2017-05-31 15:13:43 | 1) SHT.A2.613 & SHT. RP2.0 SHOW TWO WATER SUPPLIED |
| CHILLERS IN THE EQUIPMENT PIT. THE WATER SUPPLY TO THE |
| CHILLERS SHALL BE EQUIPPED WITH A BACKFLOW PREVENTER |
| PER THE 2014 FBC- PLUMBING SEC. 608.3. |
| 2) SUBMIT A POOL PIPING PLAN VIEW THAT CLEARLY REFLECTS |
| THE LOCATION OF THE MAIN DRAINS, SKIMMERS AND RETURNS |
| FOR EACH PLUNGE POOL. WPB AMEND. TO FBC SEC. 107.2.1. |
| 3) PROVIDE THE TURNOVER RATE FOR EACH SPA ON THE PLANS. |
| THE TURNOVER RATE FOR EACH SPA SHALL COMPLY WITH 2014 |
| FBC-BUILDING SEC.454.1.8.8. |
| 4) AUTOMATED OXIDATION REDUCTION POTENTIAL (ORP) AND PH |
| CONTROLLERS WITH SENSING PROBES SHALL BE INSTALLED ON |
| SPA POOLS TO ASSIST IN MAINTAINING PROPER DISINFECTION |
| AND PH LEVELS. 2014 FBC-BUILDING SEC.454.1.8.12. |
| 5) THERAPY OR JET PUMPS SHALL TAKE SUCTION FROM THE |
| COLLECTOR TANK. 2014 FBC-BUILDING SEC. 454.1.8.6.2, |
| 6) PROVIDE DETAILS FOR MAKEUP WATER. THE MAKEUP WATER |
| LINE SHALL BE PROTECTED AGAINST BACKFLOW PER 2014 |
| FBC-PLUMBING SEC. 608.1. |
| 7) A FIXED THERMOMETER SHALL BE MOUNTED IN THE POOL |
| RECIRCULATION DOWNSTREAM FROM THE HEATER |
| OUTLET.THERMOMETERS MOUNTED ON HEATER OUTLETS DO NOT |
| MEET THIS REQUIREMENT. 2014 FBC-BUILDING |
| SECS.454.1.6.5.14, 454.1.8.1. |
| 8) THE FLOW VELOCITY IN SUCTION PIPING SHALL NOT EXCEED |
| 6 FT. PER SECOND. THE MAIN DRAIN SPECS SHOW 6.42 FPS. |
| CLARIFY. 2014 FBC SEC. 454.1.6.5.8. |
| 9) PAGE 3 - UTILITIES SECTION OF THE HYDROWORX DESIGN |
| GUIDE SPECIFIES THAT A MINIMUM 2 INCH WATER SUPPLY LINE |
| WITH ANTI-SIPHON DEVICE BE CONNECTED TO THE |
| RECIRCULATION RETURN LINE, A 3/4" DIAMETER HOSE BIBB |
| WITH ANT-SIPHON IN THE POOLROOM AND A 1- 1/2 INCH OR 2 |
| INCH DIAMETER BUILDING LOOP LINE TO AND FROM THE WATER |
| COOLED CHILLER. SUPPLY THIS INFORMATION/DETAIL FOR |
| REVIEW. SUBMIT PLUMBING SCHEMATIC FROM HYDROWORX. |
| 10) INDICATE WHAT MEANS IS PROVIDED FOR DRAINING THE |
| SPAS. |
| 11) PAGE 7 OF THE HYDROWORX DESIGN GUIDE RECOMMENDS |
| INSULATION OF THE CHILLED WATER. PROVIDE DETAIL ON |
| THICKNES OF INSULATION. |
| |
| TIM LARGE |
| CHIEF PLUMBING INSPECTOR |
| PLUMBING PLAN REVIEW |
| 561-805-6692 |
| [email protected] |
| |
| |
| |
| |