Miscellaneous Information / Notes |
ADDITION OF 2 PARKING LEVELS TO EXST JUDICIAL |
PARKING GARAGE INCL ELEC PLBG & FIRE SPRINKLERS |
UTILITY EASEMENT MUST BE RECORDED PRIOR TO CO. |
|
|
|
6/2/09 ELECTRICAL REVIEW COMPLETE, APPROVED, |
FORWARD PLANS TO FIRE FOR RE-STAMP. DBW |
************************************************** |
************************************************* |
5-28-09 ROUTED TO D WISE..IMPORTANT.. OK PER R |
BROWN TO BYPASS TCO HOLDS AT THIS TIME PLUS SEE |
NOTE BELOW, ADDTL TCO FEE NOT ADDED @ THIS TIME |
SEE AUDIT TRAIL FEE NOT ADDED..REV #8 $170 "ADD |
EXIT SIGNS AT GARAGE RAMPS PER ERIC CONERLY..ALAN |
GAST'S CONV. W/D WISE ROUTE THIS REV DIRECTLY TO D |
WISE WL |
************************************************** |
** |
************************************************** |
** |
2/4/09 AN ADDITIONAL TCO FEE IS REQUIRED, $500.00, |
THE TCO EXPIRED 1/30/09 JDS |
01/05/2009 GAVE CUSTOMER RCPT TO PAY FOR FEES ALSO |
ADDED ADDITIONAL TCO FEE IN THE AMOUNT OF $500.00 |
WHICH IS NOW A TOTAL OF $3500 MMILLER |
1/2/09 AN ADDITIONAL TCO FEE IS REQUIRED, BRINGING |
THE TOTAL TO $3500.00 JDS |
12/15/08 DO NOT ISSUE CO UNTIL ALL FEES ARE PAID |
FOR TCO EXTENSIONS. TOTAL $3000.00 JDS |
09/08/08 CALLED ALAN GAST WITH THE WEITZ CO. ABOUT |
CLOSING ALL THE PERMITS FOR THIS JOB, THE 3RD TCO |
HAS EXPIRED. LEFT MESSAGE ON HIS MACHINE TO CALL |
ME BACK. JDS |
5/29/08 3RD TCO ISSUED. SEE NOTES HHP |
5/28/08 REQUEST FOR EXENTION OF TCO $500 SPALMER |
5/12/08 BLDG/ELEC REVISONS P/U BY ALLEN SLS |
5/9/08 REVISIONS FILED UNDER 'T' LM |
4/30/08 REQUEST FOR EXTENSION OF TCO $500 SPALMER |
04/07/2008 BUILDING & ELECTRICAL REVISION #07 FEES |
$ 160.00 MMILLER |
4-7-08 ALLEN GAST PICKUP BLDG REV DATED 3-14-08 & |
2 ELEC REV EMERGENCY EXIT SIGN & FIRE ALARM |
REMOVAL REV DATED 3-14-08 WL |
04-03-08 CALLED FILED UNDER "T" SMALL PLAN JW |
3/31/08 ELEC REV'S FROM 3/14 AND 3/27 ARE UNDER |
"T" FOR PU, DENIED AND NEED CORRECTIONS. SPOKE TO |
MITCH POTTER AND TOLD HIM BOTH REVISIONS FROM EACH |
DATE WERE OUT FRONT FOR PU. ALSO REMINDED OF BLURE |
CARD. DV PALMER. |
3/31/08 TCO ISSUED.STEVE TO P/U.KC |
3/28/08 OVERTIME INSPECTION $300 SPALMER |
3/27/08 TCO LETTER RECEIVED $500 GAVE TO HAROLD |
SLS |
3/27/08 ELEC REVISION ADDING EMERGENCY EXIT SIGNT |
TO RAMPS $90 SLS |
4/13/08 2 BLDG SUMBITTALS PU BY ALAN SEW |
3/14/08 BLDG REV ADDITION OF LOUVERS AT ELEVATOR |
SHAFT $60 SEW |
3/14/08 ELEC REV REMOVAL OF FIRE ALARM FROM |
DRAWINGS SEW |
3-10-08 CALLED FILED UNDER "T" SMALL PLAN JW |
2/29/08 BLDG SUBMITTAL TO DENIED BLDG REVISION NO |
FEE PER JIM SLS |
2/28/08 LETTER SUBMITTED FOR RBROWN REGARDING |
DELETION OF PART OF ORIGINAL SCOPE OF WORK SEW |
2/28/08 ENGINEERING SUBMITTAL STAIR TOWER #6 & #3 |
AREA OF REFUGE SHORING DRAWINGS SEW |
2/28/08 (2)BLDG REV WINDOW WALL NOA PU BY KEITH |
SEW |
2/28/08 STAIR TOWER #6 CAST IN PLACE ROOF PU BY |
KEITH SEW |
2/28/08 STAIR TOWER #1 PU BY KEITH SEW |
01-23-08 CALLED CONTRACTOR PLANS FILED UNDER "T" |
SMALL PLAN JW |
01/18/2008 APPROVED BLDG SUBMITTAL THAT WAS |
SUBMITTED ON 12/07/2007 P/U BY KEITH MMILLER |
|
01/18/2008 BLDG REVISION # 03 FEES $80.00 MMILLER |
01/18/2008 ENGINEERING REVISION #02 FEES $60.00 |
MMILLER |
01/18/2008 ENGINEERING SUBMITTAL NO FEE (STAIR |
TOWER #01 STAIR SHORING INSPECTION REPORT 4-5 |
&5-6) MMILLER |
01/18/2008 ENGINEERING SUBMITTAL NO FEE ( TOWER 6 |
)MMILLER |
12/26/07 CALLED FILED UNDER "T" SMALL PLAN JW |
12/21/07 ENG SUBMITTAL TOWER #3 ROOF SLAB AREA OF |
REFUGE SHORING INSPECTION REPORT SEW |
12/21/07 ENG SUBMITTAL TOWER #1 LOBBY SLABS LEVELS |
5&6 SHORING INSPECTION REPORTS SEW |
12/21/07 PU BY KEITH SEW |
12/13/07 ELEC REV UNDER "T" FOR PU,CALLED AND LEFT |
MESSAGE ON KEITH'S VM, TOLD TO BRING IN BLUE CARD. |
DV PALMER |
12/7/07 BLDG SUBMITTAL TOWER #2 5TH & 6TH LEVELS |
STAIRS INSPECTION REPORT SEW |
12/7/07 BLDG SUBMITTAL TOWER #5 LEVEL 5-6 STAIRS |
SHORING INSPECTION REPORT SEW |
12/7/07 ELEC REV ADDED LIGHTING TO LEVEL 3 RAMP |
$70 SEW |
12/3/07 6 APPROVED BLDG SUBMITTALS PL/U BUY KEITH |
AJAP |
11-20-07 CALLED FILED (6) SUBMITTALS UNDER |
"T" SMALL PLAN JW |
11/15/07 (6) BLDG SUBMITTALS STAIR TOWER #4 |
SHORING 5-6 STAIR TOWER #6 SHORING 5-6 STAIR TOWER |
#2 SHORING 4-5 STAIR TOWER #5 SHORING 4-5 TOWER #2 |
ELEVATED SLAB @ 5TH & 6TH LEVEL SEW |
11/15/07 PU BY KEITH SEW |
11-13-07 CALLED FILED UNDER "T" SMALL PLAN JW |
11/01/07 KEITH P/U THE FOLLOWING |
SUBMITTALS:ENGINEERING TOWERS #3,4,5,6(THREE |
SUBMITTALS);STSIR #05, 4TH TO 5TH FLOOR SHORING |
INSPECTION LETTER;STAIR #3, TOWER #2 ROOF SLAB |
ENG. SUBMITTAL;STAIR #04 4TH TO 5TH FLOOR STAIR |
ENG. SUBM;AND ELEVATD CAST-IN PLACE SHORING DRWING |
EING SUBM. AJP |
11/01/2007 ENGINEERING SUBMITTAL NO FEE MMILLER |
10-30-07 CALLED CONTRACTOR FILED UNDER "W" SMALL |
PLANS JW |
10/25/2007 ENG SUBMITTAL NO FEE (STAIR #05 4TH TO |
5TH FLOOR SHORING INSPECTION LETTER)MMILLER |
10/25/2007 ENG SUBMITTAL NO FEE (STAIR TOWER# 06 |
4TH TO 5TH FLOOR STAIR SHORING INSPECTION REPORT) |
MMILLER |
10/25/2007 ENG SUBMITTAL NO FEE (STAIR #3A & TOWER |
# 02 ROOF SLAB SHOORING INSPECTION LETTERS) |
MMILLER |
10/25/2007 ENG SUBMITTAL NO FEE (STAIR #04 TO 5TH |
FLOOR STAIR SHORING INSPECTION LETTERS MMILLER |
10/25/2007 ENGINEERING SUBMITTAL NO FEE ()ELEVATED |
CAST-IN PLACE SHORING DRAWINGS MMILLER |
9-28-07 CALLED CONTRACTOR AND SPOKE WITH KEITH, |
SUBMITTALS FILED UNDER "T"SMALL PLAN JW |
9/25/07 ENGINEER SUBMITTAL TOWER #6 ROOF SCAB |
SHORING DRAWINGS SEW |
9/25/07 ENGINEER SUBMITTAL TOWER #5 ROOF SCABS |
SHORING INSPECTION REPORT SEW |
9/25/07 ENGINEER SUBMITTAL TOWERS #3 & #4 ROOF |
SCABS SHORING INSPECTIONS REPORTS SEW |
9/25/07 TWO SUBMITTALS: SHORING INSPECTION REPORTS |
FOR TOWERS #1 & #6, AND LLIGHT POLE CALCS. P/U BY |
KEITH AJP |
9-17-07 CALLED SUBMITTALS FILED UNDER "T" SMALL |
JW |
08/27/2007 BLDG SUBMITTAL NO FEE (SHORING |
INSPECTION REPORTS TOWERS 1 #& #6) MMILLER |
8-27-07 2 BLDG SUBMITTALS NO FEE CHARGED "ELEVATED |
SLAB SHORING SHOP DRAWINGS & LIGHT POLE WIND LOAD |
CALCS" WL |
8/6/07-------"ROLL PLAN"-----------LM |
8/3/07 ALLEN GAST PICKED UP STAMPED PERMIT PLANS |
AND DENIED STAIR TOWER SHORING SHOP DRAWINGS. RB |
8/3/07 FEES PAID, PERMIT P/U BY ALLEN , PLANS WILL |
BE P/U LATER AJP |
8/3/07 CALLED ALLEN GAST TO PAY $72,201.23 |
OUTSTANDING FEES AND P/U PERMIT. PLANS CURRENTLY |
BEING PROCESSED AND STAMPED BY LUIS MARTINEZ. RB |
7/20/07 BLDG SUBMITTAL STAIR TOWER SHORING |
DRAWINGS FOR DISTRIBUTION SEW |
7/20/07 2ND RESUB W/PLANS & APPL SEW |
7/16/07 KEITH P/U 5 LARGE ROLLS AND PACKAGE OF |
DOCS W/APP. AJP |
7/16/07 CALLED ALAN FOR P/U. LARGE ROLLS. 'T'. RB |
5/21/07 1ST RESUB W/PLANS & APPL NO FEE SEW 5/3/07 |
KEITH P/U DENIED PLANS SPALMER |
5/3/07 DENIED. CALLED KEITH FOR P/U. LARGE ROLL |
PLAN. 'T'. RB |
05/03/07 PLAN SET REVIEWED BY FIRE MARSHAL MIKE |
CARSILLO RETURNED TO CSD MAW/FIRE |
05/01/07 ONE SET OF PLANS TAKEN TO FIRE PREVENTION |
OFFICE FOR FURTHER REVIEW BY FIRE MARSHAL |
MAW/FIRE |
04/11/07 VALUE CHANGED FROM $4000000 TO $9242308 |
PER DISCUSSION WITH KEITH VANDRUFF FROM WEITZ CO |
SLS |