Plan Review Details - Permit 22021258
Plan Review Stops For Permit 22021258
Review Stop AD ADDRESSING
Rev No 2 Status F Date 2023-06-14 Cont ID  
Sent By cpuell Date 2023-06-14 Time 09:45 Rev Time 0.00
Received By cpuell Date 2023-06-14 Time 09:45 Sent To  
Notes
2023-06-14 09:45:25AN @ ADDRESS NEEDS TO BE ASSIGNED TO THIS PROJECT.
 PLEASE EMAIL A SITE PLAN SHOWING THE EXACT LOCATION OF
 THE WHERE THE WORK IS TO BE DONE. IN THE FUTURE PLEASE
 MAKE SURE THAT YOU COORDINATE WITH
 [email protected] OR CALL 561-805-6659 BEFORE
 APPLYING FOR A PERMIT TO BE ISSUED AN @ ADDRESS.

Review Stop AD ADDRESSING
Rev No 1 Status F Date 2022-08-03 Cont ID  
Sent By cpuell Date 2022-08-03 Time 12:53 Rev Time 0.00
Received By cpuell Date 2022-08-03 Time 12:53 Sent To  
Notes
2022-08-03 12:53:41PLEASE CONTACT [email protected], TO BE ASSIGNED A
 GENERIC PROPERTY CONTROL NUMBER FOR MCI METRO, ALSO
 PLEASE EMAIL A SITE PLAN SHOWING THE EXACT LOCATION OF
 THE WHERE THE WORK IS TO BE DONE. IN THE FUTURE PLEASE
 MAKE SURE THAT YOU COORDINATE WITH
 [email protected] OR CALL 561-805-6659 BEFORE
 APPLYING FOR A PERMIT TO BE ISSUED AN @ ADDRESS.

Review Stop ENG ENGINEERING CSD
Rev No 2 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2022-08-15 Cont ID  
Sent By sberglun Date 2022-08-15 Time 11:59 Rev Time 0.00
Received By sberglun Date 2022-08-15 Time 11:58 Sent To  
Notes
2022-08-15 11:59:361) CITY UTILITIES ARE SHOWN INCORRECTLY ON PLANS.
 INCLUDE CITY UNDERGROUND UTILITIY PIPE SIZE, PIPE
 MATERIAL, AND DESCRIPTION ON THE SITE PLAN. CONTACT
 JANICE TARBILL, [email protected] FOR AS-BUILT
 INFORMATION. INCLUDE AS-BUILT INFORMATION IN YOUR
 RESUBMITTAL.
  
  
 SUZANNE BERGLUND
 [email protected]
 561-494-1075
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By amcgrego Date 2023-06-02 Time 09:55 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-08-16 Cont ID  
Sent By aoliver Date 2022-08-16 Time 08:52 Rev Time 0.00
Received By aoliver Date 2022-07-13 Time 16:15 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status N Date 2022-08-16 Cont ID  
Sent By aoliver Date 2022-08-16 Time 08:52 Rev Time 0.00
Received By aoliver Date 2022-08-16 Time 08:52 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2022-08-04 Cont ID  
Sent By eschneid Date 2022-08-04 Time 11:48 Rev Time 0.50
Received By eschneid Date 2022-08-04 Time 11:48 Sent To  
Notes
2022-08-04 11:50:19INSUFFICIENT
  
 1) PROVIDE A SURVEY, PREPARED BY A FLORIDA LICENSED
 SURVEYOR, THAT SHOWS THE RIGHT-OF-WAY LINE, THE
 SIDEWALK, AND ANY TREES WITHIN THE RIGHT-OF-WAY ALONG
 THE FIBER CONDUIT PATH SO THAT STAFF CAN VERIFY THAT
 THE BORE AND ANY REQUIRED BORE PITS AND HANDHOLES ARE
 WITHIN THE RIGHT-OF-WAY.
  
 2) THE FINK MARKERS ARE NOT PERMITTED. MARKERS MAY ONLY
 BE INSTALLED WITHIN THE HANDHOLES OR OTHERWISE BURIED.
  
 3) THE PLANS FAIL TO SHOW THE PALM TREE ADJACENT TO
 HANDHOLE 11+32. THE PLANS MUST SHOW THE PALM TREE AND
 THAT THE EXCAVATION FOR THE PALM TREE AND BORE ARE AT
 LEAST THREE FEET FROM THE TRUNK OF THE PALM TREE.
 ADDITIONALLY, TO PROTECT THE PALM TREE TRUNK FROM
 DAMAGE, THE BORE MUST COME FROM THE NORTH AND WEST. THE
 BORE MACHINE MAY NOT STAGE ADJACENT TO THE PALM TREE.
  
 CONTACT ERIC SCHNEIDER @ (561) 822-1446
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved