Miscellaneous Information / Notes |
HISTORIC RESTORATION OF ORIG 1916 BLDG INCL INT |
RESTORATION/IMPROVEMENTS. RENOV OF SITE/EXTG |
PLAZA |
|
|
|
12/27/07 PLANS LEFT OUTFRONT AFTER CO ISSUED WERE |
DISPOSED OF. CALLS WERE MADE FOR PLANS TO BE |
PICKED UP. DV PALMER. |
11/19/07 CALLED FOR P/U. SPOKE TO BILL MACQUEEN. |
ON FLOOR IN FRONT OF LG. BIN. RJR |
11/19/07 UNABLE TO PERFORM MECHANICAL REVIEW OF |
AS-BUILT PLANS. PERMIT IS CLOSED, C.O. IS PRINTED |
AND PERMIT PLANS HAVE BEEN SENT TO RECORDS |
RETENTION. RJR |
10/30/07 CALLED FOR P/U "C" MRW REVISION |
10/16/07 FINAL RECORD DRAWINGS $1360 SPALMER |
10/15/07 APPROVED PLBG. REV. P/U BY BILL AJP |
10-13-7 CALLED FOR PLMG. REV. P/U AND LEFT A |
MESSAGE WITH BILL M. AND INDICATED THAT THE |
REVISION WERE OK AND THAT HE NEEDED THE RECIEPT |
AND/OR THE BLUE CARD TO RETRIEVE THE REVISIONS. |
"H-LARGE" KSTEVENS |
10/01/07 SUBMITTAL (EXT. RAILINGS) AND BLDG REV |
#29 (MONUMENT WALL) P/U BY SANDY AJP |
9/30/07 CALLED BILL MACQUEEN TO P/U SUBMITTAL AND |
REVISION. 'H'. RB |
09/12/2007 BLDG REVISION # 29 FEES $ 70.00 |
MMILLER |
9 /12/07 APPROVED MECH.#25 REV. P/U BY BILL AJP |
9/11/07 MECH REV M2.03 CALLED FOR P/U SPOKE TO |
BILL. SM BIN UNDER "H" RJR |
9/10/07 REV#24 AND TWO SUBMITTALS (90 MIN DOORS |
AND FLAG POLE)) P/U BY BILL AJP |
9/10/07 CALLED BILL FOR P/U PLANS, BIN "H", RVC |
9/9/07 CALLED BILL MACQUEEN TO P/U SUBMITTALS. |
'H'. RB |
9/7/07 APPROVED LANDSCAPE REV. P/U BY |
SANDY AJP |
9/6/07 - LANDSCAPE REVISION APPROVED, CALLED BILL |
TO P/U. FILED UNDER "H". CJH |
8/29/07 PLUMBING REV P201 P202 P203 P204 & P401 |
SEW |
8/29/07 BLDG REV LANDSCAPE CHANGES $70 SEW |
8/29/07 BLDG SUBMITTAL EXTERIOR RAILINGS SEW |
8/27/07 APPROVED EL. REV. #26 P/U BY BILL AJP |
8/26/07 ELEC REV OK,UNDER "H" FOR PU,CALLED AND |
SPOKE TO BILL MCQUEEN. DV PALMER. |
08/23/2007 BLDG SUBMITTAL (FLAG SUBMITTAL ) NO FEE |
MMILLER |
08/20/2007 ELECTRICAL REVISION # 26 FEES 130.00 |
MMILLER |
08/20/2007 MECHANICAL REVISION # 25 FEES $60.00 |
MMILLER |
8/9/07 APPROVED MECH REV. P/U BY SANDY AJP |
08/09/2007 BUILDING SUBMITTAL NO FEE (90 MIN SHOP |
DRAWINGS AND INSTALLATION (RESUBMITTA))MMILLER |
08/09/2007 BUILDING REVISION #24 FEES $80.00 |
MMILLER |
8/8/07 CALLED BILL MAC QUEEN FOR P/U PLANS BOX H |
HM. |
8/6/07 SUBMITTALS (ENTRY DOORS APPROVE, 90-MIN |
DOORS DENIED) P/U BYU BILL AJP |
8/6/07 MOVED TO LARGE PLAN BIN "H" AJP |
8/5/07 CALLED BILL FOR SUBMITTAL P/U.'H'.RB |
8/3/07 MECH REV AS BUILTS $70 SEW |
8/1/07 BLDG SUBMITTAL ENTRY DOORS 222-1 202-1 & |
203-1 SHOP DRAWINGS SEW |
07/24/07 BLDG SUBMITTAL NO FEE- 90 MIN DOORS- SHOP |
DRAWINGS AND INSTALLATION INSTRUCTION ROUTED TO R |
BROWN DESK FG |
7/19/07 APPROVED BLDG SUBMITTALA9EAST CANOP ROOF) |
P/U BY SANDY AJP |
7/14/07 CALLED BILL FOR SUBMITTL P/U.'H'.RB |
07/05/2007 BLDG SUBMITTA (EAST CANOPY ROOF SYSTEM |
NOA SUBMITTALS) NO FEE MMILLER |
6/26/07 BILL P/U PLANS 6/26/07 HM. |
06/26/07 CALLED BILL FOR P/U HM. |
06/20/2007 MECHANICAL SUBMITTAL NO FEE EXPLAINED |
TO CUSTOMER THAT IF MMILLER |
6/18/07 BILL P/U SUBMITTAL 5/3.4/27.4/25.6/11. |
SPALMER |
6/16/07 CALLED BILL TO P/U SUBMITTALS AND |
REVISIONS. LARGE BINS. 'H'. RB |
6/11/07 SANDY P/U DENIED ELEC REV DATED 5/23/07 |
SPALMER |
06/11/07 BLDG SUBMITTAL NO FEE- INTERIOR STAIR AND |
BALCONY RAILING - ROUTE TO R BROWN FG |
6/9/07 ELEC REV FROM 5/23 UNDER "H" (LARGE BINS) |
FOR PU, CALLED AND SPOKE TO BILL MCQUEEN. DV |
PALMER. |
05/25/07 BLDG SUBMITTAL NO FEE- INTERIOR STAIR |
RAILING & BALCONY RAILING SHOP DRAWINGS FG 5-25-07 |
JOHN RICHARDSON PICKUP ELEC REV DATED 5-2-07 WL |
05/25/2007 SANDY CAME TO PAY FULL AMOUNT OF FEES |
THAT IS OWED MMILLER |
5/24/07 ELEC REVISION $180 SLS |
5/18/07 VALUE INCREASED BY 674,667.08 OWES FEES OF |
$1,349.34 RECEIPT GIVEN TO DAVID LOWE SEW |
5/9/07 ELEC REV UNDER "H" FOR PU, NO REVIEW DONE, |
CREDIT OF $80 TO BE GRANTED FOR NEW REVISIONS TO |
BE BROUGHT IN AT LATE DATE. SEE ELECTRICAL NOTES |
DATED 5/9. CALLED AND SPOKE TO BILL MCQUEEN. DV |
PALMER. |
05/03/2007 BLDG SUBMITTAL NO FEE (EAST CANOPY ROOF |
SYSTEM NOA APPROVAL) MMILLER |
5/2/07 ELEC REV FIELD CHANGES $80 SEW |
04/27/07 REV $80 FEE- WEST ENTRY STRUCTURE ROUTE |
TO R BROWN DESK FG |
04/27/07 SUBMITTAL NO FEE- CABLE TRAY SYSTEM (U1 |
RATING) ROUTED TO R BROWN FG |
4/25/07 BLDG SUBMITTAL SHOP DRAWINGS SEW |
4/25/07 BLDG REV WALL CHANGES $90 SEW |
4/6/07 2 SUBMITTALS AND 1 REV DATED 3/1 & 3/9 |
SPALMER |
4-6-07 CALLED BILL TO P/U SUBMITTALS.'H'.RB |
4-4-07 BILL MACQUEEN PICKUP BLDG SUBMITTAL DATED |
2-12-07 WL |
3/22/07 ELEC SUBMITTAL DRAWINGS & CUT SHEETS |
REQUESTED BY DPALMER SEW |
3/22/07 SUBMITTAL PU BY AL SEW |
3/13/07 CALLED BILL TO P/U SUBMITTAL FOR GUARDRAIL |
AROUND ROOFTOP MECH. EQUIP.'H'.RB |
03/09/2007 BLDG REVISION FEES $80.00 MMILLER |
03/09/2007 BLDG SUBMITTAL NO FEE MMILLER |
03/09/2007 BLDG SUBMITTAL NO FEE MMILLER |
02/12/2007 BLDG SUBMITTAL NO FEE PER CUSTOMER, |
HOWEVER EXPLAINED TO THE CUSTOMER IF THERE IS A |
FEE THE PLAN REVIEWER WILL CHARGE FEES IF |
APPLICABLE MMILLER |
2/1/07 BILL P/U DENIED REV DATED 1/16/06 SPALMER |
1/31/07 ELEC REV SHEETS FROM 1/16 WHICH WERE |
DENIED ARE UNDER "H" (LARGE BINS) FOR PU.CALLED, |
SPOKE TO BILL, THESE ARE REVISIONS WHICH PART WERE |
ALREADY PICKED UP ON 1/26. DV PALMER |
1/30/07 BILL P/U REV DATED 12/08/06 SPALMER |
|
1/30/07 BILL P/U SUBMITTAL DATED 12/16/06 SPALMER. |
1/30/07 BILL P/U REV DATED 12/21/06 SPALMER. |
|
1/29/07 CALLED BILL MACQUEEN TO P/U REVISIONS AND |
SUBMITTALS. LARGE BINS.'H'.RB |
1-26-07 BILL MAC QUEEN PICKUP PARTIAL ELEC REV |
(PER DEWEY PALMER) WL |
1/25/07 ELEC REV OK, UNDER "H" FOR PU,CALLED, |
SPOKE TO BILL. (IN LARGE BINS)WITH COPY OF ORIG |
REV COVER SHEET. DV PALMER. |
1/16/07 BILL P/U REV DATED 12/08/06 SPALMER |
01-16-07 CALLED FOR P/U REV. "H" KSTEVENS |
01/16/2007 BLDG SUBMITTAL NO FEES MMILLER |
01/16/2007 ELECTRICAL REVISISONS FEES 330.00 |
MMILLER |
12/28/06 BILL P/U DENIED REV DATED 12/21/06 |
SPALMER |
12/27/06 ELEC REV UNSAT,CALLED SPOKE TO BILL, |
UNDER "H" LARGE BINS, ROLL PLAN FOR PU. DV PALMER. |
12/21/06 BLDG REVISION FEES $110.00 MMILLER |
12/20/06 BILL P/U REV DATED 12/8/06 SPALMER |
12/19/06 CALLED FOR P/U PLANS IN BOX **LARGE |
BINS** "H" HM. |
12/18/06 BILL P/U 7 REV SPALMER |
12/17/06 CALLED BILL MACQUEEN TO P/U REVISIONS AND |
SUBMITTALS.LARGE BINS.'H'.RB |
12/08/06 MECHANICAL REVISION FEES $100.00 MMILLER |
12/08/06 PLUMBING REVISION $ 120.00 MMILLER |
12/08/06 ELECTRICAL REVISION FEES $410.00 MMILLER |
12/08/06 BLDG REVISION $100.00 MMILLER |
12-8-06 PER BILL MACQUEEN NO FEE BLDG SUBMITTAL |
REQUESTED BY R BROWN/LOU PERINI "FIRE STOPPING FOR |
ROOF DINING PENETRATION" WL |
12/06/06 BLDG REVISION FEES $ 100.00 MMILLER |
12/06/06 LETTERS SUBMITTAL NO FEES MMILLER |
12/06/06 SHOP DRAWINGS NO FEES MMILLER |
11/21/06 ELEC REV $100 SPALMER |
11/17/06 (2) BLDG SUBMITTALS STONE SHOP DRAWINGS & |
FIRE SAFING OF ROOF DRAINS FOR RBROWN TO REVIEW |
SEW |
11/03/06 BILL P/U REV SPALMER |
11/2/06 CALLED BILL TO P/U FIRE DEPT REVIEW |
COMMENTS ON 10/10/06 SUBMITTAL FOR CUSTOM DOORS |
WITH TRANSOMS AND SIDELIGHTS.'H'. RB |
10/31/06 BILL P/U SUBMITTAL DATED 10/10/06 |
SPALMER |
10/31/06 BILL P/U ELEC REV DATED 10/26/06 SPALMER |
10/28/06 CALLED BILL TO P/U SUBMITTAL.'H'. RB |
10/28/06 ELEC REV FROM 10/26 UNSAT, CALLED, SPOKE |
TO BILL, TOLD TO BRING IN BLUE CARD. UNDER "H" FOR |
PU. DV PALMER. |
10/26/06 BLDG REVISION $220 SLS |
10/26/06 ELEC REVISION $90 SLS |
10-10-06 BILL MACQUEEN PICKUP REV DATED 7-18-06 |
INITIALED BLUE CARD WITH 10-10-06 FOR NO FEE BLDG |
SUBMITTAL TAKEN BY T ADAMS WL |
10/10/06 BLDG SUBMITTAL (90 MIN DRS & FRAMES) NO |
FEE. TA |
10-9-06 CALLED BILL MACQUEEN FOR REVISION P/U. |
LARGE BINS. 'H' RB |
10/2/06 BILL P/U 4 REV DATED 8/25/06 8/28/06 |
9/18/06 9/22/06 SPALMER |
10-1-06 CALLED BILL MACQUEEN FOR REVISION AND |
SUBMITTAL P/U 'H' RB |
9/22/06 BLDG REV $80 (REV WALL TYPES W/UL SPEC) TA |
9/18/06 SUBMITTAL OF A WINDOW SHOP DRWG NO FEE |
ROUTE TO ROBERT BROWN SLS |
8/28/06 SUBMITTAL NO FEE CHANGES OF UL NUMBERS- |
ROUTE TO R BROWN FG |
8/25/06 SUBMITTAL NO FEE- FIELD OBSERVATION |
REPORTS ROUTE TO ROBERT BROWN TO REVIEW FG 8/24/06 |
APPROVED BLDG REV. P/U BY JUDY AJP 8-20-06 CALLED |
BILL MACQUEEN FOR SUBM'L P/U 'H' RB 8/11/06 BLDG |
SUBMITTAL NO FEE PER CUSTOMER SPALMER 7/24/06 |
THREE SUBMITTALS (TWO FROM HEDRICK BROS., ONE FROM |
COASTAL MILLWORK) P/U BY BILL AJP 7-22-06 CALLED |
BILL MACQUEEN FOR SUBM'L P/U 'H' RB 7-22-06 CALLED |
TONY PEREZ FOR LOCAL PRODUCT APPROVAL P/U 'C' (FOR |
COASTAL MILLWORKS) RB 7-18-06 REV #7 |
BLDG/ELEC/PLUMB/MECH/ZONING REV "ATTEN: ROBERT |
BROWN" WL |
6/29/06 BLDG SUBMITTAL OF ROOF PRECAST ERECTION |
ENGINEERING PACKAGE FOR ROBERT BROWN REV. TA |
6/29/09 BLDG SUBMITTAL FOR ROBERT BROWN OF STONE |
ANCHOR LETTER. TA |
6/27/06 SUBMITTAL OF PBC WINDOW PRODUCT APPROVALS |
GIVEN TO ROBERT BROWN. NO FEE CHG. TA |
6/27/06 BILL P/U SUBMITTAL SPALMER |
6-26-06 CALLED BILL MCQUEEN TO P/U SUBMITTAL.'H'RB |
6/23/06 SUB/BLDG (FIELD OBSERVATION REPORT) PT |
6-19 BILL MCQUEEN PICKUP SUBMITTAL & REV WL |
6-17-06 CALLED BILL MCQUEEN TO P/U SUBMITTAL AND |
REVISION. 'H'. RB. |
6/15/06 SUBMITTAL NO FEE-CONTRACTOR REQUEST FOR |
SUBMITTAL TO BE GIVEN TO R BROWN FG |
6/12/06 BILL P/U PLANS SPALMER |
6-11-06 CALLED BILL MCQUEEN TO P/U SUBMITTALS. |
**ROLL PLANS** 'H'. RB |
6/9/06 BLDG REV $80 SEW |
6/5/06 BLDG SUBMITTAL NO FEE ROUTED TO R BROWN FG |
5/15/06 TWO BLDG REV.'S P/U BY BILL AJP |
5/15/06 BLDG SUBMITTAL SEW |
5-10-06 CALLED BILL MCQUEEN FOR REVISION P/U'H'.RB |
4/18/06 BLDG REV FOR ROBERT BROWN $ SPALMER |
4/18/06 BLDG REV FOR ROBERT BROWN $60 SPALMER |
4/10/06 PU BY BILL SEW |
4-9-06 CALLED BILL MCQUEEN FOR STRUCTURAL |
SUBMITTAL P/U.'H'.RB |
4/6/06 SUBMITTAL BLDG FOR ROBERT BROWN SPALMER |
3/27/06 BLDG REV. P/U BY BILL AJP |
3/27/06 BLDG SUBMITTAL NO FEE REQ BY ROBERT BROWN |
PER CUST//GIVEN TO ROBERT B TA |
3-25-06 CALLED BILL MCQUEEN FOR REVISION P/U'H'.RB |
*********************************************** |
*********************************************** |
4-8-05 CALLED FOR P/U BOTTOM SHELF HEDRICK PHK |
6-29-05 CHRIS MATTINGLY PICKUP PLANS WL |
6-29-05 CHRIS M SUBMIT PLANS & CHANGE TO PERMIT |
APPL PAYING ONLY $50,439.52 (A LITTLE OVER 30% AT |
THIS TIME) WL |
7-22-05 DENIED. CALLED ROBIN FOR P/U 'H'. RB |
7/25/05 CHRIS P/U DENIED PLANS SPALMER |
8-2-05 R BROWN REC'D, FROM NEIL MELICK, A LETTER |
FROM PALM BEACH COUNTY RE: HISTORIC DESIGNATION. |
LETTER IS ON RB DESK TO BE INCLUDED WITH PERMIT |
APPLICATION UPON RE-SUBMITTAL. RB |
8-16-05 E-MAILED ROBIN LUNSFORD (HEDRICK BROTHERS) |
TO P/U HIS COPY OF THE PLANS 'H'. RB |
8/17/05 CHRIS P/U PLANS SPALMER |
10/4/05 1ST RESUB NO FEE SPALMER |
12-10-05 DENIED. CALLED ROBIN FOR P/U 'H'. RB |
12/14/05 ARCHIE P/U PLANS FG |
12/14/05 2ND RESUB/ DID NOT PAY RESUB FEE FG |
12/19/05 PLANS PICKED UP AND TAKEN FOR |
VERIFICATION OF CORRECTIONS BY VINCENT AND ALFRED. |
DVP. |
12/19/05 PLANS BROUGHT BACK IN AT 4PM, SAME DAY. |
DV PALMER |
1-4-06 NEEDS REVIEW OF THRESHOLD INSPECTOR |
AGREEMENT AND SIGNATURE ON ELECTRICAL PLANS BEFORE |
PERMIT ISSUE. PLANS ON J HARDY DESK FOR STAMP'G RB |
1-5-06:PLANS , GIVEN TO DVP. JAH |
1/6/05 PERMIT AND PLANS PICKED UP BY ROBIN/HEDRICK |
BROTHERS. DV PALMER |
1/6/06 SUBMITTIAL, SHORING DETAILS DVP. |
1/18/06 SUBMITTAL NO FEE SPALMER |
1-20-06 CALLED BILL MCQUEEN FOR SUBMITL P/U.'H'.RB |
1/23/06 2 SETS OF SHOP DRAWINGS P/U BY BILL AJP |
1/26/06 SUBMITTAL SHORING DRAWING SPALMER |
2/1/06 BLDG REV $280 SPALMER |
2-1-06 BILL P/U SHORING DRAWING SUBMITTAL. RB |
2/2/06 BLDG SUBMITTAL ROUTED TO HAROLD OKAYED SEW |
2-3-06 CALLED BILL MCQUEEN FOR REVISION P/U.'H'.RB |
2/6/06 REV. P/U BY BILL AJP |
2/24/06 BLDG REV SEW |
3/8/06 SUB/BLDG SHORING SHOP DRAWINGS PT |
3-8-06 CALLED BILL MCQUEEN FOR STRUCTURAL REVISION |
AND SUBMITTAL P/U.'H'.RB |
3/9/06 BILL P/U SUBMITTALS SPALMER |
3-15-06 REV #3 BLDG $100 WL |