Plan Review Notes
Plan Review Notes For Permit 17110075
Permit Number 17110075
Review Stop B
Sequence Number 3
Notes
Date Text
2018-05-27 14:54:04****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 FBC = FLORIDA BUILDING CODE, 5TH EDITION (2014)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
  
 COMMENTS FROM PREVIOUS LIST:
  
 22. GENERAL COMMENT, FBC 107, SOME FMEP COMMENTS ARE
 ALSO FBC B REQUIREMENTS. A BUILDING REVIEW ON THESE
 ITEMS WILL BE DONE UPON RESUBMITTAL.
  
 23-28. OK
  
 29. FBC 107, 6-A6.4.1, A 2 HOUR HORIZONTAL SHAFT WALL
 SYSTEM IS SHOWN AND REFERS TO DETAILS 13 AND 14 ON
 A10.0.1. DETAIL 14 SPECS "1 HOUR RATED SHAFTWALL
 ASSEMBLIES". SHAFT IS TO BE 2 HOUR, A HORIZONTAL
 ASSEMBLY IS TO BE SPECIFIED RATHER THAN A WALL
 ASSEMBLY. PROVIDE LISTING WHICH ADDRESSES USE OF U415
 UTILIZED IN A HORIZONTAL ORIENTATION OR REVISE DETAIL.
  
 3RD REVIEW, RESPONSE LETTER STATES THAT UL U497 WAS
 ADDED AND HAS HORIZONTAL ASSEMBLIES. PLEASE SEE THE
 DETAIL AT THIS WEBSITE:
  
 HTTP://DATABASE.UL.COM/CGI-BIN/XYV/TEMPLATE/LISEXT/1FRA
 ME/SHOWPAGE.HTML?NAME=BXUV.U497&CCNSHORTTITLE=FIRE-RESI
 STANCE+RATINGS+-+ANSI/UL+263&OBJID=1074330896&CFGID=107
 3741824&VERSION=VERSIONLESS&PARENT_ID=1073984818&SEQUEN
 CE=1
  
 UL U ASSEMBLIES ARE FOR WALLS (VERTICAL). I WAS UNABLE
 TO LOCATE THE ASSEMBLY WHI694-0300.2; PLEASE PROVIDE.
  
 PLEASE SEND A PROPOSED DETAIL VIA EMAIL. DETAIL TO
 COMPLY WITH FBC B 717.3.1, 713.4, 703.2.1 (ALSO 713.14,
 909.21.3 IF APPLICABLE). PLEASE CONTACT ME TO DISCUSS.
 THIS REQUIREMENT WAS CONFIRMED WITH A FBC ISSUED
 DECLARATORY STATEMENT.
  
 30-35. OK
  
 36. FBC B 403.4, 907.2.13.1, 907.3.3, 907.3.4,
 AUTOMATIC SMOKE DETECTION TO BE IN ACCORDANCE WITH THIS
 SECTION. FIRE ALARM IS UNDER A SEPARATE PERMIT WHICH IS
 NOT REVIEWED BY BUILDING. PLEASE REVISE PLAN TO NOTE
 COMPLIANCE.
  
 ARCHITECT'S RESPONSE IS THAT THEY PREFER THAT THE FIRE
 ALARM DRAWINGS ARE REVIEWED AT THIS TIME. PLEASE REVISE
 THE FOLLOWING:
  
 SHEET FA1.0.0, THE FIRE ALARM LEGEND AND OTHER TEXT ON
 THE PAGE ARE TOO LIGHT TO BE LEGIBLE.
 SHEET FA1.1.1A, FBC B 970.2.13.1.1(1), A SMOKE DETECTOR
 IS REQUIRED IN THE TRANSFORMER VAULT.
 THE GRAPHIC IN THE EMERGENCY SWITCH GEAR ROOM WITH TEXT
 R/F IS NOT ON THE LEGEND BUT IS SIMILAR TO THE GRAPHIC
 FOR "HEAT DETECTOR SENSOR BASE"; CLARIFY. WHAT IS R/F?
 DOES THIS DEVICE MEET THE REQUIREMENT IN FBC B
 907.2.13.1.1?
 GRAPHICS ARE NOT CLEAR. SEE FA1.3.1A, SEE STAIR #2 ON
 FIRST FLOOR (AND OTHER LOCATIONS), CLARIFY WHAT S IN A
 PLAIN SQUARE DEPICTS. ALSO CLARIFY WHY THE EXIT
 PASSAGEWAYS/EXIT CORRIDORS DO NOT HAVE ANY DEVICES; ARE
 THE EXEMPTED?
 HOW WILL THE REQUIREMENTS OF FBC B 908.7.1 BE MET?
  
 IT IS POSSIBLE THAT, IF FIRE PROTECTION ENGINEER
 CONTACTS ME TO ADVISE HOW THESE ISSUES WILL BE
 ADDRESSED WHEN THE FIRE ALARM PERMIT IS SUBMITTED, THIS
 CAN BE A PROVISO ITEM.
  
 37. FBC B 403.5.3, COMPLIANCE NOT CLEAR, PLEASE ADVISE
 WHERE STAIRWAY DOOR LOCKING IS ADDRESSED, OR REVISE
 PLAN TO SHOW COMPLIANCE.
  
 RESPONSE STATES THAT E3.0.0 FIRE COMMAND ROOM HAS A
 DOOR UNLOCKING DEVICE; PLEASE HAVE ENGINEER ADVISE AS
 TO WHERE THIS CAN BE FOUND. IT DOES NOT APPEAR TO BE
 ONE OF THE "FIRE COMMAND ROOM KEYNOTES".
  
 RESPONSE LETTER ALSO STATES THAT ACCESS CONTROL
 DRAWINGS 840-849 INDICATE WHICH DOORS AND THE CONTROLS
 FOR THESE DOORS TO LOCK AND UNLOCK. THESE PAGES ARE NOT
 DESIGNED BY AN ARCHITECT OR ENGINEER AND CANNOT BE USED
 TO DEMONSTRATE CODE COMPLIANCE. ALL DOORS ARE REQUIRED
 TO RELEASE.
  
 IT IS POSSIBLE THAT, IF FIRE PROTECTION ENGINEER
 CONTACTS ME TO CLARIFY, THIS CAN BE A PROVISO ITEM.
  
 38. FBC B TABLE 705.8, CLARIFY HOW <15% WAS DETERMINED
 FOR THE WALL WHICH OPENS TO ALLOW HOTEL ACCESS.
  
 3RD REVIEW; RESPONSE WILL BE DISCUSSED WITH BUILDING
 OFFICIAL AND ABO. WALL PERCENTAGE CALCULATIONS ARE DONE
 BASED ON THE WALL PORTION WHICH IS AFFECTED (PORTION
 WHICH IS >3' FROM PROPERTY LINE). ON LS1.1 THE
 CALCULATION UTILIZES THE ENTIRE WALL LENGTH. IT IS
 POSSIBLE THAT THIS WILL BE PERMITTED DEPENDING ON
 OPENINGS ON THE ADJACENT PROPERTY IN THIS LOCATION. IF
 READILY AVAILABLE, PROVIDE THIS INFORMATION VIA EMAIL.
 IF NOT READILY AVAILABLE TO ARCHITECT, I CAN GET IT
 FROM THE HOTEL PERMIT DOCUMENTS.
  
 39-40. OK
  
 41. REGARDING THRESHOLD STATEMENT, RESPONSE IS THAT
 THIS IS ON EVERY STRUCTURAL PAGE. I APOLOGIZE FOR THE
 COMMENT NOT BEING CLEAR; I CANNOT LOCATE THIS STATEMENT
 ON THE ARCHITECTURAL PLANS. STATUTE STATES:
  
 W.P.B. AMENDMENT 110.3.7.4.4, FS553.79(7)(D): ALL PLANS
 FOR THE BUILDING WHICH ARE REQUIRED TO BE SIGNED AND
 SEALED BY THE ARCHITECT OR ENGINEER OF RECORD CONTAIN A
 STATEMENT THAT, TO THE BEST OF THE ARCHITECT'S OR
 ENGINEER'S KNOWLEDGE, THE PLANS AND SPECIFICATIONS
 COMPLY WITH THE APPLICABLE MINIMUM BUILDING CODES AND
 THE APPLICABLE FIRESAFETY STANDARDS AS DETERMINED BY
 THE LOCAL AUTHORITY IN ACCORDANCE WITH THIS CHAPTER AND
 CHAPTER 633.
  
 IF YOU ARE OF THE OPINION THAT THE ARCHITECT IS NOT
 REQUIRED TO INCLUDE THE THRESHOLD STATEMENT, PLEASE
 ADVISE AND I'LL DO FURTHER RESEARCH. ALL THRESHOLD
 BUILDINGS THAT I'VE REVIEWED HAVE INCLUDED THE
 STATEMENT BY BOTH ARCHITECT AND ENGINEER, EITHER ON ALL
 PAGES OR ON ONE PAGE.
  
 42. THIS PERMIT WILL BE ISSUED WITH THE FOLLOWING
 PROVISOS:
  
 A. THIS PARCEL IS LOCATED IN A SPECIAL FLOOD HAZARD
 AREA; FLOOD MAP IN EFFECT AT TIME OF FOUNDATION PERMIT
 APPLICATION 1979 FIRMS + 1' FREEBOARD; MINIMUM
 ELEVATION = 8.0' NGVD29, PROPOSED LOWEST FINISHED FLOOR
 ELEVATION = 9.0' NGVD29
 A "CONSTRUCTION DRAWING" ELEVATION CERTIFICATE IS
 RECOMMENDED AT THIS TIME TO AVOID FUTURE DELAYS
 (CORRECTIONS, IF APPLICABLE, WILL NOT DELAY PERMIT
 ISSUANCE)
 A "BUILDING UNDER CONSTRUCTION" ELEVATION CERTIFICATE
 OR FORM BOARD SURVEY IS REQUIRED PRIOR TO CONCRETE
 POUR. THIS MAY BE SENT VIA EMAIL FOR PRELIMINARY REVIEW
 A "FINISHED CONSTRUCTION" ELEVATION CERTIFICATE IS
 REQUIRED PRIOR TO FINAL INSPECTION AND/OR CO AND/OR
 TCO.
  
 B. BARN DOORS TO MAINTAIN THE 25SF LOUVERS, A1.3.1 AND
 OTHER SHEETS UP TO 3RD FLOOR, FOR COMPLIANCE WITH FBC B
 1029.1, OK PER RB.
  
 C. DEFERRED SUBMITTALS REQUESTED BY ARCHITECT, SEE
 FOLLOWING LIST (MAY NOT BE A COMPLETE LIST); DOCUMENTS
 SHOWING COMPLIANCE ARE TO BE REVIEWED BY DESIGNER OF
 RECORD PRIOR TO SUBMITTAL (ARCHITECT OR ENGINEER FOR
 PRODUCT APPROVALS AND OTHER SPECIFICATION DOCUMENTS,
 STRUCTURAL ENGINEER OF RECORD APPROVAL AND REVIEW IS
 REQUIRED FOR DELEGATED ENGINEERING). SUBMITTAL, REVIEW
 AND APPROVAL ARE REQUIRED PRIOR TO INSTALLATION.
  
 COMPONENT & CLADDING PRODUCT APPROVALS (COMPLY WITH
 PRESSURES SHOWN ON SHEET S0.0.5)
 FBC B 2403.2, SEMI FRAMELESS SHOWER ENCLOSURE
 ENGINEERING
 GLASS GUARDS DELEGATED ENGINEERING
 BALCONY ALUMINUM GUARDRAILS DELEGATED ENGINEERING
 POOL DECK GUARDRAILS DELEGATED ENGINEERING
 ALUCOBOND, PROVIDE PRODUCT APPROVALS AND SPEC SHEETS TO
 SHOW COMPLIANCE WITH FBC B 602.2, 1
 TERRACORP, SPEC SHEETS SHOWING COMPLIANCE WITH
 REQUIREMENTS FOR NON COMBUSTIBLE BUILDINGS,
 INSTALLATION DETAILS FBC B 1609
 DECORATIVE MESH COLUMN ENCLOSURE SHOWN ON A3.1.14 AND
 OTHER SHEETS, FBC B 602.2 (NON COMBUSTIBLE), 1609
 (RESISTANCE TO WIND LOADS), PROVIDE SPEC SHEETS AND
 PRODUCT APPROVAL OR ENGINEERING TO SHOW COMPLIANCE
  
 D. FBC 1207.2, 1207.3, FIELD TESTING FOR STC/IIC WILL
 BE DONE, LVT ENVIROQUIET II (NOTE: 8" CONCRETE SLABS)
 WHISPER MAT CS IS PROPOSED BUT DOES NOT HAVE A FLAME
 SPREAD TEST FOR LVT. PLEASE CONTACT ME IN A FEW WEEKS;
 AT THIS TIME THE WHISPER MAT CS SPEC SHEET HAS BEEN
 VOIDED, BUT WE ARE CURRENTLY EVALUATING THIS AND OTHER
 UNDERLAYMENTS IN THIS APPLICATION.
  
 E. THE FOLLOWING ITEMS MAY REQUIRE A DETAIL OR SPEC
 SHEETS TO BE SUBMITTED SUBJECT TO INSPECTOR'S
 DISCRETION:
 FBC B 603, "WOOD SLATS AT ROOF FASCIA" IS SHOWN;
 PROVIDE SPEC SHEETS AT INSPECTION TO SHOW COMPLIANCE.
 FBC B 603.1 2-A8.3.3 AND OTHER LOCATIONS, IPE WOOD IS
 PROPOSED; PROVIDE SPEC SHEETS AT INSPECTION TO SHOW
 COMPLIANCE.
 FBC A FAIR HOUSING REQUIREMENT 2 ANSI 4.1-4.3.1,
 RECEPTION DESK IN RESIDENTS LOBBY TO COMPLY.
 FBC B 603.1(15), A3.1.11 AND OTHER SHEETS, KRINKLGLAS,
 SHOWN ON VARIOUS PAGES, TO COMPLY WITH CHAPTER 26
  
 F. SEPARATE PERMITS (APPLICATIONS, PLANS, AND FEES) ARE
 REQUIRED FOR:
 LIGHT POLES/SITE LIGHTING
 SWIMMING POOL
 FIRE ALARM
 FIRE SPRINKLER
 LOW VOLTAGE
 ACCESS
 LANDSCAPING
 IRRIGATION
 ALL OTHER ITEMS OTHER THAN BMEP
  
 G. PROVIDE THE RECORDED PLAT WHEN FINALIZED; EITHER A
 PDF VIA EMAIL OR ADVISE BOOK AND PAGE NUMBER VIA EMAIL.
  
 H. AIPP COMPLIANCE REQUIRED; VERIFICATION REQUIRED
 PRIOR TO C.O.
  
 I. SHORING/RESHORE ENGINEERING IS REQUIRED TO BE
 SUBMITTED TO THE BUILDING DIVISION FOR REVIEW. THE
 ENGINEERING IS TO BE SUBMITTED, REVIEWED AND ISSUED
 PRIOR TO CONCRETE POUR.
  
 J. A CONSTRUCTION GUARD RAIL ENGINEERED DETAIL IS
 REQUIRED TO BE PROVIDED PRIOR TO INSTALLATION.
  
  
  