2017-12-11 12:03:54 | 1ST REVIEW FBC-2014 MECHANICAL, ENERGY CONSERVATION |
| CODES, |
| WEST PALM BEACH AMENDMENTS TO THE FBC. |
| PERMIT #17110075 |
| THE OLD CITY HALL SITE APARTMENTS |
| 12/6/17 |
| |
| PLAN REVIEW RESULTS: DENIED. |
| |
| 1) THE AC CALCULATIONS MUST BE SIGNED AND SEALED BY THE |
| ENGINEER OF RECORD- SECTION 105.3.1.2 FBC-14. |
| |
| 2) COMMISSIONING OF THE MECHANICAL SYSTEMS IS REQUIRED |
| PER SECTION C408.2 FBC-14 ENERGY CONSERVATION. SUBMIT A |
| COMMISSIONING PLAN AS OUTLINED IN SECTION C408.2.1 AND |
| DESCRIBED IN SECTIONS C403.2.2- C408.2.3.3. PLEASE NOTE |
| THAT A COPY OF THE COMMISSIONING REPORT SHALL BE |
| SUBMITTED FOR REVIEW AT FINAL INSPECTION. |
| |
| 3) THE AC CALCULATIONS ARE INDICATED TO BE FOR PACKAGED |
| TERMINAL AIR CONDITIONERS HOWEVER MOST OF THE SYSTEMS |
| ARE EITHER SPLIT OR ROOF TOP UNITS. PLEASE MATCH THE |
| SYSTEM TYPES SHOWN IN THE CALCULATIONS WITH THE SYSTEMS |
| SELECTED IN THE PLANS. |
| |
| 4) SUMMER DRY BULB AND WET BULB TEMPERATURES FOR WEST |
| PALM BEACH PER ACCA MANUAL N ARE 90 AND 78 DEGREES, |
| HOWEVER MANY OF THE CALCULATIONS ARE INDICATING |
| TEMPERATURES AS LOW AS 80 AND 68 DEGREES. PLEASE |
| CLARIFY HOW THE VARYING PEAK TIMES AND HOURS HAVE BEEN |
| DETERMINED, VERIFY THAT THE TRACE 700 CALCULATION |
| PROGRAM IS COMPLIANT WITH ASHRAE/ACCA STANDARD 183 OR |
| ACCA MANUAL N PER SECTION C403.2.1. |
| |
| 5) THE ENERGYGAUGE COMPLIANCE SUBMITTAL SHOWS |
| COMPLIANCE DATA FOR THE AC SYSTEMS THAT DOES NOT MATCH |
| THE SYSTEMS SPECIFIED ON SHEET M4.04. THERE ARE MANY |
| INCONSISTENCIES INCLUDING THE NUMBER OF SYSTEMS FOR THE |
| APARTMENT, SYSTEM CAPACITIES AND EFFICIENCY RATINGS FOR |
| BOTH THE APARTMENT AND COMMON AREA SPLIT SYSTEMS, TYPES |
| OF SYSTEMS AND SYSTEM IDENTIFICATIONS, ETC. MISSING |
| FROM THE CALCS ARE THE MINI SPLIT SYSTEMS AND OAU?S 1, |
| 2, & 3 SHOWN IN THE SCHEDULE. MISSING FROM THE SCHEDULE |
| ARE THE 8.0 AND 10.0 PACKAGE SYSTEMS SHOWN IN THE |
| CALCS. |
| |
| 6) FUTURE OLIVE AND BANYAN RETAIL: THERE ARE NO |
| MECHANICAL SYSTEMS PROPOSED FOR THE FUTURE RETAIL AREAS |
| HOWEVER THE ENERGYGAUGE SUBMITTAL IS PROVIDING |
| CALCULATIONS FOR A NEW FINISHED BUILDING. HOW ARE THESE |
| AREAS GOING TO MEET COMPLIANCE? |
| |
| 7) THE SLS SMOKE CONTROL RATIONAL ANALYSIS REPORT IS |
| MISSING THE REQUIRED ELECTRONIC SIGNATURE AND SEAL OF |
| THE ENGINEER- SECTION 61G15-23.005 FLORIDA |
| ADMINISTRATIVE CODE. |
| |
| 8) COMMISSIONING OF THE SMOKE CONTROL SYSTEM IS |
| REQUIRED IN ACCORDANCE WITH THE REPORT SLS REPORT. |
| PLEASE REFER TO PAGES 30-34 FOR TESTING PROCEDURES, |
| INSPECTIONS, AND REPORT SUBMITTALS. IN ACCORDANCE WITH |
| THE REPORT, TESTING SCENARIOS MUST BE SUBMITTED TO BOTH |
| THE WPB BUILDING AND FIRE DEPARTMENTS FOR REVIEW PRIOR |
| TO COMMISSIONING OF THE SYSTEM, AND A FINAL REPORT OF |
| THE COMMISSIONING IS REQUIRED. |
| |
| 9) SHEET M4.04: THE O/A CALCULATIONS FOR THE FITNESS |
| ROOM SHALL BE CALCULATED AT 20 CFM PER PERSON. TOTAL |
| 480 CFMS REQUIRED. MISSING FROM THE SCHEDULE ARE O/A |
| CALCULATIONS FOR THE CORRIDORS, MAILROOM, ELEVATOR |
| LOBBIES, STORAGE ROOMS- LVLS 1-3, |
| |
| 10) GARAGE EXHAUST VENTILATION: THERE APPEARS TO BE |
| INCONSISTENCIES ON HOW THE EXHAUST SYSTEMS WILL |
| FUNCTION BASED ON THE MECHANICAL FLOOR PLANS, THE |
| CONTROLS OPERATION ON SHEET M5.03, AND THE CONTROL |
| SYSTEM AS OUTLINED ON PAGE 9 OF THE SLS SMOKE CONTROL |
| RATIONAL ANALYSIS REPORT. THE REPORT IS REQUIRING AN |
| EXHAUST RATE OF 1 CFM/SF. OVER THE FLOOR AREA TO BE |
| PROVIDED CONTINUOUSLY. THE CONTROLS OPERATION SEQUENCE |
| ON M5.03 OF OPERATIONS INDICATES ONE FAN ON EACH GARAGE |
| LEVEL TO RUN CONTINUOUSLY WITH THE OTHER FANS TO BE |
| ACTIVATED BY CO AND NO2 SENSORS. THE SEQUENCE OF |
| OPERATIONS, HOWEVER, DOES NOT SPECIFY EXHAUST RATES TO |
| BE PROVIDED ON ANY OF THE LEVELS. THE MECHANICAL FLOOR |
| PLAN DRAWINGS FOR THE PARKING LEVELS PROVIDE THE |
| EXHAUST RATES AND TOTAL CFMS REQUIRED PER FLOOR LEVEL |
| BUT DO NOT SHOW THE LOCATIONS OF SENSORS OR INDICATE IF |
| THE FANS WILL RUN CONTINUOUSLY. PLEASE REFER TO |
| SECTIONS 404.1 AND 404.2 AND CORRELATE THE PLANS |
| TOGETHER. |
| |
| 11) SHEETS M1.1.1A, M1.1.1B, & M1.1.1C: THE TRANSFER |
| GRILLS SHOWN IN THE STAIR #2, 3, AND 4 ENCLOSURES ARE |
| PROHIBITED PER SECTION 1022.3.1 & 1023.6 FBC-14 |
| BUILDING. REFER TO THE SMOKE CONTROL RATIONAL ANALYSIS- |
| NEITHER THE TRANSFER GRILLS OR THE EXIT PASSAGEWAYS ARE |
| SPECIFIED AS PART OF THE STAIR PRESSURIZATION METHODS |
| IN THE SMOKE CONTROL RATIONAL ANALYSIS. IT APPEARS |
| THERE ARE CONFLICTS BETWEEN THE SMOKE CONTROL SYSTEM |
| DESIGN, THE PLAN DESIGN, AND WHAT IS ALLOWED BY CODE- |
| PLEASE CLARIFY AND REVISE ACCORDINGLY. |
| |
| 12) M1.1.1A: THE TRASH ROOM SHALL BE PROVIDED WITH AN |
| EXHAUST SYSTEM WITH A MINIMUM RATE OF 1.00 CFM/SF.- |
| TABLE 6-4 ASHRAE 62.1-2010. |
| |
| 13) M1.1.1A: O/A IS REQUIRED IN THE STORAGE ROOM- TABLE |
| 403.3. |
| |
| 14) M1.1.1A, M1.1.1B, M1.1.1C, & M1.1.1D: VERIFY |
| COMPLIANCE WITH SECTION 401.5 ? O/A INLET CLEARANCE |
| DISTANCES, AND SECTION 501.3.1- EXHAUST OUTLET |
| CLEARANCES. |
| |
| 15) M1.1.1A, M1.1.1B, & M1.1.1C: AIR COOLED, EXTERIOR |
| CONDENSERS FOR THE MINI SPLIT SYSTEMS ARE BEING |
| INSTALLED IN THE INTERIOR OF THE BUILDING. SUBMIT |
| MANUFACTURER?S SPECIFICATIONS AND INSTALLATION |
| GUIDELINES TO VERIFY THIS IS ACCEPTABLE PER THE |
| MANUFACTURER. INDICATE HOW THE HOT, MOIST AIR FROM THE |
| CONDENSERS WILL BE EXHAUSTED OUT OF THE ENCLOSED |
| SPACES. PLEASE NOTE THAT THIS IS A TYPICAL CONDITION |
| THROUGHOUT THE 2ND, 3RD, AND 4TH FLOOR GARAGE LEVELS. |
| |
| 16) M1.1.1B: PROVIDE THE DIMENSIONS OF THE OPEN-ENDED |
| GARAGE EXHAUST DUCT, AND HEIGHT ABOVE THE FINISHED |
| FLOOR. |
| |
| 17) M1.1.1B & M1.1.1D: PROVIDE EXHAUST VENTILATION |
| CALCULATIONS FOR THE GROUND FLOOR GARAGE, OR CLARIFY IF |
| THEY ARE INCORPORATED INTO THE 2ND FLOOR CALCULATIONS |
| SHOWN ON SHEET M1.2.1B & M1.1.2D. |
| |
| 18) M1.1.1B: PROVIDE AN EXHAUST VENTILATION CALCULATION |
| FOR THE FIRE PUMP ROOM. HOW WAS THE FAN SIZED AND WHAT |
| IS THE SEQUENCE OF OPERATION? |
| |
| 19) M1.1.1B, M1.1.1C, & M1.1.1D: INDICATE HOW MAKEUP |
| AIR IS BEING PROVIDED FOR THE GROUND LEVEL GARAGE |
| EXHAUST. |
| |
| 20) M1.1.1C: INDICATE THE HEIGHT OF THE 18"X10" DUCT |
| ABOVE THE GARAGE FLOOR. |
| |
| 21) M1.1.1D: INDICATE THE HEIGHT OF THE 42"X42" DUCT |
| ABOVE THE GARAGE FLOOR. |
| |
| 22) M1.2.1A: THE DUCT SMOKE DETECTOR IN THE 24X10 |
| RETURN DUCT FOR AC-2-1 SHALL BE INSTALLED UPSTREAM OF |
| THE O/A DUCT CONNECTION- SECTION 606.2.1. |
| |
| 23) M1.2.1A: A DUCT SMOKE DETECTOR IS REQUIRED IN THE |
| RETURN AIR SYSTEM OF AC-2-2- SECTION 606.2.1. |
| |
| 24) M1.2.1A: PROVIDE ARCHITECTURAL PLAN AND ELEVATION |
| VIEWS OF THE EQUIPMENT PLATFORM AND ACCESS LADDER- SEE |
| SECTION 306.1. |
| |
| 25) M1.2.1A: PROVIDE EXHAUST VENTILATION CALCULATIONS |
| FOR EF-M1 (LOADING DOCK), AND EF-M2 (GENERATOR ROOM). |
| INDICATE THE SEQUENCE OF OPERATION FOR EACH FAN, AND |
| HOW MAKE UP AIR IS BEING PROVIDED FOR EF-M1. |
| |
| 26) M1.2.1A: PROVIDE THE CLEARANCE DISTANCE |
| MEASUREMENTS FOR THE GENERATOR DISCHARGE PIPE AND THE |
| GENERATOR RADIATOR EXHAUST OUTLET LOUVER- SEE SECTION |
| 501.3.1 (2). |
| |
| 27) M1.2.1A: THE AIR COOLED, EXTERIOR CU-2-1 AND CU-2-2 |
| CONDENSERS ARE BEING INSTALLED IN THE INTERIOR OF THE |
| BUILDING. SUBMIT MANUFACTURER?S SPECIFICATIONS AND |
| INSTALLATION GUIDELINES TO VERIFY THIS IS ACCEPTABLE |
| PER THE MANUFACTURER. INDICATE HOW THE HOT, MOIST AIR |
| FROM THE CONDENSERS WILL BE EXHAUSTED OUT OF THE |
| ENCLOSED SPACES. |
| |
| 28) M1.2.1A: PROVIDE SUPPORT AND HANGING DETAILS FOR |
| CU-2-1 AND CU-2-2. |
| |
| 29) M1.2.1A: CLARIFY HOW ACCESS TO SERVICE OR REPLACE |
| GEF-2-4 AND EF-M1 WILL BE PROVIDED- SEE SECTION 306.5. |
| |
| 30) M1.2.1B: INDICATE WHICH PLAN SHEET SHOWS |
| ARCHITECTURAL DETAILS FOR THE GENERATOR INTAKE PLENUM. |
| |
| 31) M1.2.1B & M1.2.1D: CLARIFY IF THE EXHAUST |
| VENTILATION CALCULATIONS SHOWN FOR THE GARAGE ARE FOR |
| THE 1ST AND 2ND GARAGE FLOOR LEVELS. |
| |
| 32) M1.2.1D: O/A NOT PROVIDED TO THE ELEVATOR LOBBY- |
| TABLE 403.3 |
| |
| 31) M1.2.1A, M1.2.1B, M1.2.1C, & M1.2.1D: VERIFY |
| COMPLIANCE WITH SECTION 401.5- O/A INLET CLEARANCE |
| DISTANCES, AND SECTION 501.3.1- EXHAUST OUTLET |
| CLEARANCES. |
| |
| 33) M1.3.1B: PROVIDE AN EXHAUST VENTILATION CALCULATION |
| OF THE STORAGE ROOM. CLARIFY HOW O/A WILL BE PROVIDED |
| TO THE ROOM- TABLE 403.3 |
| |
| 34) M1.3.1D: O/A NOT PROVIDED TO THE ELEVATOR LOBBY- |
| TABLE 403.3. |
| |
| 35) M1.4.1A: FIRE SMOKE DAMPERS MISSING WHERE THE |
| 16?X8? SMOKE EXHAUST DUCT PENETRATES THE SHAFT, AND THE |
| 18"X10" DUCT PENETRATES THE CORRIDOR WALL AND THE |
| SHAFT. |
| |
| 36) M1.4.1A: THE EXHAUST DUCT FROM THE TOILET ROOM MUST |
| DISCHARGE TO THE OUTDOORS- SECTION 501.3. |
| |
| 37) M1.4.1A: PROVIDE SUPPORT AND HANGING DETAILS FOR |
| AC-4-3 AND AC-4-4: INDICATE THE HEIGHT OF AC-4-3 ABOVE |
| THE FINISHED FLOOR AND HOW ACCESS WILL BE PROVIDED. |
| |
| 38) M1.4.1C: PROVIDE SUPPORT AND HANGING DETAILS FOR |
| AC-4-1 AND INDICATE HOW ACCESS WILL BE PROVIDED. |
| |
| 39) M1.4.1C: PROVIDE STRUCTURAL AND ARCHITECTURAL |
| DETAILS FOR THE 2HR FIRE-RATED ENCLOSURE FOR SEF-3. |
| INDICATE THE HEIGHT OF THE ENCLOSURE ABOVE THE FINISHED |
| FLOOR. |
| |
| 40) M1.4.1D: O/A NOT PROVIDED TO THE ELEVATOR LOBBY- |
| TABLE 403.3. |
| |
| 41) M1.5.1A: A DUCT SMOKE DETECTOR IS REQUIRED IN THE |
| RETURN AIR SYSTEM OF THE 5-TON AC-5-1 AIR HANDLER PER |
| SECTION 606.2.1. PLEASE NOTE THAT AN EXEMPTION CAN BE |
| APPLIED IF THE MANUFACTURER'S SPECIFICATIONS INDICATE |
| THE SYSTEM IS NOT CAPABLE OF PRODUCING OVER 2000 CFMS |
| OF SUPPLY AIR. |
| |
| 42) M1.5.1A: PROVIDE CLEARANCE DISTANCE MEASUREMENTS |
| FOR THE SEF-6A&B EXHAUST OUTLET PER SECTION 501.3.1(2). |
| |
| 43) M1.5.1B & M1.5.1D: PROVIDE AN EXHAUST VENTILATION |
| CALCULATION FOR THE POOL EQUIPMENT ROOM AND PROVIDE A |
| SEQUENCE OF OPERATION FOR EF-5-1. |
| |
| 44) M1.5.1C: REFER TO SHEET A9.75.3 WHICH SHOWS AN |
| APPLIANCE LEGEND THAT INCLUDES COOKING AND LAUNDRY |
| APPLIANCES. PLEASE SHOW THE LOCATIONS OF THE APPLIANCES |
| ON THE MECHANICAL PLANS AND PROVIDE EXHAUST AND AIR |
| INTAKE CALCULATIONS AND DETAILS WHERE REQUIRED. SUBMIT |
| MANUFACTURER'S SPECIFICATIONS FOR ALL APPLIANCES AND |
| EQUIPMENT. |
| |
| 45) M1.5.1D: PROVIDE AN EQUIPMENT SCHEDULE FOR THE POOL |
| HEATER AND SUBMIT MANUFACTURER'S SPECIFICATIONS. |
| |
| 46) M1.5.1D: INDICATE THE TERMINATION LOCATION OF THE |
| 6" BOILER EXHAUST DUCT. |
| |
| 47) M1.10.1A: PROVIDE THE UL LISTED AND LABELED |
| ASSEMBLY DETAILS FOR THE 2HR FIRE-RATED REFRIGERATION |
| PIPING ENCLOSURES, AND THE FIRESTOPPING ASSEMBLIES TO |
| PROTECT THE PENETRATIONS OF THE ENCLOSURE INTO THE |
| SHAFT AND THE PIPINGS INTO THE ENCLOSURE. CLARIFY HOW |
| ACCESS TO THE REFRIGERANT PIPING WILL |
| |
| 48) M1.11.1A & M1.11.1D: O/A NOT PROVIDED TO THE |
| ELEVATOR LOBBIES- TABLE 403.3. |
| |
| 49) M1.11.1A: FSD'S MISSING AT THE AIR INTAKE LOUVER |
| AND DUCT PENETRATION INTO THE STAIR SHAFT. |
| |
| 50) M1.11.1D: FSD'S MISSING AT THE AIR INTAKE AND |
| RELIEF LOUVER PENETRATION INTO THE STAIR SHAFT. |
| |
| 51) M1.11.1A M1.11.1B, M1.11.1C, & M1.11.1D: WIND LOAD |
| ENGINEERING REQUIRED FOR INSTALLATION OF ALL ROOFTOP |
| EQUIPMENT AND APPLIANCES INCLUDING THE O/A UNITS, THE |
| SPLIT AND MINI SPLIT CONDENSERS, THE FANS, THE |
| DUCTWORK, THE REFRIGERANT PIPING ENCLOSURE ETC.- |
| SECTION 301.15 AND SECTION 1609 FBC-14 BUILDING. |
| |
| 52) REFER TO SHEET M4.04 & SLS SMOKE CONTROL REPORT- |
| SUMMARY OF RESULTS (PAGE 28): |
| |
| A) STAIR #2 FAN IS SPECIFIED AT 10,000 CFM IN THE |
| SUMMARY, 11,000 CFM IN THE SCHEDULE. |
| |
| B) SUMMARY IS INDICATING PRESSURIZATION AND EXHAUST |
| CFMS FOR STORY 3 THROUGH 8, HOWEVER THE CFMS SPECIFIED |
| THERE APPEAR TO RELATE ONLY TO STORY 5-10 (SEF-1 & 2). |
| STORIES 9 & 10 ARE EXCLUDED FROM THE SUMMARY. |
| ADDITIONALLY, IT APPEARS THAT STORY 3 & 4 HAVE LESS |
| EXHAUST CFMS ON THE PLAN THEN WHAT IS SHOWN IN THE |
| SUMMARY. |
| |
| C) SUMMARY SPECIFIES 1000 CFMS FOR 2ND STORY CORRIDOR- |
| 725 CFMS PROVIDED. |
| D) SUMMARY SPECIFIES 6 AIR CHANGES PER HOUR FOR THE |
| LOBBY AND AMENITIES AREAS. VERIFY THAT OPERATION OF |
| SEF- 3, 4, & 5 ARE MEETING THOSE REQUIREMENTS. |
| |
| 53) M2.1.1, UNIT D2-1: IT APPEARS THAT THE LOCATION OF |
| THE LOUVERED RETURN OPENING FOR AC-5T WILL BE RETURNING |
| AIR FROM THE KITCHEN AND COOKING APPLIANCES WHICH IS |
| PROHIBITED PER SECTION 918.6 (5) FBC-14 MECHANICAL. |
| PLEASE CONSIDER THIS A "TYPICAL" COMMENT THAT WILL |
| APPLY TO ALL UNITS WITH SIMILAR CONDITIONS. |
| |
| 54) M2.1.1: A DUCT SMOKE DETECTOR IS REQUIRED IN THE |
| RETURN AIR SYSTEM OF AC-5T PER SECTION 606.2.1. PLEASE |
| NOTE THAT AN EXEMPTION CAN BE APPLIED IF THE |
| MANUFACTURER'S SPECIFICATIONS INDICATE THE SYSTEM IS |
| NOT CAPABLE OF PRODUCING OVER 2000 CFMS OF SUPPLY AIR. |
| . PLEASE CONSIDER THIS A "TYPICAL" COMMENT THAT WILL |
| APPLY TO ALL UNITS WITH 5-TON OR GREATER SYSTEMS. |
| |
| 55) M2.2.1 & M2.4.1, UNITS 303, 304, 307, 308: PROVIDE |
| RETURN AIR FROM THE BEDROOMS- SECTION 601.5. |
| |
| 56) M2.3.1, UNITS 305 & 306: PROVIDE RETURN AIR FROM |
| THE BEDROOMS- SECTION 601.5. |
| |
| 57) M2.4.1: SEE COMMENTS #56 & 77. |
| |
| 60) M2.5.1, UNIT 310: PROVIDE RETURN AIR FROM THE |
| BEDROOM- SECTION 601.5. |
| |
| 61) M2.6.1, UNIT 311: PROVIDE RETURN AIR FROM THE |
| BEDROOM- SECTION 601.5. |
| |
| 62) M2.7.1, UNIT 602, 603: THE 10"X6" RETURN TRANSFER |
| DUCTS FROM THE BEDROOMS ARE UNDERSIZED- SECTION |
| 601.5(1) & (3). |
| |
| 63) M2.9.1, UNIT 607: THE 12"X6" RETURN TRANSFER DUCT |
| FROM THE MASTER BEDROOM IS UNDERSIZED- |
| SECTION 601.5(1) & (3). |
| |
| 64) M2.10.1, UNIT 609: THE 16"X6" RETURN TRANSFER DUCT |
| FROM THE MASTER BEDROOM IS UNDERSIZED- SECTION 601.5(1) |
| & (3). |
| |
| 65) M2.11.1, UNIT 609: THE 16"X6" RETURN TRANSFER DUCT |
| FROM THE MASTER BEDROOM IS UNDERSIZED- SECTION 601.5(1) |
| & (3). |
| |
| 66) M2.12.1, UNIT 614: THE AC CALCULATION IS INDICATING |
| THE 2.5-TON SYSTEM (C2-1) SELECTED IS OVERSIZED- |
| SECTION C403.2.2 FBC-14 ENERGY CONSERVATION. |
| |
| 67) M2.12.1, UNIT 614: THE 12"X6" RETURN TRANSFER DUCT |
| FROM THE MASTER BEDROOM IS UNDERSIZED- SECTION 601.5(1) |
| & (3). |
| |
| 68) M2.15.1, UNIT 624: PROVIDE RETURN AIR FROM THE |
| MASTER BEDROOM- SECTION 601.5. |
| |
| 69) M2.15.1, UNIT 623: THE 10"X6" RETURN TRANSFER DUCT |
| FROM THE MASTER BEDROOM IS UNDERSIZED- SECTION 601.5(1) |
| & (3). |
| |
| 70) M2.17.1, UNIT 630: : PROVIDE RETURN AIR FROM THE |
| BEDROOM- SECTION 601.5. |
| |
| 71) M2.21.1, UNIT 639: THE 10"X6" RETURN TRANSFER DUCTS |
| FROM THE BEDROOMS ARE UNDERSIZED- SECTION 601.5(1) & |
| (3). |
| |
| 72) M2.21.1, UNIT 639: THE AC SYSTEM SIZE IS NOT |
| SPECIFIED ON THE PLAN. |
| |
| 73) M2.27.1, UNIT 502 &1002: THE 10"X6" RETURN TRANSFER |
| DUCT FROM THE MASTER BEDROOM IS UNDERSIZED- SECTION |
| 601.5(1) & (3). |
| |
| 74) M2.28.1, UNITS 501 & 1001: A) THE AC SYSTEM SIZE IS |
| NOT SPECIFIED ON THE PLAN. B) THE 10"X6" RETURN |
| TRANSFER DUCT FROM THE MASTER BEDROOM IS UNDERSIZED- |
| SECTION 601.5(1) & (3). |
| |
| 75) M2.30.1, UNIT 1039: THE 16"X6" RETURN TRANSFER DUCT |
| FROM THE MASTER BEDROOM IS UNDERSIZED- SECTION 601.5(1) |
| & (3). |
| |
| 76) M2.33.1, UNIT 539: A) THE AC SYSTEM SIZE IS NOT |
| SPECIFIED ON THE PLAN. B) THE 16"X6" RETURN TRANSFER |
| DUCT FROM THE MASTER BEDROOM IS UNDERSIZED- SECTION |
| 601.5(1) & (3). |
| |
| 77) REVIEW OF THE AC CALCULATIONS AND THE SYSTEMS |
| SELECTED INDICATES THAT SOME OF THE SYSTEMS HAVE BEEN |
| OVERSIZED. PLEASE REVIEW THE LIST OF SYSTEMS BELOW AND |
| SECTION C403.2.2 FBC-14 ENERGY CONSERVATION. |
| 1) M2.2.1- UNIT 302 (C2-2) |
| 2) M2.2.1- UNIT 304 (S9-1) |
| 3) M2.3.1- UNIT 305 (S9-1) |
| 4) M2.5.1- UNIT 309 (C1-1) |
| 5) M2.6.1- UNIT 311 (S6-1) |
| 6) M2.12.1- UNIT 615 (C1-1) |
| 7) M2.12.1- UNIT 614 (C2-1) |
| 8) M2.13.1- UNIT 617 (A4-1) |
| 9) M2.13.1- UNIT 616 (B1-1) |
| 10) M2.15.1- UNIT 623 (D1-1) |
| 11) M2.23.1- UNITS 536 & 1036 (A5-2) |
| 12) M2.24.1- UNITS 541 & 1041 (A10-1) |
| 13) M2.27.1- UNITS 524 (C6-1) |
| 14) M2.28.1- UNITS 523 & 1023 (D1-1) |
| 15) M2.31.1- UNITS 516 & 1016 (B1-1) |
| 16) M2.31.1- UNITS 517 & 1017 (A4-1) |
| 17) M2.33.1- UNITS 515 & 1015 (C1-1) |
| |
| 78) REQUIRED SUBMITTALS: SMOKE CONTROL FANS, AC STANDS |
| AND CURBS, FAN CURBS, EXHAUST AND AIR INTAKE LOUVERS, |
| FIRE DAMPERS AND FIRE/SMOKE DAMPERS, DUCT SMOKE |
| DETECTORS, GENERATOR, FIRE WRAPPING, X-VENTS, CO AND |
| NO2 SENSORS, RESIDENTIAL DRYERS AND RANGE HOODS. |
| |
| WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| RE-SUBMITTAL FORM. |
| |
| CHRISTOPHER L. COLE |
| MECHANICAL PLANS EXAMINER |
| 401 CLEMATIS STREET |
| WEST PALM BEACH FL 33401 |
| 561-805-6719 |
| [email protected] |
| |
| |