Plan Review Notes
Plan Review Notes For Permit 17110075
Permit Number 17110075
Review Stop B
Sequence Number 4
Notes
Date Text
2018-06-04 10:33:30****PROVISOS****
 ****ISSUED AT APPLICANT'S RISK****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 FBC = FLORIDA BUILDING CODE, 5TH EDITION (2014)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
  
 1. GENERAL COMMENT, FBC 107, SOME FMEP COMMENTS ARE
 ALSO FBC B REQUIREMENTS. A BUILDING REVIEW ON THESE
 ITEMS WILL BE DONE UPON RESUBMITTAL.
  
 2. REVISION REQUIRED PRIOR TO INSTALLATION - FBC 107,
 6-A6.4.1, A 2 HOUR HORIZONTAL SHAFT WALL SYSTEM IS
 SHOWN AND REFERS TO DETAILS 13 AND 14 ON A10.0.1.
 DETAIL 14 SPECS "1 HOUR RATED SHAFTWALL ASSEMBLIES".
 SHAFT IS TO BE 2 HOUR, A HORIZONTAL ASSEMBLY IS TO BE
 SPECIFIED RATHER THAN A WALL ASSEMBLY. PROVIDE LISTING
 WHICH ADDRESSES USE OF U415 UTILIZED IN A HORIZONTAL
 ORIENTATION OR REVISE DETAIL.
  
 DETAIL TO COMPLY WITH FBC B 717.3.1, 713.4, 703.2.1
 (ALSO 713.14, 909.21.3 IF APPLICABLE).
  
 3. FBC B 403.4, 907.2.13.1, 907.3.3, 907.3.4, AUTOMATIC
 SMOKE DETECTION TO BE IN ACCORDANCE WITH THIS SECTION.
 FIRE ALARM IS UNDER A SEPARATE PERMIT; PLANS ARE TO
 COMPLY WITH OR CLARIFY THE FOLLOWING:
  
 SHEET FA1.0.0, THE FIRE ALARM LEGEND AND OTHER TEXT ON
 THE PAGE ARE TOO LIGHT TO BE LEGIBLE.
 SHEET FA1.1.1A, FBC B 970.2.13.1.1(1), A SMOKE DETECTOR
 IS REQUIRED IN THE TRANSFORMER VAULT.
 THE GRAPHIC IN THE EMERGENCY SWITCH GEAR ROOM WITH TEXT
 R/F IS NOT ON THE LEGEND BUT IS SIMILAR TO THE GRAPHIC
 FOR "HEAT DETECTOR SENSOR BASE"; CLARIFY. WHAT IS R/F?
 DOES THIS DEVICE MEET THE REQUIREMENT IN FBC B
 907.2.13.1.1?
 GRAPHICS ARE NOT CLEAR. SEE FA1.3.1A, SEE STAIR #2 ON
 FIRST FLOOR (AND OTHER LOCATIONS), CLARIFY WHAT S IN A
 PLAIN SQUARE DEPICTS. ALSO CLARIFY WHY THE EXIT
 PASSAGEWAYS/EXIT CORRIDORS DO NOT HAVE ANY DEVICES; ARE
 THE EXEMPTED?
 HOW WILL THE REQUIREMENTS OF FBC B 908.7.1 BE MET?
  
 4. FBC B 403.5.3, REVISE PLAN TO SHOW COMPLIANCE.
  
 RESPONSE STATES THAT E3.0.0 FIRE COMMAND ROOM HAS A
 DOOR UNLOCKING DEVICE; PLEASE HAVE ENGINEER ADVISE AS
 TO WHERE THIS CAN BE FOUND. IT DOES NOT APPEAR TO BE
 ONE OF THE "FIRE COMMAND ROOM KEYNOTES" OR REVISE PLAN
 TO INCLUDE.
  
 5. FBC B TABLE 705.8, CLARIFY HOW <15% WAS DETERMINED
 FOR THE WALL WHICH OPENS TO ALLOW HOTEL ACCESS.
  
 RESPONSE WILL BE DISCUSSED WITH BUILDING OFFICIAL AND
 ABO. WALL PERCENTAGE CALCULATIONS ARE DONE BASED ON THE
 WALL PORTION WHICH IS AFFECTED (PORTION WHICH IS >3'
 FROM PROPERTY LINE). ON LS1.1 THE CALCULATION UTILIZES
 THE ENTIRE WALL LENGTH. IT IS POSSIBLE THAT THIS WILL
 BE PERMITTED DEPENDING ON OPENINGS ON THE ADJACENT
 PROPERTY IN THIS LOCATION. PROVIDE INFORMATION
 REGARDING OPENINGS ON THE OTHER SIDE OF THE LOT LINE.
  
 6. THIS PARCEL IS LOCATED IN A SPECIAL FLOOD HAZARD
 AREA; FLOOD MAP IN EFFECT AT TIME OF FOUNDATION PERMIT
 APPLICATION 1979 FIRMS + 1' FREEBOARD; MINIMUM
 ELEVATION = 8.0' NGVD29, PROPOSED LOWEST FINISHED FLOOR
 ELEVATION = 9.0' NGVD29
 A "CONSTRUCTION DRAWING" ELEVATION CERTIFICATE IS
 RECOMMENDED AT THIS TIME TO AVOID FUTURE DELAYS
 (CORRECTIONS, IF APPLICABLE, WILL NOT DELAY PERMIT
 ISSUANCE)
 A "BUILDING UNDER CONSTRUCTION" ELEVATION CERTIFICATE
 OR FORM BOARD SURVEY IS REQUIRED PRIOR TO CONCRETE
 POUR. THIS MAY BE SENT VIA EMAIL FOR PRELIMINARY REVIEW
 A "FINISHED CONSTRUCTION" ELEVATION CERTIFICATE IS
 REQUIRED PRIOR TO FINAL INSPECTION AND/OR CO AND/OR
 TCO.
  
 7. BARN DOORS TO MAINTAIN THE 25SF LOUVERS, A1.3.1 AND
 OTHER SHEETS UP TO 3RD FLOOR, FOR COMPLIANCE WITH FBC B
 1029.1, OK PER RB.
  
 8. DEFERRED SUBMITTALS REQUESTED BY ARCHITECT, SEE
 FOLLOWING LIST (MAY NOT BE A COMPLETE LIST); DOCUMENTS
 SHOWING COMPLIANCE ARE TO BE REVIEWED BY DESIGNER OF
 RECORD PRIOR TO SUBMITTAL (ARCHITECT OR ENGINEER FOR
 PRODUCT APPROVALS AND OTHER SPECIFICATION DOCUMENTS,
 STRUCTURAL ENGINEER OF RECORD APPROVAL AND REVIEW IS
 REQUIRED FOR DELEGATED ENGINEERING). SUBMITTAL, REVIEW
 AND APPROVAL ARE REQUIRED PRIOR TO INSTALLATION.
  
 COMPONENT & CLADDING PRODUCT APPROVALS (COMPLY WITH
 PRESSURES SHOWN ON SHEET S0.0.5)
 FBC B 2403.2, SEMI FRAMELESS SHOWER ENCLOSURE
 ENGINEERING
 GLASS GUARDS DELEGATED ENGINEERING
 BALCONY ALUMINUM GUARDRAILS DELEGATED ENGINEERING
 POOL DECK GUARDRAILS DELEGATED ENGINEERING
 ALUCOBOND, PROVIDE PRODUCT APPROVALS AND SPEC SHEETS TO
 SHOW COMPLIANCE WITH FBC B 602.2, 1
 TERRACORP, SPEC SHEETS SHOWING COMPLIANCE WITH
 REQUIREMENTS FOR NON COMBUSTIBLE BUILDINGS,
 INSTALLATION DETAILS FBC B 1609
 DECORATIVE MESH COLUMN ENCLOSURE SHOWN ON A3.1.14 AND
 OTHER SHEETS, FBC B 602.2 (NON COMBUSTIBLE), 1609
 (RESISTANCE TO WIND LOADS), PROVIDE SPEC SHEETS AND
 PRODUCT APPROVAL OR ENGINEERING TO SHOW COMPLIANCE
  
 9. FBC 1207.2, 1207.3, FIELD TESTING FOR STC/IIC WILL
 BE DONE, LVT ENVIROQUIET II (NOTE: 8" CONCRETE SLABS)
 WHISPER MAT CS IS PROPOSED BUT DOES NOT HAVE A FLAME
 SPREAD TEST FOR LVT. PLEASE CONTACT ME IN A FEW WEEKS;
 AT THIS TIME THE WHISPER MAT CS SPEC SHEET HAS BEEN
 VOIDED, BUT WE ARE CURRENTLY EVALUATING THIS AND OTHER
 UNDERLAYMENTS IN THIS APPLICATION.
  
 10. THE FOLLOWING ITEMS MAY REQUIRE A DETAIL OR SPEC
 SHEETS TO BE SUBMITTED SUBJECT TO INSPECTOR'S
 DISCRETION:
 FBC B 603, "WOOD SLATS AT ROOF FASCIA" IS SHOWN;
 PROVIDE SPEC SHEETS AT INSPECTION TO SHOW COMPLIANCE.
 FBC B 603.1 2-A8.3.3 AND OTHER LOCATIONS, IPE WOOD IS
 PROPOSED; PROVIDE SPEC SHEETS AT INSPECTION TO SHOW
 COMPLIANCE.
 FBC A FAIR HOUSING REQUIREMENT 2 ANSI 4.1-4.3.1,
 RECEPTION DESK IN RESIDENTS LOBBY TO COMPLY.
 FBC B 603.1(15), A3.1.11 AND OTHER SHEETS, KRINKLGLAS,
 SHOWN ON VARIOUS PAGES, TO COMPLY WITH CHAPTER 26
  
 11. SEPARATE PERMITS (APPLICATIONS, PLANS, AND FEES)
 ARE REQUIRED FOR:
 LIGHT POLES/SITE LIGHTING
 SWIMMING POOL
 FIRE ALARM
 FIRE SPRINKLER
 LOW VOLTAGE
 ACCESS
 LANDSCAPING
 IRRIGATION
 ALL OTHER ITEMS OTHER THAN BMEP
  
 12. PROVIDE THE RECORDED PLAT WHEN FINALIZED; EITHER A
 PDF VIA EMAIL OR ADVISE BOOK AND PAGE NUMBER VIA EMAIL.
  
 13. AIPP COMPLIANCE REQUIRED; VERIFICATION REQUIRED
 PRIOR TO C.O.
  
 14. SHORING/RESHORE ENGINEERING IS REQUIRED TO BE
 SUBMITTED TO THE BUILDING DIVISION FOR REVIEW. THE
 ENGINEERING IS TO BE SUBMITTED, REVIEWED AND ISSUED
 PRIOR TO CONCRETE POUR.
  
 15. A CONSTRUCTION GUARD RAIL ENGINEERED DETAIL IS
 REQUIRED TO BE PROVIDED PRIOR TO INSTALLATION.
  
  
  