| Code Enforcement Detail |
| Case Number |
CE12050218 |
*zones* |
06 |
| Case Date |
2012-05-15 |
priority |
|
| Type |
DISC |
Status |
C - C |
| Description |
DISCOVERED BY INSPECTOR |
Officer |
E1496 |
| Operator |
jfrasca |
| Property On Case |
| Property ID |
74434304050250040 |
Owner |
THELSUME MARCEL & |
| Property Address |
4705 BROADWAY |
Owner Address |
4705 BROADWAY |
| City/State/Zip |
WEST PALM BEACH FL 33407 |
City/State/Zip |
WEST PALM BEACH FL 33407-2903 |
|
|
Phone |
|
|
| Case Description |
| ELECTRICAL, PLUMBING, INTERIOR WALL, UNSANITARY, | | LDS. |
|
|
| Violation Code(s) |
| 1: 18-100 -- SAFE EGRESS | | 2: 18-105-E -- NONRESIDENTIAL DOORS & WINDOWS | | 3: 18-105-G -- NONRESIDENTIAL PLUMBING | | 4: 18-106-A -- CLEAN AND SANITARY | | 5: 18-95-A -- ELECTRICAL | | 6: 94-442-B-1 -- LANDSCAPE PLANS | | 7: 94-446-2 -- LANDSCAPE MAINTENANCE | | 8: 94-48-E -- MAINTENANCE AND REPAIR | | 9: 94-71-C -- OUTDOOR STORAGE - RESIDENTIAL |
|
|
| Inspections/Events Detail |
| DATE | TIME | INSPECTION / EVENT TYPE | INSTRUCTIONS / COMMENTS | | 2014-03-28 | 14:20:45 | CLOSE CASE | CASE CLOSED BY AMLOPEZ | | 2014-03-28 | 14:20:15 | COMMENTS | CLOSED
| | 2012-10-31 | 13:12:29 | REINSPECTION | STILL IN THE PLAN REVEIW FOR FIRE WALL. HOWEVER NO REPORT FROM ELECTRICAL?
| | 2012-09-21 | 08:58:28 | REINSPECTION | PLANS WERE FAILED REVISION FAILED.
| | 2012-08-20 | 14:11:14 | REINSPECTION | THERE IS AN APPLIED PERMIT FOR FIRE WALL BUT HAS FAILED. 8/13/2012
| | 2012-07-20 | 14:09:19 | REINSPECTION | SPOKE WITH CONTRACTOR VIA PHONE ON ELECTRICAL ISSUES IN CONJUNCTION WITH FIRE REGULATIONS. THEY DO HAVE AN ESTABLISHED PLAN REQUIRING A COMPLETE REVIEW AND INSPECTION OF ELECTRICAL BEFORE FIRE WALL CAN BE INSTALLED.
| | 2012-07-16 | 07:31:29 | REINSPECTION | | | 2012-05-24 | 12:39:04 | COMMENTS | SPOKE WITH MARCEL THELUSME (561-255-6528) HE DOESN'T UNDERSTAND WHY HE CAN'T HAVE AN EXPOSED WOOD CEILING. I TOLD HIM OFFICER FRASCA WILL CALL HIM WHEN HE RETURNS. I EXPLAINED THAT HE CANNOT USE PLEXIGLASS INSTEAD OF GLASS. HE ASKED FOR AN EXTRA MONTH TO FINISH WORK ON VIOLATIONS. SET UP RE-INSPECTION FOR 7/16.
| | 2012-05-15 | 07:31:29 | CREATE INITIAL CASE RECORD | VIOLATION RECORDED JFRASCA
| | 2012-05-15 | 07:31:29 | INITIAL INSPECTION | ELECTRICAL, PLUMBING, INTERIOR WALL, UNSANITARY, LDS.
|
|
|