Plan Review Notes
Plan Review Notes For Permit 17110075
Permit Number 17110075
Review Stop B
Sequence Number 2
Notes
Date Text
2018-03-17 13:54:48****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 FBC = FLORIDA BUILDING CODE, 5TH EDITION (2014)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
  
 PLEASE NOTE THAT THERE IS A DISCREPANCY BETWEEN THE 1ST
 REVIEW IN EGOV PLUS AND THE RESPONSE LETTER. THEREFORE,
 IT APPEARS THAT SOME COMMENTS WERE NOT ADDRESSED. IN
 THE FUTURE, ESPECIALLY FOR LARGE PROJECTS, PLEASE NOTE
 THE TOP OF THE REVIEW WHICH WILL INDICATE IF IT IS
 "REVIEW IN PROGRESS". IF THAT LANGUAGE IS AT THE TOP OF
 THE REVIEW, THE REVIEW IS IN PROGRESS AND IS CHANGING.
 THIS IS DONE FOR TIME SENSITIVE PROJECTS WHEN IT IS NOT
 POSSIBLE TO GET THE REVIEW DONE IN ONE REVIEW SESSION.
 I APOLOGIZE FOR ANY INCONVENIENCE; PLEASE FEEL FREE TO
 CALL ME IF YOU WISH TO DISCUSS.
  
 1-8. OK
  
 COMMENTS FROM PREVIOUS LIST:
  
 9. A1.1,1, FBC 107, IT IS NOT CLEAR WHICH PARKING
 SPACES ARE DEDICATED TO THE RETAIL, HOTEL, AND WHICH
 ARE FOR RESIDENTS (ACCESSIBILITY VS FAIR HOUSING),
 REVISE PLAN TO SHOW COMPLIANCE.
  
 2ND REVIEW, PLEASE PROVIDE A TABLE WHICH STATES NUMBER
 OF ACCESSIBLE SPACES, VAN ACCESSIBLE, TOTAL SPACES, FOR
 THE RETAIL, HOTEL, AND RESIDENTS, OR ADVISE WHERE THIS
 INFORMATION CAN BE LOCATED. SEE FBC A 208.2, FBC A FAIR
 HOUSING.
  
 11-13. OK
  
 14. A3.1.13 AND OTHER SHEETS, FBC B 602.2, TERRACORP
 PROPOSED, PROVIDE SPEC SHEETS SHOWING COMPLIANCE. THIS
 MAY BE A PROVISO ITEM UPON REQUEST.
  
 15. A3.1.14 AND OTHER SHEETS, FBC B 602.2, 1609,
 DECORATIVE MESH COLUMN ENCLOSURE PROPOSED, PROVIDE SPEC
 SHEETS AND PRODUCT APPROVAL OR ENGINEERING TO SHOW
 COMPLIANCE. THIS MAY BE A PROVISO ITEM UPON REQUEST.
  
 16-17. OK
  
 18. FLOORING UNDERLAYMENT TO COMPLY WITH THE FOLLOWING:
  
 A. FBC 1207.2, STC - 2ND REVIEW, THE TEST REPORT
 PROVIDED IS FOR TILE, LVT PROPOSED. EITHER PROVIDE A
 COPY OF A TEST REPORT FOR LVT OR PROVIDE A COMPARATIVE
 ANALYSIS (CAN BE IN THE FORM OF A LETTER) WHICH
 DEMONSTRATES THAT PROPOSED INSTALLATION COMPLIES WITH
 THE REQUIREMENT OF STC OF AT LEAST 50.
  
 B. FBC 1207.3, IIC - 2ND REVIEW, THE TEST REPORT
 PROVIDED IS FOR TILE, LVT PROPOSED. EITHER PROVIDE A
 COPY OF A TEST REPORT FOR LVT OR PROVIDE A COMPARATIVE
 ANALYSIS (CAN BE IN THE FORM OF A LETTER) WHICH
 DEMONSTRATES THAT PROPOSED INSTALLATION COMPLIES WITH
 THE REQUIREMENT OF IIC OF AT LEAST 50.
  
 C. FBC 603.1, ALLOWABLE MATERIALS IN NON COMBUSTIBLE
 BUILDINGS, SEE ITEM 2, EXCEPTION 2, ACOUSTICAL
 INSULATION INSTALLED BETWEEN A FINISHED FLOOR AND SOLID
 DECKING WITHOUT INTERVENING AIRSPACE SHALL BE ALLOWED
 TO HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 200. SEE
 803.1.1, PROVIDE TEST DATA IN ACCORDANCE WITH ASTM E 84
 OR UL 723.
  
 2ND REVIEW, NOT PROVIDED. WE HAVE ON FILE A COPY OF A
 REPORT FOR ASTM E 84 FOR WHISPER MAT WITH TILE
 FLOORING, BUT WE DO NOT HAVE A REPORT FOR WHISPER MAT
 WITH LVT.
  
 UPON REQUEST, THIS CAN BE A PROVISO ITEM - TEST REPORTS
 ARE REQUIRED TO BE SUBMITTED, REVIEWED AND APPROVED
 PRIOR TO INSTALLATION. TO MY KNOWLEDGE THERE ARE AT
 THIS TIME ONLY TWO PRODUCTS WHICH HAVE FLAME SPREAD
 TEST WITHOUT TILE. IT IS POSSIBLE THAT THE PRODUCT
 PROPOSED DOES NOT HAVE A FLAME SPREAD TEST FOR
 COMBUSTIBLE FLOORING. DUE TO THE RESTRICTIVE NATURE OF
 THE PROVISO, IT IS RECOMMENDED THAT APPLICANT RESOLVE
 THIS ISSUE AT THIS TIME. IF A PROVISO IS REQUESTED,
 PLEASE ADVISE AS TO WHEN THE ITEM WILL BE ADDRESSED.
  
 IF A PROVISO IS REQUESTED, THE SPEC SHEETS SUBMITTED
 FOR WHISPER MAT CS SHOULD BE REMOVED BY APPLICANT. IF
 THAT IS NOT POSSIBLE, THEY WILL BE MARKED "VOID".
  
 19-22. OK
  
 22. GENERAL COMMENT, FBC 107, SOME FMEP COMMENTS ARE
 ALSO FBC B REQUIREMENTS. A BUILDING REVIEW ON THESE
 ITEMS WILL BE DONE UPON RESUBMITTAL.
  
 23-26. OK
  
 2ND REVIEW, RESPONSE LETTER DOES NOT ADDRESS THE
 FOLLOWING ITEMS AND PLANS NOT REVISED. IT APPEARS THAT
 "PLAN REVIEW IN PROGRESS" WERE UTILIZED AS FINAL
 BUILDING COMMENTS. PLEASE NOTE THAT SOME REVIEWERS,
 ESPECIALLY IF UNABLE TO COMPLETE A PLAN REVIEW IN A ONE
 OR TWO DAY SESSION, WILL UPDATE COMMENTS PERIODICALLY
 AND USE THIS LANGUAGE, USUALLY AT THE TOP OF THE
 REVIEW. MY APOLOGIES . . .
  
 27. FBC 107, A3.1.11 AND OTHER SHEETS, ALUMINUM MESH IS
 SHOWN OVER THE GARAGE ALUMINUM AIR INTAKE LOUVER. DOES
 THIS INHIBIT AIR FLOW?
  
 28. FBC B 603, "WOOD SLATS AT ROOF FASCIA" IS SHOWN; IT
 IS NOT CLEAR UNDER WHICH EXEMPTION THIS IS PROPOSED,
 REVISE PLAN TO CLARIFY.
  
 29. FBC 107, 6-A6.4.1, A 2 HOUR HORIZONTAL SHAFT WALL
 SYSTEM IS SHOWN AND REFERS TO DETAILS 13 AND 14 ON
 A10.0.1. DETAIL 14 SPECS "1 HOUR RATED SHAFTWALL
 ASSEMBLIES". SHAFT IS TO BE 2 HOUR, A HORIZONTAL
 ASSEMBLY IS TO BE SPECIFIED RATHER THAN A WALL
 ASSEMBLY. PROVIDE LISTING WHICH ADDRESSES USE OF U415
 UTILIZED IN A HORIZONTAL ORIENTATION OR REVISE DETAIL.
  
 30. FBC B 1007, FBC A 207.1, GENERAL NOTE, REVISE PLAN
 TO STATE WHICH OF THE TWO OPTIONS IS ELECTED FOR
 ACCESSIBLE MEANS OF EGRESS (APPLICABLE TO ADA PORTION
 OF PROJECT ONLY).
  
 31. FBC B 716, A1.1.1C AND A7.0.1, DOOR 105A IS IN A
 RATED WALL BUT LACKS FIRE RESISTANCE RATING, PLEASE
 REVISE OR CLARIFY.
  
 32. FBC B 603, 2-A8.3.3 AND OTHER LOCATIONS, IPE WOOD
 IS PROPOSED. IT IS NOT CLEAR UNDER WHICH EXEMPTION THIS
 IS PROPOSED, REVISE PLAN TO CLARIFY.
  
 33. FBC B 1008.1.10, A7.0.1, A1.5.1B AND OTHER SHEETS,
 DOORS SERVING A SPACE OF ASSEMBLY OCCUPANCY WITH AN
 OCCUPANT LOAD OF 50 OR MORE ARE TO BE PROVIDED WITH
 PANIC OR FIRE EXIT HARDWARE. SEE DOOR 542A, 112B, CHECK
 ALL. IT APPEARS THAT MEANS OF EGRESS FROM STAIRS 1, 2,
 AND 4 TO EXIT DISCHARGE SHOULD HAVE PANIC DEVICES.
 (THIS APPEARS TO BE DESIGNER'S INTENT AS MOST COMPLY.)
  
 34. FBC B 501.2, ADDRESS IDENTIFICATION REQUIRED,
 PLEASE REVISE PLAN OR ADVISE WHERE THIS CAN BE LOCATED.
  
 35. FBC B 505.2.1 EXCEPTION 2, FBC 403.4.4, COMPLIANCE
 IS NOT CLEAR; PLEASE ADVISE WHERE COMPLIANCE WITH FBC B
 907.5.2.2 (VOICE/ALARM SYSTEMS) CAN BE FOUND, OR REVISE
 PLAN TO SHOW COMPLIANCE. PLEASE CONTACT ME IF YOU WISH
 TO DISCUSS.
  
 36. FBC B 403.4, 907.2.13.1, 907.3.3, 907.3.4,
 AUTOMATIC SMOKE DETECTION TO BE IN ACCORDANCE WITH THIS
 SECTION. FIRE ALARM IS UNDER A SEPARATE PERMIT WHICH IS
 NOT REVIEWED BY BUILDING. PLEASE REVISE PLAN TO NOTE
 COMPLIANCE.
  
 37. FBC B 403.5.3, COMPLIANCE NOT CLEAR, PLEASE ADVISE
 WHERE STAIRWAY DOOR LOCKING IS ADDRESSED, OR REVISE
 PLAN TO SHOW COMPLIANCE.
  
 38. FBC B TABLE 705.8, CLARIFY HOW <15% WAS DETERMINED
 FOR THE WALL WHICH OPENS TO ALLOW HOTEL ACCESS.
  
 39. FBC B 1603.1.4, I WAS UNABLE TO LOCATE WIND DESIGN
 CRITERIA, PLEASE ADVISE WHERE THIS CAN BE LOCATED OR
 REVISE TO INCLUDE. NOTE THAT VULT AND VASD ARE
 REQUIRED.
  
 40. FBC B 1207, I WAS UNABLE TO LOCATE SLAB THICKNESS
 BETWEEN UNITS, ADVISE WHERE THIS CAN BE FOUND OR REVISE
 PLAN TO PROVIDE (TYPICALLY ON THE STRUCTURAL SHEETS).
 THIS INFORMATION IS REQUIRED FOR REVIEW OF THE FLOORING
 UNDERLAYMENT.
  
 2ND REVIEW, RESPONSE LETTER STATES THAT THE SLAB IS 8",
 PLEASE ADVISE WHERE THIS CAN BE FOUND ON THE PLAN.
  
 41. THRESHOLD REVIEW MUST BE ADDRESSED PRIOR TO PERMIT
 ISSUANCE. THRESHOLD STATEMENT ON THE PLAN IS REQUIRED
 PRIOR TO A BUILDING PASS REVIEW. THE SI AGREEMENT AND
 RESUMES MAY BE SENT AT ANY TIME VIA EMAIL. PLEASE
 PROVIDE AS A COMPLETE PACKAGE (ALL SIGNATURES, ALL
 RESUMES).
  
 2ND REVIEW, THE THRESHOLD STATEMENT WAS ADDED TO ALL
 PLANS ON THE FOUNDATION PERMIT. WERE THE BUILDING PLANS
 ALSO UPDATED? PLEASE ADVISE WHERE THIS INFORMATION CAN
 BE LOCATED. PLEASE CONFIRM THAT BUILDING PLANS
 (17110075) ARE THE SAME AS ISSUED FOUNDATION PERMIT SO
 THERE ARE NO DISCREPANCIES.
  
 42. FBC A FAIR HOUSING REQUIREMENT 2 ANSI 4.1-4.3.1,
 RECEPTION DESK IN RESIDENTS LOBBY, PROVIDE A DETAIL OR
 REQUEST THAT THIS BE A DEFERRED SUBMITTAL.
  
 43-44. OK
  
 45. THE DOCUMENT IN THE "EXPEDITE EMAIL" IS AN EMAIL
 FROM OWNER TO OUR DEPARTMENT. PLEASE REPLACE WITH
 DOCUMENT FROM INDIVIDUAL WHO IS AUTHORIZING EXPEDITED
 REVIEW WITH NO FEE, FBC 107.
  
 46. OK
  
 47. A "CONSTRUCTION DRAWING" ELEVATION CERTIFICATE IS
 RECOMMENDED AT THIS TIME TO AVOID CONCRETE POUR DELAYS
 A "BUILDING UNDER CONSTRUCTION" ELEVATION CERTIFICATE
 OR FORM BOARD SURVEY IS REQUIRED PRIOR TO CONCRETE
 POUR. THIS MAY BE SENT VIA EMAIL FOR PRELIMINARY REVIEW
 A "FINISHED CONSTRUCTION" ELEVATION CERTIFICATE IS
 REQUIRED PRIOR TO FINAL INSPECTION AND/OR C.O. AND/OR
 T.C.O.
  
 48. OK
  
 49. FBC B 603.1(15), A3.1.11 AND OTHER SHEETS,
 KRINKLGLAS, SHOWN ON VARIOUS PAGES, TO COMPLY WITH
 CHAPTER 26, SPEC SHEETS OR TEST REPORTS TO BE SUBMITTED
 PRIOR TO INSTALLATION.
  
 50. THIS PARCEL APPEARS TO BE LOCATED IN A SPECIAL
 FLOOD HAZARD AREA:
 A "CONSTRUCTION DRAWING" ELEVATION CERTIFICATE IS
 RECOMMENDED AT THIS TIME TO AVOID FUTURE DELAYS
 (CORRECTIONS, IF APPLICABLE, WILL NOT DELAY PERMIT
 ISSUANCE)
 A "BUILDING UNDER CONSTRUCTION" ELEVATION CERTIFICATE
 OR FORM BOARD SURVEY IS REQUIRED PRIOR TO CONCRETE
 POUR. THIS MAY BE SENT VIA EMAIL FOR PRELIMINARY REVIEW
 A "FINISHED CONSTRUCTION" ELEVATION CERTIFICATE IS
 REQUIRED PRIOR TO FINAL INSPECTION AND/OR CO AND/OR
 TCO.
  
 51. FBC B 2403.2, A9.5.3 AND OTHER SHEETS, A SEMI
 FRAMELESS SHOWER ENCLOSURE IS SHOWN. ENGINEERING MAY BE
 REQUIRED SUBJECT TO FIELD INSPECTOR'S DISCRETION.
  
 52. THIS PERMIT WILL BE ISSUED WITH THE FOLLOWING
 PROVISOS:
  
 A. BARN DOORS TO MAINTAIN THE 25SF LOUVERS, A1.3.1 AND
 OTHER SHEETS UP TO 3RD FLOOR, FOR COMPLIANCE WITH FBC B
 1029.1, OK PER RB.
 B. FLOOD MAP IN EFFECT AT TIME OF FOUNDATION PERMIT
 APPLICATION 1979 FIRMS + 1' FREEBOARD
 MINIMUM ELEVATION = 8.0' NGVD29
 PROPOSED LOWEST FINISHED FLOOR ELEVATION = 9.0' NGVD29
 C. SEPARATE PERMITS (APPLICATIONS, PLANS, AND FEES)
 REQUIRED FOR POOL, FIRE ALARM, FIRE SPRINKLER, LOW
 VOLTAGE, SIGNAGE, LANDSCAPING, ETC (EVERYTHING EXCEPT
 FOR BUILDING, MEP) FBC 107.
 D. DEFERRED SUBMITTALS REQUESTED BY ARCHITECT, SEE
 FOLLOWING LIST (MAY NOT BE A COMPLETE LIST); DOCUMENTS
 SHOWING COMPLIANCE ARE TO BE REVIEWED BY DESIGNER OF
 RECORD PRIOR TO SUBMITTAL (ARCHITECT OR ENGINEER FOR
 PRODUCT APPROVALS AND OTHER SPECIFICATION DOCUMENTS,
 STRUCTURAL ENGINEER OF RECORD APPROVAL AND REVIEW IS
 REQUIRED FOR DELEGATED ENGINEERING). SUBMITTAL, REVIEW
 AND APPROVAL ARE REQUIRED PRIOR TO INSTALLATION.
 COMPONENT & CLADDING PRODUCT APPROVALS (COMPLY WITH
 PRESSURES SHOWN ON SHEET S0.0.5)
 GLASS GUARDS DELEGATED ENGINEERING
 BALCONY ALUMINUM GUARDRAILS DELEGATED ENGINEERING
 POOL DECK GUARDRAILS DELEGATED ENGINEERING
 ALUCOBOND, PROVIDE PRODUCT APPROVALS AND SPEC SHEETS TO
 SHOW COMPLIANCE WITH FBC B 602.2, 1
 E. A PRECONSTRUCTION MEETING IS REQUIRED BETWEEN KEN
 CONRAD, CHIEF BUILDING INSPECTOR, CONTRACTOR, AND SI
 PRIOR TO COMMENCEMENT.
  
 NEW COMMENT:
  
 53. A SURVEY WAS PROVIDED. IS THIS A FINALIZED RECORDED
 PLAT, OR IS THE PLAT PENDING? IF PENDING, A RECORDED
 PLAT IS REQUIRED FOR ALL 6 PERMITS PRIOR TO ISSUANCE OF
 CO. THIS PROVISO WILL BE ADDED TO ALL AFFECTED PERMITS.
 IF THE PLAT IS FINALIZED, PLEASE PROVIDE A COPY OF THE
 RECORDED PLAT.
  