2017-05-31 15:13:431) SHT.A2.613 & SHT. RP2.0 SHOW TWO WATER SUPPLIED
 CHILLERS IN THE EQUIPMENT PIT. THE WATER SUPPLY TO THE
 CHILLERS SHALL BE EQUIPPED WITH A BACKFLOW PREVENTER
 PER THE 2014 FBC- PLUMBING SEC. 608.3.
 2) SUBMIT A POOL PIPING PLAN VIEW THAT CLEARLY REFLECTS
 THE LOCATION OF THE MAIN DRAINS, SKIMMERS AND RETURNS
 FOR EACH PLUNGE POOL. WPB AMEND. TO FBC SEC. 107.2.1.
 3) PROVIDE THE TURNOVER RATE FOR EACH SPA ON THE PLANS.
 THE TURNOVER RATE FOR EACH SPA SHALL COMPLY WITH 2014
 FBC-BUILDING SEC.454.1.8.8.
 4) AUTOMATED OXIDATION REDUCTION POTENTIAL (ORP) AND PH
 CONTROLLERS WITH SENSING PROBES SHALL BE INSTALLED ON
 SPA POOLS TO ASSIST IN MAINTAINING PROPER DISINFECTION
 AND PH LEVELS. 2014 FBC-BUILDING SEC.454.1.8.12.
 5) THERAPY OR JET PUMPS SHALL TAKE SUCTION FROM THE
 COLLECTOR TANK. 2014 FBC-BUILDING SEC. 454.1.8.6.2,
 6) PROVIDE DETAILS FOR MAKEUP WATER. THE MAKEUP WATER
 LINE SHALL BE PROTECTED AGAINST BACKFLOW PER 2014
 FBC-PLUMBING SEC. 608.1.
 7) A FIXED THERMOMETER SHALL BE MOUNTED IN THE POOL
 RECIRCULATION DOWNSTREAM FROM THE HEATER
 OUTLET.THERMOMETERS MOUNTED ON HEATER OUTLETS DO NOT
 MEET THIS REQUIREMENT. 2014 FBC-BUILDING
 SECS.454.1.6.5.14, 454.1.8.1.
 8) THE FLOW VELOCITY IN SUCTION PIPING SHALL NOT EXCEED
 6 FT. PER SECOND. THE MAIN DRAIN SPECS SHOW 6.42 FPS.
 CLARIFY. 2014 FBC SEC. 454.1.6.5.8.
 9) PAGE 3 - UTILITIES SECTION OF THE HYDROWORX DESIGN
 GUIDE SPECIFIES THAT A MINIMUM 2 INCH WATER SUPPLY LINE
 WITH ANTI-SIPHON DEVICE BE CONNECTED TO THE
 RECIRCULATION RETURN LINE, A 3/4" DIAMETER HOSE BIBB
 WITH ANT-SIPHON IN THE POOLROOM AND A 1- 1/2 INCH OR 2
 INCH DIAMETER BUILDING LOOP LINE TO AND FROM THE WATER
 COOLED CHILLER. SUPPLY THIS INFORMATION/DETAIL FOR
 REVIEW. SUBMIT PLUMBING SCHEMATIC FROM HYDROWORX.
 10) INDICATE WHAT MEANS IS PROVIDED FOR DRAINING THE
 SPAS.
 11) PAGE 7 OF THE HYDROWORX DESIGN GUIDE RECOMMENDS
 INSULATION OF THE CHILLED WATER. PROVIDE DETAIL ON
 THICKNES OF INSULATION.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved