-0110:50:45CHRONIC NUISANCE RE-INSPECTIONPRE- HEARING INS / RECIEVED EMAIL FROM
OWNER 10/2-18 REVIEWED 10-3-18 / NO
WHICH CONTAIN AN ACTION PLAN. THE EMAIL
WAS AN ARGUEMENT DEBATING THE VALIDITY
OF THIS CASE.
2018-09-1109:45:58CERTIFIED MAIL SENT9171999991703857243292
2018-09-0613:11:51POST PROPERTYTURNED OVER FOR PROCESSING. SEE
ATTACHMENTS
2018-09-0411:51:59CHRONIC NUISANCE RE-INSPECTIONSEND TO HEARING / TURNED OVER FOR
PROCESSING NOH
2018-08-2711:47:45CHRONIC NUISANCE RE-INSPECTIONOWNER NON CO-OPERATIVE. RECEIVED MAIL
CHALLENGING NOTICES AND CONDITIONS OF
PROPERTY. SENDING TO HEARING, ATTACHMENT
OF WHAT WAS SENT AS A RESPONSE TO ACTION
PLAN NOTICE.
2018-08-1314:25:59CERTIFIED MAIL RECEIVED9171999991703857240840-SIGNED
2018-08-1008:01:09CERTIFIED MAIL SENT9171999991703857240840
2018-08-1007:52:46COMMENTSREQUEST TO RESEND NOTICE ORIGIANL HAD
WRONG CASE NUMBER. WILL REPOST WITH
CORRECT CASE NUMBER
2018-08-1007:35:07POST PROPERTYTURNED OVER AFFIDAVIT FOR FILING. SEE
ATTACHMENTS REPOSTED / CORRECTED CASE
NUMBER.
2018-08-0711:47:45CREATE INITIAL CASE RECORDVIOLATION RECORDED JFRASCA
2018-08-0711:47:45INITIAL INSPECTION**CHRONIC NUISANCE**REF: CE18020078


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved