Miscellaneous Information / Notes |
180-PROPOSED 1086FT D/B ALOND PARKER AVE FROM |
CAMELLIA RD N TO SOUTHERN BLVD. THIS PERMIT DOES |
NOT COVER ANY WORK ON SOUTHERN BLVD. #7E843418N |
|
CONTRACTOR: AT&T, FAEHAN QAZI, 561-540-9275 |
SUB: IVY SMITH, CALVIN BRADDY, 305-360-0341 |
START DATE: 06-15-2019 |
DURATION: 180 DAYS |
END DATE: 12-12-2019 |
DO NOT PARK ON THE SIDEWALK. |
BAGGING OF PARKING METERS IS REQUIRED WHEN |
BLOCKING PARKING STALLS. R/W & S/W RESTORATION PER |
CURRENT CITY STD. COPY OF BORE LOGS & AS-BUILTS |
REQUIRED. LIGHTED BARRICADES REQUIRED IF EQUIPMENT |
OR DUMPSTER (POD) IS LEFT IN ROADWAY OR PARKING |
STALL AFTER DARK OR OVER NIGHT. CONTACT JANICE |
TARBILL 561-494-1079 FOR ALL CITY LOCATES. ALL |
TYPE I BARRICADES TO HAVE BALLASTS OVER BOTTOM |
RAILS. NO WORK ALLOWED BETWEEN |
7:00AM-9:00AM&4:00PM-6:00PM. ALL FOLLOWING |
INSPECTIONS MUST BE CALLED IN (LISTED ON THE BACK |
OF THE PERMIT): B800,801,802,803,804,805 |
PLEASE BE SURE TO FOLLOW THESE SPECIAL CONDITIONS |
(LISTED ON THE BACK OF THE PERMIT): |
A,B,C,D,E,F,G,H,I,J,K,L,M600,602,605,660 |