Miscellaneous Information / Notes |
180-EXTENSION-02 |
EXTENSION #01:TIME EXTENSION 180 DAYS 120-INSTALL |
1.25" HDPE BY D/B FROM ALLEY E/O N ROSEMARY N/O |
CLEMATIS ST TO ALLEY S/O EVERNA WEST SIDE. |
CONTRACTOR: SOUTHERN ENGIN4ERING & CONSTRUCTION |
CORP, DENNIS MARKRANCY, 954-741-6188 |
SUB: ATLANTIS BROADBAND, 954-213-3367 |
START DATE: 04/10/2023 |
DURATION: 180 DAYS |
END DATE: 10/07/2023 |
R/W & S/W RESTORATION PER CURRENT CITY STD. COPY |
OF BORE LOGS & AS-BUILTS REQUIRED. LIGHTED |
BARRICADES REQUIRED IF EQUIPMENT OR DUMPSTER (POD) |
IS LEFT IN ROADWAY OR PARKING STALL AFTER DARK OR |
OVER NIGHT. |
CONTACT: JANICE TARBILL 561-494-1079 OR |
[email protected] FOR ALL CITY LOCATES. ALL TYPE I |
BARRICADES TO HAVE BALLASTS OVER BOTTOM RAILS. NO |
WORK ALLOWED BETWEEN 7:00AM-9:00AM&4:00PM-6:00PM. |
ALL FOLLOWING INSPECTIONS MUST BE CALLED IN |
(LISTED ON THE BACK OF THE PERMIT): |
B800,801,802,803,804,805 PLEASE BE SURE TO FOLLOW |
THESE SPECIAL CONDITIONS (LISTED ON THE BACK OF |
THE PERMIT): |
A,B,C,D,E,F,G,H,I,J,K,L,M600,602,660,661 |
|
|