Miscellaneous Information / Notes |
180-REMOVE & REPLACE 1 WOOD WITH CONCRETE 2 WOOD |
WITH WOOD, 2 CONCRETE WITH SAME & 1 CONCREST WITH |
WOOD POLE, SPLICE BOX & H/H. WR#19100229 |
|
CONTRACTOR: FP&L, TIFFANY MORELAND, 561-640-2043 |
START DATE: 02-09-2020 |
DURATION: 180 DAYS |
END DATE: 08-07-2020 |
BAGGING OF PARKING METERS IS REQUIRED WHEN |
BLOCKING PARKING STALLS. R/W & S/W RESTORATION PER |
CURRENT CITY STD. COPY OF BORE LOGS & AS-BUILTS |
REQUIRED. LIGHTED BARRICADES REQUIRED IF EQUIPMENT |
OR DUMPSTER (POD) IS LEFT IN ROADWAY OR PARKING |
STALL AFTER DARK OR OVER NIGHT. CONTACT JANICE |
TARBILL 561-494-1079 FOR ALL CITY LOCATES. ALL |
TYPE I BARRICADES TO HAVE BALLASTS OVER BOTTOM |
RAILS. NO WORK ALLOWED BETWEEN |
7:00AM-9:00AM&4:00PM-6:00PM. ALL FOLLOWING |
INSPECTIONS MUST BE CALLED IN (LISTED ON THE BACK |
OF THE PERMIT): B800,801,802,803,804,805 |
PLEASE BE SURE TO FOLLOW THESE SPECIAL CONDITIONS |
(LISTED ON THE BACK OF THE PERMIT): |
A,B,C,D,E,F,G,H,I,J,K,L,M600,603 |