Plan Review Notes
Plan Review Notes For Permit 17110075
Permit Number 17110075
Review Stop B
Sequence Number 1
Notes
Date Text
2017-12-20 06:32:02****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 FBC = FLORIDA BUILDING CODE, 5TH EDITION (2014)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
  
  
 1. SP1.0, FBC B TABLE 602, COMPLIANCE NOT CLEAR; REVISE
 PLAN TO SHOW DISTANCE TO STREET CENTERLINE. ONLY
 DISTANCE TO PROPERTY LINE IS SHOWN.
  
 2. LS1.1, EXIT STRATEGY NOT CLEAR FROM CORRIDOR 113
 THOUGH 103 RETAIL. SEE FBC B 1014.2. AS BUILDOUT FOR
 RETAIL HAS NOT BEEN ESTABLISHED AT THIS TIME, IT DOES
 NOT APPEAR POSSIBLE TO KNOW IF THIS AREA WILL BE FUTURE
 STORAGE FOR THE RETAIL. ALSO CORRIOR APPEARS TO SERVE
 OCCUPANTS UNRELATED TO THE RETAIL, SO DOES NOT APPEAR
 TO BE ACCESSORY TO ONE ANOTHER.
  
 3. LS1.1, EXIT LIGHT TO THE NORTH OF OLIVE RETAIL 103
 NORTHWEST CORNER, EXIT LIGHT POINTS NORTH. ANOTHER EXIT
 LIGHT POINTS LEFT, NOT CLEAR WHERE THAT DIRECTS THE
 OCCUPANT, FBC 107.
  
 4. LS3.1, SHAFT WALL BETWEEN ST3 E03 AND 312 NOT CLEAR;
 2 HOUR WALL NOT CLEAR BETWEEN STAIR, ELEVATOR, AND
 LOBBY.
  
 5. A1.1.1, FBC A 405.2, RAMP APPEARS TO EXCEED 1:12
 (8%) SLOPE (BUT SHEET A1.1.1A SHOWS THIS RAMP AS 1:12),
 REVISE AND CHECK ALL.
  
 6. A1.1.1, FBC A 405.6, REVISE PLAN TO SHOW RAMP RUNS,
 OR REVISE TO INDICATE RISE FOR EACH RUN, OR PROVIDE
 SEPARATE DETAIL.
  
 7. A1.1.2C, FBC A 405.7, REVISE PLAN TO SHOW LANDING
 DIMENSIONS. COMPLIANCE AT TOP OF RAMP (9A, 8.1A) IS NOT
 CLEAR, APPEARS TO HAVE TWO CHANGES OF DIRECTION.
  
 8. A1.1.1, FBC A 405.9, REVISE PLAN TO SHOW EDGE
 PROTECTION PROPOSED.
  
 9. A1.1,1, FBC 107, IT IS NOT CLEAR WHICH PARKING
 SPACES ARE DEDICATED TO THE RETAIL, HOTEL, AND WHICH
 ARE FOR RESIDENTS (ACCESSIBILITY VS FAIR HOUSING),
 REVISE PLAN TO SHOW COMPLIANCE.
  
 10. A1.1.1, FBC 107, ACCESSIBLE PARKING SPACES ON THE
 EAST PORTION OF PARKING, IT APPEARS THAT THIS PORTION
 OF THE GARAGE IS TO SERVE THE HOTEL. REVISE PLAN TO
 CLARIFY AND IF NOT, CLARIFY ACCESSIBLE ROUTE AS IT DOES
 NOT APPEAR TO LEAD ANYWHERE IN THIS BUILDING. ALSO
 REVISE PLAN TO NOTE NUMBER OF PARKING SPACES DEDICATED
 TO HOTEL, NUMBER OF ACCESSIBLE SPACES, NUMBER OF VAN
 ACCESSIBLE (2 SHOWN).
  
 11. A1.1.1, FBC A 208.2.4, INDICATE VAN PARKING FOR
 RETAIL SPACES. NOTE HEIGHT REQUIREMENT ON THE PLAN, OR
 PROVIDE A DETAIL.
  
 12. A1.1.2C, FBC A 405.5, 9A, RAMP APPEARS TO BE SHOWN
 AS 3'4 3/8" WIDE, 36" REQUIRED, REVISE TO CLARIFY.
  
 13. A1.2.1C AND OTHER SHEETS, FBC B 602.2, 1403.5,
 ALUCOBOND PROPOSED, PROVIDE SPEC SHEETS SHOWING
 COMPLIANCE. THIS MAY BE A PROVISO ITEM UPON REQUEST.
  
 14. A3.1.13 AND OTHER SHEETS, FBC B 602.2, TERRACORP
 PROPOSED, PROVIDE SPEC SHEETS SHOWING COMPLIANCE. THIS
 MAY BE A PROVISO ITEM UPON REQUEST.
  
 15. A3.1.14 AND OTHER SHEETS, FBC B 602.2, 1609,
 DECORATIVE MESH COLUMN ENCLOSURE PROPOSED, PROVIDE SPEC
 SHEETS AND PRODUCT APPROVAL OR ENGINEERING TO SHOW
 COMPLIANCE. THIS MAY BE A PROVISO ITEM UPON REQUEST.
  
 16. A1.3.1 AND OTHER SHEETS UP TO 3RD FLOOR, FBC B
 1029.1, SLIDING BARN DOORS ARE SHOWN ON SOME BEDROOMS
 WHICH DO NOT HAVE A WINDOW. I RECALL AN EMAIL ABOUT
 THIS ISSUE; WAS AN OFFICIAL RESPONSE PROVIDED AT THAT
 TIME? IF YES, PROVIDE EMAIL. IF NOT, PLEASE SEND
 RATIONALE VIA EMAIL. THIS IS TO BE RESOLVED PRIOR TO
 RESUBMITTAL.
  
 17. A1.5.1, FBC 107, CORRIDOR LABELED WITH ??, REVISE
 (NEAR E11).
  
 18. FLOORING UNDERLAYMENT TO COMPLY WITH THE FOLLOWING:
  
 A. FBC 1207.2, FLOOR/CEILING ASSEMBLIES SEPARATING
 DWELLING UNITS FROM EACH OTHER OR FROM PUBLIC OR
 SERVICE AREAS SHALL HAVE A SOUND TRANSMISSION CLASS
 (STC) OF NOT LESS THAN 50 (45 IF FIELD TESTED) FOR AIR
 BORNE NOISE WHEN TESTED IN ACCORDANCE WITH ASTM E 90.
 THE TEST REPORT CANNOT INCLUDE A DROPPED GYPSUM
 CEILING. PROVIDE A COPY OF THE TEST REPORT.
  
 B. FBC 1207.3, FLOOR/CEILING ASSEMBLIES BETWEEN
 DWELLING UNITS OR BETWEEN A DWELLING UNIT AND A PUBLIC
 OR SERVICE AREA WITHIN THE STRUCTURE SHALL HAVE AN
 IMPACT INSULATION CLASS (IIC) RATING OF NOT LESS THAN
 50 (45 IF FIELD TESTED) WHEN TESTED IN ACCORDANCE WITH
 ASTM E 492. THE TEST REPORT CANNOT INCLUDE A DROPPED
 GYPSUM CEILING. PROVIDE A COPY OF THE TEST REPORT.
  
 C. FBC 603.1, ALLOWABLE MATERIALS IN NON COMBUSTIBLE
 BUILDINGS, SEE ITEM 2, EXCEPTION 2, ACOUSTICAL
 INSULATION INSTALLED BETWEEN A FINISHED FLOOR AND SOLID
 DECKING WITHOUT INTERVENING AIRSPACE SHALL BE ALLOWED
 TO HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 200. SEE
 803.1.1, PROVIDE TEST DATA IN ACCORDANCE WITH ASTM E 84
 OR UL 723.
  
 SUBMITTAL OF THE SPEC SHEETS AND TEST REPORTS MAY BE A
 DEFERRED SUBMITTAL UPON REQUEST.
  
 19. FBC A FAIR HOUSING, ANSI 117.1 4.3, SOME DOORS DO
 NOT APPEAR TO COMPLY WITH DOORS IN A SERIES
 REQUIREMENT, 1ST FLOOR SOUTH OF ELEV #3, 5TH FLOOR AT
 STAIR #2, CHECK ALL. THIS COMMENT DOES NOT APPLY TO
 DOORS WHICH ARE ADJACENT BUT DO NOT SERVE AS "DOORS IN
 A SERIES" (FOR INSTANCE, STAIR #4 1ST FLOOR).
  
 20. LS2.1, GENERATOR ROOM 204 HAS A DOOR ON SOUTH WALL,
 NOT CLEAR WHERE THIS LEADS
  
 21. SEE NFIP REVIEW:
  
 FLOOD MAP IN EFFECT AT TIME OF FOUNDATION PERMIT
 APPLICATION 1979 FIRMS + 1' FREEBOARD
 MINIMUM ELEVATION = 8.0' NGVD29
 PROPOSED LOWEST FINISHED FLOOR ELEVATION = 9.0' NGVD29
  
 22. GENERAL COMMENT, FBC 107, SOME FMEP COMMENTS ARE
 ALSO FBC B REQUIREMENTS. A BUILDING REVIEW ON THESE
 ITEMS WILL BE DONE UPON RESUBMITTAL.
  
 23. FBC A FAIR HOUSING REQUIREMENT 2 ANSI 4.1-4.3.1,
 RECEPTION DESK IN RESIDENTS LOBBY, PROVIDE A DETAIL OR
 REQUEST THAT THIS BE A DEFERRED SUBMITTAL.
  
 24. FBC A 503, A1.1.1B AND OTHER SHEETS, WILL A LOADING
 ZONE FOR THE HOTEL BE PROVIDED? REVISE PLAN TO INDICATE
 WHETHER OR NOT A LOADING ZONE WILL BE AVAILABLE, AND IF
 YES, REVISE PLAN TO SHOW COMPLIANCE WITH FBC A 503.
  
 25. FBC A FAIR HOUSING, A1.9.1 AND OTHER SHEETS,
 REQUIREMENT 4, AN ACCESSIBLE ROUTE IS REQUIRED
 THROUGHOUT THE UNIT. SOME BALCONIES ARE NARROWER THAN
 THE REQUIRED ROUTE WIDTH OF 36". REVISE PLAN TO
 CLARIFY; EITHER PROVIDE A COMPLIANT ROUTE OR REVISE
 PLAN TO INDICATE THAT THESE AREAS ARE NOT INTENDED TO
 BE HABITABLE (JULIET BALCONY/BALCONET), IF THAT IS THE
 CASE.
  
 SLIDING GLASS DOOR CLEAR OPENING WIDTH HAS NOT BEEN
 REVIEWED AT THIS TIME PENDING ADDITIONAL INFORMATION.
  
 26. FBC 107, 10-A8.3.1, SCUPPER SIZE NOT SHOWN. WILL
 SCUPPER INCLUDE A SCREEN?
  
 27. FBC 107, A3.1.11 AND OTHER SHEETS, ALUMINUM MESH IS
 SHOWN OVER THE GARAGE ALUMINUM AIR INTAKE LOUVER. DOES
 THIS INHIBIT AIR FLOW?
  
 28. FBC B 603, "WOOD SLATS AT ROOF FASCIA" IS SHOWN; IT
 IS NOT CLEAR UNDER WHICH EXEMPTION THIS IS PROPOSED,
 REVISE PLAN TO CLARIFY.
  
 29. FBC 107, 6-A6.4.1, A 2 HOUR HORIZONTAL SHAFT WALL
 SYSTEM IS SHOWN AND REFERS TO DETAILS 13 AND 14 ON
 A10.0.1. DETAIL 14 SPECS "1 HOUR RATED SHAFTWALL
 ASSEMBLIES". SHAFT IS TO BE 2 HOUR, A HORIZONTAL
 ASSEMBLY IS TO BE SPECIFIED RATHER THAN A WALL
 ASSEMBLY. PROVIDE LISTING WHICH ADDRESSES USE OF U415
 UTILIZED IN A HORIZONTAL ORIENTATION OR REVISE DETAIL.
  
 30. FBC B 1007, FBC A 207.1, GENERAL NOTE, REVISE PLAN
 TO STATE WHICH OF THE TWO OPTIONS IS ELECTED FOR
 ACCESSIBLE MEANS OF EGRESS (APPLICABLE TO ADA PORTION
 OF PROJECT ONLY).
  
 31. FBC B 716, A1.1.1C AND A7.0.1, DOOR 105A IS IN A
 RATED WALL BUT LACKS FIRE RESISTANCE RATING, PLEASE
 REVISE OR CLARIFY.
  
 32. FBC B 603, 2-A8.3.3 AND OTHER LOCATIONS, IPE WOOD
 IS PROPOSED. IT IS NOT CLEAR UNDER WHICH EXEMPTION THIS
 IS PROPOSED, REVISE PLAN TO CLARIFY.
  
 33. FBC B 1008.1.10, A7.0.1, A1.5.1B AND OTHER SHEETS,
 DOORS SERVING A SPACE OF ASSEMBLY OCCUPANCY WITH AN
 OCCUPANT LOAD OF 50 OR MORE ARE TO BE PROVIDED WITH
 PANIC OR FIRE EXIT HARDWARE. SEE DOOR 542A, 112B, CHECK
 ALL. IT APPEARS THAT MEANS OF EGRESS FROM STAIRS 1, 2,
 AND 4 TO EXIT DISCHARGE SHOULD HAVE PANIC DEVICES.
 (THIS APPEARS TO BE DESIGNER'S INTENT AS MOST COMPLY.)
  
 34. FBC B 501.2, ADDRESS IDENTIFICATION REQUIRED,
 PLEASE REVISE PLAN OR ADVISE WHERE THIS CAN BE LOCATED.
  
 35. FBC B 505.2.1 EXCEPTION 2, FBC 403.4.4, COMPLIANCE
 IS NOT CLEAR; PLEASE ADVISE WHERE COMPLIANCE WITH FBC B
 907.5.2.2 (VOICE/ALARM SYSTEMS) CAN BE FOUND, OR REVISE
 PLAN TO SHOW COMPLIANCE. PLEASE CONTACT ME IF YOU WISH
 TO DISCUSS.
  
 36. FBC B 403.4, 907.2.13.1, 907.3.3, 907.3.4,
 AUTOMATIC SMOKE DETECTION TO BE IN ACCORDANCE WITH THIS
 SECTION. FIRE ALARM IS UNDER A SEPARATE PERMIT WHICH IS
 NOT REVIEWED BY BUILDING. PLEASE REVISE PLAN TO NOTE
 COMPLIANCE.
  
 37. FBC B 403.5.3, COMPLIANCE NOT CLEAR, PLEASE ADVISE
 WHERE STAIRWAY DOOR LOCKING IS ADDRESSED, OR REVISE
 PLAN TO SHOW COMPLIANCE.
  
 38. FBC B TABLE 705.8, CLARIFY HOW <15% WAS DETERMINED
 FOR THE WALL WHICH OPENS TO ALLOW HOTEL ACCESS.
  
 39. FBC B 1603.1.4, I WAS UNABLE TO LOCATE WIND DESIGN
 CRITERIA, PLEASE ADVISE WHERE THIS CAN BE LOCATED OR
 REVISE TO INCLUDE. NOTE THAT VULT AND VASD ARE
 REQUIRED.
  
 40. FBC B 1207, I WAS UNABLE TO LOCATE SLAB THICKNESS
 BETWEEN UNITS, ADVISE WHERE THIS CAN BE FOUND OR REVISE
 PLAN TO PROVIDE (TYPICALLY ON THE STRUCTURAL SHEETS).
 THIS INFORMATION IS REQUIRED FOR REVIEW OF THE FLOORING
 UNDERLAYMENT.
  
 41. INFORMATIONAL ONLY; THRESHOLD REVIEW MUST BE
 ADDRESSED PRIOR TO PERMIT ISSUANCE. THRESHOLD STATEMENT
 ON THE PLAN IS REQUIRED PRIOR TO A BUILDING PASS
 REVIEW. THE SI AGREEMENT AND RESUMES MAY BE SENT AT ANY
 TIME VIA EMAIL. PLEASE PROVIDE AS A COMPLETE PACKAGE
 (ALL SIGNATURES, ALL RESUMES).
  
 42. FBC A FAIR HOUSING REQUIREMENT 2 ANSI 4.1-4.3.1,
 RECEPTION DESK IN RESIDENTS LOBBY, PROVIDE A DETAIL OR
 REQUEST THAT THIS BE A DEFERRED SUBMITTAL.
  
 43. FBC A 503, A1.1.1B AND OTHER SHEETS, WILL A LOADING
 ZONE FOR THE HOTEL BE PROVIDED? REVISE PLAN TO INDICATE
 WHETHER OR NOT A LOADING ZONE WILL BE AVAILABLE, AND IF
 YES, REVISE PLAN TO SHOW COMPLIANCE WITH FBC A 503.
  
 44. FBC A FAIR HOUSING, A1.9.1 AND OTHER SHEETS,
 REQUIREMENT 4, AN ACCESSIBLE ROUTE IS REQUIRED
 THROUGHOUT THE UNIT. SOME BALCONIES ARE NARROWER THAN
 THE REQUIRED ROUTE WIDTH OF 36". REVISE PLAN TO
 CLARIFY; EITHER PROVIDE A COMPLIANT ROUTE OR REVISE
 PLAN TO INDICATE THAT THESE AREAS ARE NOT INTENDED TO
 BE HABITABLE (JULIET BALCONY/BALCONET), IF THAT IS THE
 CASE.
  
 SLIDING GLASS DOOR CLEAR OPENING WIDTH HAS NOT BEEN
 REVIEWED AT THIS TIME PENDING ADDITIONAL INFORMATION.
  
 45. THE DOCUMENT IN THE "EXPEDITE EMAIL" IS AN EMAIL
 FROM OWNER TO OUR DEPARTMENT. PLEASE REPLACE WITH
 DOCUMENT FROM INDIVIDUAL WHO IS AUTHORIZING EXPEDITED
 REVIEW WITH NO FEE, FBC 107.
  
 46. THIS PERMIT WILL BE ISSUED WITH PROVISOS; PERMIT IS
 ISSUED AT APPLICANT'S RISK:
  
 . SEPARATE PERMITS (APPLICATIONS, PLANS, AND FEES)
 REQUIRED FOR POOL, FIRE ALARM, FIRE SPRINKLER, LOW
 VOLTAGE, SIGNAGE, LANDSCAPING, ETC (EVERYTHING EXCEPT
 FOR BUILDING, MEP) FBC 107.
  
 47. A "CONSTRUCTION DRAWING" ELEVATION CERTIFICATE IS
 RECOMMENDED AT THIS TIME TO AVOID CONCRETE POUR DELAYS
 A "BUILDING UNDER CONSTRUCTION" ELEVATION CERTIFICATE
 OR FORM BOARD SURVEY IS REQUIRED PRIOR TO CONCRETE
 POUR. THIS MAY BE SENT VIA EMAIL FOR PRELIMINARY REVIEW
 A "FINISHED CONSTRUCTION" ELEVATION CERTIFICATE IS
 REQUIRED PRIOR TO FINAL INSPECTION AND/OR C.O. AND/OR
 T.C.O.
  
 48. THE FOLLOWING ITEMS ARE DEFERRED SUBMITTALS (LIST
 MAY NOT BE COMPLETE). DOCUMENTS SHOWING COMPLIANCE ARE
 TO BE REVIEWED BY DESIGNER OF RECORD PRIOR TO SUBMITTAL
 (ARCHITECT OR ENGINEER FOR PRODUCT APPROVALS,
 STRUCTURAL ENGINEER OF RECORD FOR DELEGATED
 ENGINEERING). SUBMITTAL, REVIEW AND APPROVAL ARE
 REQUIRED PRIOR TO INSTALLATION.
 COMPONENT & CLADDING PRODUCT APPROVALS (COMPLY WITH
 PRESSURES SHOWN ON SHEET S0.0.5)
 GLASS GUARDS DELEGATED ENGINEERING
 BALCONY ALUMINUM GUARDRAILS DELEGATED ENGINEERING
 POOL DECK GUARDRAILS DELEGATED ENGINEERING
  
 49. FBC B 603.1(15), A3.1.11 AND OTHER SHEETS,
 KRINKLGLAS, SHOWN ON VARIOUS PAGES, TO COMPLY WITH
 CHAPTER 26, SPEC SHEETS OR TEST REPORTS TO BE SUBMITTED
 PRIOR TO INSTALLATION.
  
 50. THIS PARCEL APPEARS TO BE LOCATED IN A SPECIAL
 FLOOD HAZARD AREA:
 A "CONSTRUCTION DRAWING" ELEVATION CERTIFICATE IS
 RECOMMENDED AT THIS TIME TO AVOID FUTURE DELAYS
 (CORRECTIONS, IF APPLICABLE, WILL NOT DELAY PERMIT
 ISSUANCE)
 A "BUILDING UNDER CONSTRUCTION" ELEVATION CERTIFICATE
 OR FORM BOARD SURVEY IS REQUIRED PRIOR TO CONCRETE
 POUR. THIS MAY BE SENT VIA EMAIL FOR PRELIMINARY REVIEW
 A "FINISHED CONSTRUCTION" ELEVATION CERTIFICATE IS
 REQUIRED PRIOR TO FINAL INSPECTION AND/OR CO AND/OR
 TCO.
  
 51. FBC B 2403.2, A9.5.3 AND OTHER SHEETS, A SEMI
 FRAMELESS SHOWER ENCLOSURE IS SHOWN. ENGINEERING MAY BE
 REQUIRED SUBJECT TO FIELD INSPECTOR'S DISCRETION.
  