Plan Review Details - Permit 17110075
Plan Review Stops For Permit 17110075 |
Review Stop |
AD |
ADDRESSING |
Rev No |
2 |
Status |
P |
Date |
2018-03-17 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2018-03-17 |
Time |
13:55 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2018-03-17 |
Time |
13:55 |
Sent To |
|
|
Notes |
|
|
Review Stop |
AD |
ADDRESSING |
Rev No |
1 |
Status |
F |
Date |
2017-12-13 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2017-12-13 |
Time |
10:04 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2017-12-13 |
Time |
10:04 |
Sent To |
|
|
Notes |
2017-12-13 10:04:39 | ASSIGN NEW ADDRESS AND PARCEL ID PRIOR TO PERMIT | | ISSUANCE | | | | | 2017-11-14 15:02:19 | CHANGE 200 2ND STREET ADDRESS TO 290 N OLIVE |
|
|
Review Stop |
AIPP |
ART IN PUBLIC PLACES |
Rev No |
1 |
Status |
P |
Date |
2020-10-20 |
|
|
Cont ID |
|
Sent By |
rgathrig |
Date |
2020-10-20 |
Time |
10:33 |
Rev Time |
0.00 |
Received By |
rgathrig |
Date |
2020-10-20 |
Time |
10:32 |
Sent To |
|
|
Notes |
2020-10-20 10:34:48 | PER PHONE CALL FROM SYBILLE ALL AIPP REQUIREMENTS ARE | | MET | | | | RICHARD GATHRIGHT |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
4 |
Status |
P |
Date |
2018-06-04 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2018-06-04 |
Time |
10:33 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2018-06-04 |
Time |
10:33 |
Sent To |
|
|
Notes |
2018-06-04 10:33:30 | ****PROVISOS**** | | ****ISSUED AT APPLICANT'S RISK**** | | | | SAMANTHA HILL | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6724 | | | | FBC = FLORIDA BUILDING CODE, 5TH EDITION (2014) | | FBC B = FBC BUILDING | | FBC EB = FBC EXISTING BUILDING | | FBC A = FBC ACCESSIBILITY | | FBC EC = FBC ENERGY CONSERVATION | | | | 1. GENERAL COMMENT, FBC 107, SOME FMEP COMMENTS ARE | | ALSO FBC B REQUIREMENTS. A BUILDING REVIEW ON THESE | | ITEMS WILL BE DONE UPON RESUBMITTAL. | | | | 2. REVISION REQUIRED PRIOR TO INSTALLATION - FBC 107, | | 6-A6.4.1, A 2 HOUR HORIZONTAL SHAFT WALL SYSTEM IS | | SHOWN AND REFERS TO DETAILS 13 AND 14 ON A10.0.1. | | DETAIL 14 SPECS "1 HOUR RATED SHAFTWALL ASSEMBLIES". | | SHAFT IS TO BE 2 HOUR, A HORIZONTAL ASSEMBLY IS TO BE | | SPECIFIED RATHER THAN A WALL ASSEMBLY. PROVIDE LISTING | | WHICH ADDRESSES USE OF U415 UTILIZED IN A HORIZONTAL | | ORIENTATION OR REVISE DETAIL. | | | | DETAIL TO COMPLY WITH FBC B 717.3.1, 713.4, 703.2.1 | | (ALSO 713.14, 909.21.3 IF APPLICABLE). | | | | 3. FBC B 403.4, 907.2.13.1, 907.3.3, 907.3.4, AUTOMATIC | | SMOKE DETECTION TO BE IN ACCORDANCE WITH THIS SECTION. | | FIRE ALARM IS UNDER A SEPARATE PERMIT; PLANS ARE TO | | COMPLY WITH OR CLARIFY THE FOLLOWING: | | | | SHEET FA1.0.0, THE FIRE ALARM LEGEND AND OTHER TEXT ON | | THE PAGE ARE TOO LIGHT TO BE LEGIBLE. | | SHEET FA1.1.1A, FBC B 970.2.13.1.1(1), A SMOKE DETECTOR | | IS REQUIRED IN THE TRANSFORMER VAULT. | | THE GRAPHIC IN THE EMERGENCY SWITCH GEAR ROOM WITH TEXT | | R/F IS NOT ON THE LEGEND BUT IS SIMILAR TO THE GRAPHIC | | FOR "HEAT DETECTOR SENSOR BASE"; CLARIFY. WHAT IS R/F? | | DOES THIS DEVICE MEET THE REQUIREMENT IN FBC B | | 907.2.13.1.1? | | GRAPHICS ARE NOT CLEAR. SEE FA1.3.1A, SEE STAIR #2 ON | | FIRST FLOOR (AND OTHER LOCATIONS), CLARIFY WHAT S IN A | | PLAIN SQUARE DEPICTS. ALSO CLARIFY WHY THE EXIT | | PASSAGEWAYS/EXIT CORRIDORS DO NOT HAVE ANY DEVICES; ARE | | THE EXEMPTED? | | HOW WILL THE REQUIREMENTS OF FBC B 908.7.1 BE MET? | | | | 4. FBC B 403.5.3, REVISE PLAN TO SHOW COMPLIANCE. | | | | RESPONSE STATES THAT E3.0.0 FIRE COMMAND ROOM HAS A | | DOOR UNLOCKING DEVICE; PLEASE HAVE ENGINEER ADVISE AS | | TO WHERE THIS CAN BE FOUND. IT DOES NOT APPEAR TO BE | | ONE OF THE "FIRE COMMAND ROOM KEYNOTES" OR REVISE PLAN | | TO INCLUDE. | | | | 5. FBC B TABLE 705.8, CLARIFY HOW <15% WAS DETERMINED | | FOR THE WALL WHICH OPENS TO ALLOW HOTEL ACCESS. | | | | RESPONSE WILL BE DISCUSSED WITH BUILDING OFFICIAL AND | | ABO. WALL PERCENTAGE CALCULATIONS ARE DONE BASED ON THE | | WALL PORTION WHICH IS AFFECTED (PORTION WHICH IS >3' | | FROM PROPERTY LINE). ON LS1.1 THE CALCULATION UTILIZES | | THE ENTIRE WALL LENGTH. IT IS POSSIBLE THAT THIS WILL | | BE PERMITTED DEPENDING ON OPENINGS ON THE ADJACENT | | PROPERTY IN THIS LOCATION. PROVIDE INFORMATION | | REGARDING OPENINGS ON THE OTHER SIDE OF THE LOT LINE. | | | | 6. THIS PARCEL IS LOCATED IN A SPECIAL FLOOD HAZARD | | AREA; FLOOD MAP IN EFFECT AT TIME OF FOUNDATION PERMIT | | APPLICATION 1979 FIRMS + 1' FREEBOARD; MINIMUM | | ELEVATION = 8.0' NGVD29, PROPOSED LOWEST FINISHED FLOOR | | ELEVATION = 9.0' NGVD29 | | A "CONSTRUCTION DRAWING" ELEVATION CERTIFICATE IS | | RECOMMENDED AT THIS TIME TO AVOID FUTURE DELAYS | | (CORRECTIONS, IF APPLICABLE, WILL NOT DELAY PERMIT | | ISSUANCE) | | A "BUILDING UNDER CONSTRUCTION" ELEVATION CERTIFICATE | | OR FORM BOARD SURVEY IS REQUIRED PRIOR TO CONCRETE | | POUR. THIS MAY BE SENT VIA EMAIL FOR PRELIMINARY REVIEW | | A "FINISHED CONSTRUCTION" ELEVATION CERTIFICATE IS | | REQUIRED PRIOR TO FINAL INSPECTION AND/OR CO AND/OR | | TCO. | | | | 7. BARN DOORS TO MAINTAIN THE 25SF LOUVERS, A1.3.1 AND | | OTHER SHEETS UP TO 3RD FLOOR, FOR COMPLIANCE WITH FBC B | | 1029.1, OK PER RB. | | | | 8. DEFERRED SUBMITTALS REQUESTED BY ARCHITECT, SEE | | FOLLOWING LIST (MAY NOT BE A COMPLETE LIST); DOCUMENTS | | SHOWING COMPLIANCE ARE TO BE REVIEWED BY DESIGNER OF | | RECORD PRIOR TO SUBMITTAL (ARCHITECT OR ENGINEER FOR | | PRODUCT APPROVALS AND OTHER SPECIFICATION DOCUMENTS, | | STRUCTURAL ENGINEER OF RECORD APPROVAL AND REVIEW IS | | REQUIRED FOR DELEGATED ENGINEERING). SUBMITTAL, REVIEW | | AND APPROVAL ARE REQUIRED PRIOR TO INSTALLATION. | | | | COMPONENT & CLADDING PRODUCT APPROVALS (COMPLY WITH | | PRESSURES SHOWN ON SHEET S0.0.5) | | FBC B 2403.2, SEMI FRAMELESS SHOWER ENCLOSURE | | ENGINEERING | | GLASS GUARDS DELEGATED ENGINEERING | | BALCONY ALUMINUM GUARDRAILS DELEGATED ENGINEERING | | POOL DECK GUARDRAILS DELEGATED ENGINEERING | | ALUCOBOND, PROVIDE PRODUCT APPROVALS AND SPEC SHEETS TO | | SHOW COMPLIANCE WITH FBC B 602.2, 1 | | TERRACORP, SPEC SHEETS SHOWING COMPLIANCE WITH | | REQUIREMENTS FOR NON COMBUSTIBLE BUILDINGS, | | INSTALLATION DETAILS FBC B 1609 | | DECORATIVE MESH COLUMN ENCLOSURE SHOWN ON A3.1.14 AND | | OTHER SHEETS, FBC B 602.2 (NON COMBUSTIBLE), 1609 | | (RESISTANCE TO WIND LOADS), PROVIDE SPEC SHEETS AND | | PRODUCT APPROVAL OR ENGINEERING TO SHOW COMPLIANCE | | | | 9. FBC 1207.2, 1207.3, FIELD TESTING FOR STC/IIC WILL | | BE DONE, LVT ENVIROQUIET II (NOTE: 8" CONCRETE SLABS) | | WHISPER MAT CS IS PROPOSED BUT DOES NOT HAVE A FLAME | | SPREAD TEST FOR LVT. PLEASE CONTACT ME IN A FEW WEEKS; | | AT THIS TIME THE WHISPER MAT CS SPEC SHEET HAS BEEN | | VOIDED, BUT WE ARE CURRENTLY EVALUATING THIS AND OTHER | | UNDERLAYMENTS IN THIS APPLICATION. | | | | 10. THE FOLLOWING ITEMS MAY REQUIRE A DETAIL OR SPEC | | SHEETS TO BE SUBMITTED SUBJECT TO INSPECTOR'S | | DISCRETION: | | FBC B 603, "WOOD SLATS AT ROOF FASCIA" IS SHOWN; | | PROVIDE SPEC SHEETS AT INSPECTION TO SHOW COMPLIANCE. | | FBC B 603.1 2-A8.3.3 AND OTHER LOCATIONS, IPE WOOD IS | | PROPOSED; PROVIDE SPEC SHEETS AT INSPECTION TO SHOW | | COMPLIANCE. | | FBC A FAIR HOUSING REQUIREMENT 2 ANSI 4.1-4.3.1, | | RECEPTION DESK IN RESIDENTS LOBBY TO COMPLY. | | FBC B 603.1(15), A3.1.11 AND OTHER SHEETS, KRINKLGLAS, | | SHOWN ON VARIOUS PAGES, TO COMPLY WITH CHAPTER 26 | | | | 11. SEPARATE PERMITS (APPLICATIONS, PLANS, AND FEES) | | ARE REQUIRED FOR: | | LIGHT POLES/SITE LIGHTING | | SWIMMING POOL | | FIRE ALARM | | FIRE SPRINKLER | | LOW VOLTAGE | | ACCESS | | LANDSCAPING | | IRRIGATION | | ALL OTHER ITEMS OTHER THAN BMEP | | | | 12. PROVIDE THE RECORDED PLAT WHEN FINALIZED; EITHER A | | PDF VIA EMAIL OR ADVISE BOOK AND PAGE NUMBER VIA EMAIL. | | | | 13. AIPP COMPLIANCE REQUIRED; VERIFICATION REQUIRED | | PRIOR TO C.O. | | | | 14. SHORING/RESHORE ENGINEERING IS REQUIRED TO BE | | SUBMITTED TO THE BUILDING DIVISION FOR REVIEW. THE | | ENGINEERING IS TO BE SUBMITTED, REVIEWED AND ISSUED | | PRIOR TO CONCRETE POUR. | | | | 15. A CONSTRUCTION GUARD RAIL ENGINEERED DETAIL IS | | REQUIRED TO BE PROVIDED PRIOR TO INSTALLATION. | | | | | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
F |
Date |
2018-05-27 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2018-05-27 |
Time |
14:53 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2018-05-13 |
Time |
12:33 |
Sent To |
|
|
Notes |
2018-05-27 14:54:04 | ****CORRECTIONS**** | | | | SAMANTHA HILL | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6724 | | | | FBC = FLORIDA BUILDING CODE, 5TH EDITION (2014) | | FBC B = FBC BUILDING | | FBC EB = FBC EXISTING BUILDING | | FBC A = FBC ACCESSIBILITY | | FBC EC = FBC ENERGY CONSERVATION | | | | COMMENTS FROM PREVIOUS LIST: | | | | 22. GENERAL COMMENT, FBC 107, SOME FMEP COMMENTS ARE | | ALSO FBC B REQUIREMENTS. A BUILDING REVIEW ON THESE | | ITEMS WILL BE DONE UPON RESUBMITTAL. | | | | 23-28. OK | | | | 29. FBC 107, 6-A6.4.1, A 2 HOUR HORIZONTAL SHAFT WALL | | SYSTEM IS SHOWN AND REFERS TO DETAILS 13 AND 14 ON | | A10.0.1. DETAIL 14 SPECS "1 HOUR RATED SHAFTWALL | | ASSEMBLIES". SHAFT IS TO BE 2 HOUR, A HORIZONTAL | | ASSEMBLY IS TO BE SPECIFIED RATHER THAN A WALL | | ASSEMBLY. PROVIDE LISTING WHICH ADDRESSES USE OF U415 | | UTILIZED IN A HORIZONTAL ORIENTATION OR REVISE DETAIL. | | | | 3RD REVIEW, RESPONSE LETTER STATES THAT UL U497 WAS | | ADDED AND HAS HORIZONTAL ASSEMBLIES. PLEASE SEE THE | | DETAIL AT THIS WEBSITE: | | | | HTTP://DATABASE.UL.COM/CGI-BIN/XYV/TEMPLATE/LISEXT/1FRA | | ME/SHOWPAGE.HTML?NAME=BXUV.U497&CCNSHORTTITLE=FIRE-RESI | | STANCE+RATINGS+-+ANSI/UL+263&OBJID=1074330896&CFGID=107 | | 3741824&VERSION=VERSIONLESS&PARENT_ID=1073984818&SEQUEN | | CE=1 | | | | UL U ASSEMBLIES ARE FOR WALLS (VERTICAL). I WAS UNABLE | | TO LOCATE THE ASSEMBLY WHI694-0300.2; PLEASE PROVIDE. | | | | PLEASE SEND A PROPOSED DETAIL VIA EMAIL. DETAIL TO | | COMPLY WITH FBC B 717.3.1, 713.4, 703.2.1 (ALSO 713.14, | | 909.21.3 IF APPLICABLE). PLEASE CONTACT ME TO DISCUSS. | | THIS REQUIREMENT WAS CONFIRMED WITH A FBC ISSUED | | DECLARATORY STATEMENT. | | | | 30-35. OK | | | | 36. FBC B 403.4, 907.2.13.1, 907.3.3, 907.3.4, | | AUTOMATIC SMOKE DETECTION TO BE IN ACCORDANCE WITH THIS | | SECTION. FIRE ALARM IS UNDER A SEPARATE PERMIT WHICH IS | | NOT REVIEWED BY BUILDING. PLEASE REVISE PLAN TO NOTE | | COMPLIANCE. | | | | ARCHITECT'S RESPONSE IS THAT THEY PREFER THAT THE FIRE | | ALARM DRAWINGS ARE REVIEWED AT THIS TIME. PLEASE REVISE | | THE FOLLOWING: | | | | SHEET FA1.0.0, THE FIRE ALARM LEGEND AND OTHER TEXT ON | | THE PAGE ARE TOO LIGHT TO BE LEGIBLE. | | SHEET FA1.1.1A, FBC B 970.2.13.1.1(1), A SMOKE DETECTOR | | IS REQUIRED IN THE TRANSFORMER VAULT. | | THE GRAPHIC IN THE EMERGENCY SWITCH GEAR ROOM WITH TEXT | | R/F IS NOT ON THE LEGEND BUT IS SIMILAR TO THE GRAPHIC | | FOR "HEAT DETECTOR SENSOR BASE"; CLARIFY. WHAT IS R/F? | | DOES THIS DEVICE MEET THE REQUIREMENT IN FBC B | | 907.2.13.1.1? | | GRAPHICS ARE NOT CLEAR. SEE FA1.3.1A, SEE STAIR #2 ON | | FIRST FLOOR (AND OTHER LOCATIONS), CLARIFY WHAT S IN A | | PLAIN SQUARE DEPICTS. ALSO CLARIFY WHY THE EXIT | | PASSAGEWAYS/EXIT CORRIDORS DO NOT HAVE ANY DEVICES; ARE | | THE EXEMPTED? | | HOW WILL THE REQUIREMENTS OF FBC B 908.7.1 BE MET? | | | | IT IS POSSIBLE THAT, IF FIRE PROTECTION ENGINEER | | CONTACTS ME TO ADVISE HOW THESE ISSUES WILL BE | | ADDRESSED WHEN THE FIRE ALARM PERMIT IS SUBMITTED, THIS | | CAN BE A PROVISO ITEM. | | | | 37. FBC B 403.5.3, COMPLIANCE NOT CLEAR, PLEASE ADVISE | | WHERE STAIRWAY DOOR LOCKING IS ADDRESSED, OR REVISE | | PLAN TO SHOW COMPLIANCE. | | | | RESPONSE STATES THAT E3.0.0 FIRE COMMAND ROOM HAS A | | DOOR UNLOCKING DEVICE; PLEASE HAVE ENGINEER ADVISE AS | | TO WHERE THIS CAN BE FOUND. IT DOES NOT APPEAR TO BE | | ONE OF THE "FIRE COMMAND ROOM KEYNOTES". | | | | RESPONSE LETTER ALSO STATES THAT ACCESS CONTROL | | DRAWINGS 840-849 INDICATE WHICH DOORS AND THE CONTROLS | | FOR THESE DOORS TO LOCK AND UNLOCK. THESE PAGES ARE NOT | | DESIGNED BY AN ARCHITECT OR ENGINEER AND CANNOT BE USED | | TO DEMONSTRATE CODE COMPLIANCE. ALL DOORS ARE REQUIRED | | TO RELEASE. | | | | IT IS POSSIBLE THAT, IF FIRE PROTECTION ENGINEER | | CONTACTS ME TO CLARIFY, THIS CAN BE A PROVISO ITEM. | | | | 38. FBC B TABLE 705.8, CLARIFY HOW <15% WAS DETERMINED | | FOR THE WALL WHICH OPENS TO ALLOW HOTEL ACCESS. | | | | 3RD REVIEW; RESPONSE WILL BE DISCUSSED WITH BUILDING | | OFFICIAL AND ABO. WALL PERCENTAGE CALCULATIONS ARE DONE | | BASED ON THE WALL PORTION WHICH IS AFFECTED (PORTION | | WHICH IS >3' FROM PROPERTY LINE). ON LS1.1 THE | | CALCULATION UTILIZES THE ENTIRE WALL LENGTH. IT IS | | POSSIBLE THAT THIS WILL BE PERMITTED DEPENDING ON | | OPENINGS ON THE ADJACENT PROPERTY IN THIS LOCATION. IF | | READILY AVAILABLE, PROVIDE THIS INFORMATION VIA EMAIL. | | IF NOT READILY AVAILABLE TO ARCHITECT, I CAN GET IT | | FROM THE HOTEL PERMIT DOCUMENTS. | | | | 39-40. OK | | | | 41. REGARDING THRESHOLD STATEMENT, RESPONSE IS THAT | | THIS IS ON EVERY STRUCTURAL PAGE. I APOLOGIZE FOR THE | | COMMENT NOT BEING CLEAR; I CANNOT LOCATE THIS STATEMENT | | ON THE ARCHITECTURAL PLANS. STATUTE STATES: | | | | W.P.B. AMENDMENT 110.3.7.4.4, FS553.79(7)(D): ALL PLANS | | FOR THE BUILDING WHICH ARE REQUIRED TO BE SIGNED AND | | SEALED BY THE ARCHITECT OR ENGINEER OF RECORD CONTAIN A | | STATEMENT THAT, TO THE BEST OF THE ARCHITECT'S OR | | ENGINEER'S KNOWLEDGE, THE PLANS AND SPECIFICATIONS | | COMPLY WITH THE APPLICABLE MINIMUM BUILDING CODES AND | | THE APPLICABLE FIRESAFETY STANDARDS AS DETERMINED BY | | THE LOCAL AUTHORITY IN ACCORDANCE WITH THIS CHAPTER AND | | CHAPTER 633. | | | | IF YOU ARE OF THE OPINION THAT THE ARCHITECT IS NOT | | REQUIRED TO INCLUDE THE THRESHOLD STATEMENT, PLEASE | | ADVISE AND I'LL DO FURTHER RESEARCH. ALL THRESHOLD | | BUILDINGS THAT I'VE REVIEWED HAVE INCLUDED THE | | STATEMENT BY BOTH ARCHITECT AND ENGINEER, EITHER ON ALL | | PAGES OR ON ONE PAGE. | | | | 42. THIS PERMIT WILL BE ISSUED WITH THE FOLLOWING | | PROVISOS: | | | | A. THIS PARCEL IS LOCATED IN A SPECIAL FLOOD HAZARD | | AREA; FLOOD MAP IN EFFECT AT TIME OF FOUNDATION PERMIT | | APPLICATION 1979 FIRMS + 1' FREEBOARD; MINIMUM | | ELEVATION = 8.0' NGVD29, PROPOSED LOWEST FINISHED FLOOR | | ELEVATION = 9.0' NGVD29 | | A "CONSTRUCTION DRAWING" ELEVATION CERTIFICATE IS | | RECOMMENDED AT THIS TIME TO AVOID FUTURE DELAYS | | (CORRECTIONS, IF APPLICABLE, WILL NOT DELAY PERMIT | | ISSUANCE) | | A "BUILDING UNDER CONSTRUCTION" ELEVATION CERTIFICATE | | OR FORM BOARD SURVEY IS REQUIRED PRIOR TO CONCRETE | | POUR. THIS MAY BE SENT VIA EMAIL FOR PRELIMINARY REVIEW | | A "FINISHED CONSTRUCTION" ELEVATION CERTIFICATE IS | | REQUIRED PRIOR TO FINAL INSPECTION AND/OR CO AND/OR | | TCO. | | | | B. BARN DOORS TO MAINTAIN THE 25SF LOUVERS, A1.3.1 AND | | OTHER SHEETS UP TO 3RD FLOOR, FOR COMPLIANCE WITH FBC B | | 1029.1, OK PER RB. | | | | C. DEFERRED SUBMITTALS REQUESTED BY ARCHITECT, SEE | | FOLLOWING LIST (MAY NOT BE A COMPLETE LIST); DOCUMENTS | | SHOWING COMPLIANCE ARE TO BE REVIEWED BY DESIGNER OF | | RECORD PRIOR TO SUBMITTAL (ARCHITECT OR ENGINEER FOR | | PRODUCT APPROVALS AND OTHER SPECIFICATION DOCUMENTS, | | STRUCTURAL ENGINEER OF RECORD APPROVAL AND REVIEW IS | | REQUIRED FOR DELEGATED ENGINEERING). SUBMITTAL, REVIEW | | AND APPROVAL ARE REQUIRED PRIOR TO INSTALLATION. | | | | COMPONENT & CLADDING PRODUCT APPROVALS (COMPLY WITH | | PRESSURES SHOWN ON SHEET S0.0.5) | | FBC B 2403.2, SEMI FRAMELESS SHOWER ENCLOSURE | | ENGINEERING | | GLASS GUARDS DELEGATED ENGINEERING | | BALCONY ALUMINUM GUARDRAILS DELEGATED ENGINEERING | | POOL DECK GUARDRAILS DELEGATED ENGINEERING | | ALUCOBOND, PROVIDE PRODUCT APPROVALS AND SPEC SHEETS TO | | SHOW COMPLIANCE WITH FBC B 602.2, 1 | | TERRACORP, SPEC SHEETS SHOWING COMPLIANCE WITH | | REQUIREMENTS FOR NON COMBUSTIBLE BUILDINGS, | | INSTALLATION DETAILS FBC B 1609 | | DECORATIVE MESH COLUMN ENCLOSURE SHOWN ON A3.1.14 AND | | OTHER SHEETS, FBC B 602.2 (NON COMBUSTIBLE), 1609 | | (RESISTANCE TO WIND LOADS), PROVIDE SPEC SHEETS AND | | PRODUCT APPROVAL OR ENGINEERING TO SHOW COMPLIANCE | | | | D. FBC 1207.2, 1207.3, FIELD TESTING FOR STC/IIC WILL | | BE DONE, LVT ENVIROQUIET II (NOTE: 8" CONCRETE SLABS) | | WHISPER MAT CS IS PROPOSED BUT DOES NOT HAVE A FLAME | | SPREAD TEST FOR LVT. PLEASE CONTACT ME IN A FEW WEEKS; | | AT THIS TIME THE WHISPER MAT CS SPEC SHEET HAS BEEN | | VOIDED, BUT WE ARE CURRENTLY EVALUATING THIS AND OTHER | | UNDERLAYMENTS IN THIS APPLICATION. | | | | E. THE FOLLOWING ITEMS MAY REQUIRE A DETAIL OR SPEC | | SHEETS TO BE SUBMITTED SUBJECT TO INSPECTOR'S | | DISCRETION: | | FBC B 603, "WOOD SLATS AT ROOF FASCIA" IS SHOWN; | | PROVIDE SPEC SHEETS AT INSPECTION TO SHOW COMPLIANCE. | | FBC B 603.1 2-A8.3.3 AND OTHER LOCATIONS, IPE WOOD IS | | PROPOSED; PROVIDE SPEC SHEETS AT INSPECTION TO SHOW | | COMPLIANCE. | | FBC A FAIR HOUSING REQUIREMENT 2 ANSI 4.1-4.3.1, | | RECEPTION DESK IN RESIDENTS LOBBY TO COMPLY. | | FBC B 603.1(15), A3.1.11 AND OTHER SHEETS, KRINKLGLAS, | | SHOWN ON VARIOUS PAGES, TO COMPLY WITH CHAPTER 26 | | | | F. SEPARATE PERMITS (APPLICATIONS, PLANS, AND FEES) ARE | | REQUIRED FOR: | | LIGHT POLES/SITE LIGHTING | | SWIMMING POOL | | FIRE ALARM | | FIRE SPRINKLER | | LOW VOLTAGE | | ACCESS | | LANDSCAPING | | IRRIGATION | | ALL OTHER ITEMS OTHER THAN BMEP | | | | G. PROVIDE THE RECORDED PLAT WHEN FINALIZED; EITHER A | | PDF VIA EMAIL OR ADVISE BOOK AND PAGE NUMBER VIA EMAIL. | | | | H. AIPP COMPLIANCE REQUIRED; VERIFICATION REQUIRED | | PRIOR TO C.O. | | | | I. SHORING/RESHORE ENGINEERING IS REQUIRED TO BE | | SUBMITTED TO THE BUILDING DIVISION FOR REVIEW. THE | | ENGINEERING IS TO BE SUBMITTED, REVIEWED AND ISSUED | | PRIOR TO CONCRETE POUR. | | | | J. A CONSTRUCTION GUARD RAIL ENGINEERED DETAIL IS | | REQUIRED TO BE PROVIDED PRIOR TO INSTALLATION. | | | | | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2018-03-17 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2018-03-17 |
Time |
13:54 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2018-03-13 |
Time |
12:39 |
Sent To |
|
|
Notes |
2018-03-17 13:54:48 | ****CORRECTIONS**** | | | | SAMANTHA HILL | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6724 | | | | FBC = FLORIDA BUILDING CODE, 5TH EDITION (2014) | | FBC B = FBC BUILDING | | FBC EB = FBC EXISTING BUILDING | | FBC A = FBC ACCESSIBILITY | | FBC EC = FBC ENERGY CONSERVATION | | | | PLEASE NOTE THAT THERE IS A DISCREPANCY BETWEEN THE 1ST | | REVIEW IN EGOV PLUS AND THE RESPONSE LETTER. THEREFORE, | | IT APPEARS THAT SOME COMMENTS WERE NOT ADDRESSED. IN | | THE FUTURE, ESPECIALLY FOR LARGE PROJECTS, PLEASE NOTE | | THE TOP OF THE REVIEW WHICH WILL INDICATE IF IT IS | | "REVIEW IN PROGRESS". IF THAT LANGUAGE IS AT THE TOP OF | | THE REVIEW, THE REVIEW IS IN PROGRESS AND IS CHANGING. | | THIS IS DONE FOR TIME SENSITIVE PROJECTS WHEN IT IS NOT | | POSSIBLE TO GET THE REVIEW DONE IN ONE REVIEW SESSION. | | I APOLOGIZE FOR ANY INCONVENIENCE; PLEASE FEEL FREE TO | | CALL ME IF YOU WISH TO DISCUSS. | | | | 1-8. OK | | | | COMMENTS FROM PREVIOUS LIST: | | | | 9. A1.1,1, FBC 107, IT IS NOT CLEAR WHICH PARKING | | SPACES ARE DEDICATED TO THE RETAIL, HOTEL, AND WHICH | | ARE FOR RESIDENTS (ACCESSIBILITY VS FAIR HOUSING), | | REVISE PLAN TO SHOW COMPLIANCE. | | | | 2ND REVIEW, PLEASE PROVIDE A TABLE WHICH STATES NUMBER | | OF ACCESSIBLE SPACES, VAN ACCESSIBLE, TOTAL SPACES, FOR | | THE RETAIL, HOTEL, AND RESIDENTS, OR ADVISE WHERE THIS | | INFORMATION CAN BE LOCATED. SEE FBC A 208.2, FBC A FAIR | | HOUSING. | | | | 11-13. OK | | | | 14. A3.1.13 AND OTHER SHEETS, FBC B 602.2, TERRACORP | | PROPOSED, PROVIDE SPEC SHEETS SHOWING COMPLIANCE. THIS | | MAY BE A PROVISO ITEM UPON REQUEST. | | | | 15. A3.1.14 AND OTHER SHEETS, FBC B 602.2, 1609, | | DECORATIVE MESH COLUMN ENCLOSURE PROPOSED, PROVIDE SPEC | | SHEETS AND PRODUCT APPROVAL OR ENGINEERING TO SHOW | | COMPLIANCE. THIS MAY BE A PROVISO ITEM UPON REQUEST. | | | | 16-17. OK | | | | 18. FLOORING UNDERLAYMENT TO COMPLY WITH THE FOLLOWING: | | | | A. FBC 1207.2, STC - 2ND REVIEW, THE TEST REPORT | | PROVIDED IS FOR TILE, LVT PROPOSED. EITHER PROVIDE A | | COPY OF A TEST REPORT FOR LVT OR PROVIDE A COMPARATIVE | | ANALYSIS (CAN BE IN THE FORM OF A LETTER) WHICH | | DEMONSTRATES THAT PROPOSED INSTALLATION COMPLIES WITH | | THE REQUIREMENT OF STC OF AT LEAST 50. | | | | B. FBC 1207.3, IIC - 2ND REVIEW, THE TEST REPORT | | PROVIDED IS FOR TILE, LVT PROPOSED. EITHER PROVIDE A | | COPY OF A TEST REPORT FOR LVT OR PROVIDE A COMPARATIVE | | ANALYSIS (CAN BE IN THE FORM OF A LETTER) WHICH | | DEMONSTRATES THAT PROPOSED INSTALLATION COMPLIES WITH | | THE REQUIREMENT OF IIC OF AT LEAST 50. | | | | C. FBC 603.1, ALLOWABLE MATERIALS IN NON COMBUSTIBLE | | BUILDINGS, SEE ITEM 2, EXCEPTION 2, ACOUSTICAL | | INSULATION INSTALLED BETWEEN A FINISHED FLOOR AND SOLID | | DECKING WITHOUT INTERVENING AIRSPACE SHALL BE ALLOWED | | TO HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 200. SEE | | 803.1.1, PROVIDE TEST DATA IN ACCORDANCE WITH ASTM E 84 | | OR UL 723. | | | | 2ND REVIEW, NOT PROVIDED. WE HAVE ON FILE A COPY OF A | | REPORT FOR ASTM E 84 FOR WHISPER MAT WITH TILE | | FLOORING, BUT WE DO NOT HAVE A REPORT FOR WHISPER MAT | | WITH LVT. | | | | UPON REQUEST, THIS CAN BE A PROVISO ITEM - TEST REPORTS | | ARE REQUIRED TO BE SUBMITTED, REVIEWED AND APPROVED | | PRIOR TO INSTALLATION. TO MY KNOWLEDGE THERE ARE AT | | THIS TIME ONLY TWO PRODUCTS WHICH HAVE FLAME SPREAD | | TEST WITHOUT TILE. IT IS POSSIBLE THAT THE PRODUCT | | PROPOSED DOES NOT HAVE A FLAME SPREAD TEST FOR | | COMBUSTIBLE FLOORING. DUE TO THE RESTRICTIVE NATURE OF | | THE PROVISO, IT IS RECOMMENDED THAT APPLICANT RESOLVE | | THIS ISSUE AT THIS TIME. IF A PROVISO IS REQUESTED, | | PLEASE ADVISE AS TO WHEN THE ITEM WILL BE ADDRESSED. | | | | IF A PROVISO IS REQUESTED, THE SPEC SHEETS SUBMITTED | | FOR WHISPER MAT CS SHOULD BE REMOVED BY APPLICANT. IF | | THAT IS NOT POSSIBLE, THEY WILL BE MARKED "VOID". | | | | 19-22. OK | | | | 22. GENERAL COMMENT, FBC 107, SOME FMEP COMMENTS ARE | | ALSO FBC B REQUIREMENTS. A BUILDING REVIEW ON THESE | | ITEMS WILL BE DONE UPON RESUBMITTAL. | | | | 23-26. OK | | | | 2ND REVIEW, RESPONSE LETTER DOES NOT ADDRESS THE | | FOLLOWING ITEMS AND PLANS NOT REVISED. IT APPEARS THAT | | "PLAN REVIEW IN PROGRESS" WERE UTILIZED AS FINAL | | BUILDING COMMENTS. PLEASE NOTE THAT SOME REVIEWERS, | | ESPECIALLY IF UNABLE TO COMPLETE A PLAN REVIEW IN A ONE | | OR TWO DAY SESSION, WILL UPDATE COMMENTS PERIODICALLY | | AND USE THIS LANGUAGE, USUALLY AT THE TOP OF THE | | REVIEW. MY APOLOGIES . . . | | | | 27. FBC 107, A3.1.11 AND OTHER SHEETS, ALUMINUM MESH IS | | SHOWN OVER THE GARAGE ALUMINUM AIR INTAKE LOUVER. DOES | | THIS INHIBIT AIR FLOW? | | | | 28. FBC B 603, "WOOD SLATS AT ROOF FASCIA" IS SHOWN; IT | | IS NOT CLEAR UNDER WHICH EXEMPTION THIS IS PROPOSED, | | REVISE PLAN TO CLARIFY. | | | | 29. FBC 107, 6-A6.4.1, A 2 HOUR HORIZONTAL SHAFT WALL | | SYSTEM IS SHOWN AND REFERS TO DETAILS 13 AND 14 ON | | A10.0.1. DETAIL 14 SPECS "1 HOUR RATED SHAFTWALL | | ASSEMBLIES". SHAFT IS TO BE 2 HOUR, A HORIZONTAL | | ASSEMBLY IS TO BE SPECIFIED RATHER THAN A WALL | | ASSEMBLY. PROVIDE LISTING WHICH ADDRESSES USE OF U415 | | UTILIZED IN A HORIZONTAL ORIENTATION OR REVISE DETAIL. | | | | 30. FBC B 1007, FBC A 207.1, GENERAL NOTE, REVISE PLAN | | TO STATE WHICH OF THE TWO OPTIONS IS ELECTED FOR | | ACCESSIBLE MEANS OF EGRESS (APPLICABLE TO ADA PORTION | | OF PROJECT ONLY). | | | | 31. FBC B 716, A1.1.1C AND A7.0.1, DOOR 105A IS IN A | | RATED WALL BUT LACKS FIRE RESISTANCE RATING, PLEASE | | REVISE OR CLARIFY. | | | | 32. FBC B 603, 2-A8.3.3 AND OTHER LOCATIONS, IPE WOOD | | IS PROPOSED. IT IS NOT CLEAR UNDER WHICH EXEMPTION THIS | | IS PROPOSED, REVISE PLAN TO CLARIFY. | | | | 33. FBC B 1008.1.10, A7.0.1, A1.5.1B AND OTHER SHEETS, | | DOORS SERVING A SPACE OF ASSEMBLY OCCUPANCY WITH AN | | OCCUPANT LOAD OF 50 OR MORE ARE TO BE PROVIDED WITH | | PANIC OR FIRE EXIT HARDWARE. SEE DOOR 542A, 112B, CHECK | | ALL. IT APPEARS THAT MEANS OF EGRESS FROM STAIRS 1, 2, | | AND 4 TO EXIT DISCHARGE SHOULD HAVE PANIC DEVICES. | | (THIS APPEARS TO BE DESIGNER'S INTENT AS MOST COMPLY.) | | | | 34. FBC B 501.2, ADDRESS IDENTIFICATION REQUIRED, | | PLEASE REVISE PLAN OR ADVISE WHERE THIS CAN BE LOCATED. | | | | 35. FBC B 505.2.1 EXCEPTION 2, FBC 403.4.4, COMPLIANCE | | IS NOT CLEAR; PLEASE ADVISE WHERE COMPLIANCE WITH FBC B | | 907.5.2.2 (VOICE/ALARM SYSTEMS) CAN BE FOUND, OR REVISE | | PLAN TO SHOW COMPLIANCE. PLEASE CONTACT ME IF YOU WISH | | TO DISCUSS. | | | | 36. FBC B 403.4, 907.2.13.1, 907.3.3, 907.3.4, | | AUTOMATIC SMOKE DETECTION TO BE IN ACCORDANCE WITH THIS | | SECTION. FIRE ALARM IS UNDER A SEPARATE PERMIT WHICH IS | | NOT REVIEWED BY BUILDING. PLEASE REVISE PLAN TO NOTE | | COMPLIANCE. | | | | 37. FBC B 403.5.3, COMPLIANCE NOT CLEAR, PLEASE ADVISE | | WHERE STAIRWAY DOOR LOCKING IS ADDRESSED, OR REVISE | | PLAN TO SHOW COMPLIANCE. | | | | 38. FBC B TABLE 705.8, CLARIFY HOW <15% WAS DETERMINED | | FOR THE WALL WHICH OPENS TO ALLOW HOTEL ACCESS. | | | | 39. FBC B 1603.1.4, I WAS UNABLE TO LOCATE WIND DESIGN | | CRITERIA, PLEASE ADVISE WHERE THIS CAN BE LOCATED OR | | REVISE TO INCLUDE. NOTE THAT VULT AND VASD ARE | | REQUIRED. | | | | 40. FBC B 1207, I WAS UNABLE TO LOCATE SLAB THICKNESS | | BETWEEN UNITS, ADVISE WHERE THIS CAN BE FOUND OR REVISE | | PLAN TO PROVIDE (TYPICALLY ON THE STRUCTURAL SHEETS). | | THIS INFORMATION IS REQUIRED FOR REVIEW OF THE FLOORING | | UNDERLAYMENT. | | | | 2ND REVIEW, RESPONSE LETTER STATES THAT THE SLAB IS 8", | | PLEASE ADVISE WHERE THIS CAN BE FOUND ON THE PLAN. | | | | 41. THRESHOLD REVIEW MUST BE ADDRESSED PRIOR TO PERMIT | | ISSUANCE. THRESHOLD STATEMENT ON THE PLAN IS REQUIRED | | PRIOR TO A BUILDING PASS REVIEW. THE SI AGREEMENT AND | | RESUMES MAY BE SENT AT ANY TIME VIA EMAIL. PLEASE | | PROVIDE AS A COMPLETE PACKAGE (ALL SIGNATURES, ALL | | RESUMES). | | | | 2ND REVIEW, THE THRESHOLD STATEMENT WAS ADDED TO ALL | | PLANS ON THE FOUNDATION PERMIT. WERE THE BUILDING PLANS | | ALSO UPDATED? PLEASE ADVISE WHERE THIS INFORMATION CAN | | BE LOCATED. PLEASE CONFIRM THAT BUILDING PLANS | | (17110075) ARE THE SAME AS ISSUED FOUNDATION PERMIT SO | | THERE ARE NO DISCREPANCIES. | | | | 42. FBC A FAIR HOUSING REQUIREMENT 2 ANSI 4.1-4.3.1, | | RECEPTION DESK IN RESIDENTS LOBBY, PROVIDE A DETAIL OR | | REQUEST THAT THIS BE A DEFERRED SUBMITTAL. | | | | 43-44. OK | | | | 45. THE DOCUMENT IN THE "EXPEDITE EMAIL" IS AN EMAIL | | FROM OWNER TO OUR DEPARTMENT. PLEASE REPLACE WITH | | DOCUMENT FROM INDIVIDUAL WHO IS AUTHORIZING EXPEDITED | | REVIEW WITH NO FEE, FBC 107. | | | | 46. OK | | | | 47. A "CONSTRUCTION DRAWING" ELEVATION CERTIFICATE IS | | RECOMMENDED AT THIS TIME TO AVOID CONCRETE POUR DELAYS | | A "BUILDING UNDER CONSTRUCTION" ELEVATION CERTIFICATE | | OR FORM BOARD SURVEY IS REQUIRED PRIOR TO CONCRETE | | POUR. THIS MAY BE SENT VIA EMAIL FOR PRELIMINARY REVIEW | | A "FINISHED CONSTRUCTION" ELEVATION CERTIFICATE IS | | REQUIRED PRIOR TO FINAL INSPECTION AND/OR C.O. AND/OR | | T.C.O. | | | | 48. OK | | | | 49. FBC B 603.1(15), A3.1.11 AND OTHER SHEETS, | | KRINKLGLAS, SHOWN ON VARIOUS PAGES, TO COMPLY WITH | | CHAPTER 26, SPEC SHEETS OR TEST REPORTS TO BE SUBMITTED | | PRIOR TO INSTALLATION. | | | | 50. THIS PARCEL APPEARS TO BE LOCATED IN A SPECIAL | | FLOOD HAZARD AREA: | | A "CONSTRUCTION DRAWING" ELEVATION CERTIFICATE IS | | RECOMMENDED AT THIS TIME TO AVOID FUTURE DELAYS | | (CORRECTIONS, IF APPLICABLE, WILL NOT DELAY PERMIT | | ISSUANCE) | | A "BUILDING UNDER CONSTRUCTION" ELEVATION CERTIFICATE | | OR FORM BOARD SURVEY IS REQUIRED PRIOR TO CONCRETE | | POUR. THIS MAY BE SENT VIA EMAIL FOR PRELIMINARY REVIEW | | A "FINISHED CONSTRUCTION" ELEVATION CERTIFICATE IS | | REQUIRED PRIOR TO FINAL INSPECTION AND/OR CO AND/OR | | TCO. | | | | 51. FBC B 2403.2, A9.5.3 AND OTHER SHEETS, A SEMI | | FRAMELESS SHOWER ENCLOSURE IS SHOWN. ENGINEERING MAY BE | | REQUIRED SUBJECT TO FIELD INSPECTOR'S DISCRETION. | | | | 52. THIS PERMIT WILL BE ISSUED WITH THE FOLLOWING | | PROVISOS: | | | | A. BARN DOORS TO MAINTAIN THE 25SF LOUVERS, A1.3.1 AND | | OTHER SHEETS UP TO 3RD FLOOR, FOR COMPLIANCE WITH FBC B | | 1029.1, OK PER RB. | | B. FLOOD MAP IN EFFECT AT TIME OF FOUNDATION PERMIT | | APPLICATION 1979 FIRMS + 1' FREEBOARD | | MINIMUM ELEVATION = 8.0' NGVD29 | | PROPOSED LOWEST FINISHED FLOOR ELEVATION = 9.0' NGVD29 | | C. SEPARATE PERMITS (APPLICATIONS, PLANS, AND FEES) | | REQUIRED FOR POOL, FIRE ALARM, FIRE SPRINKLER, LOW | | VOLTAGE, SIGNAGE, LANDSCAPING, ETC (EVERYTHING EXCEPT | | FOR BUILDING, MEP) FBC 107. | | D. DEFERRED SUBMITTALS REQUESTED BY ARCHITECT, SEE | | FOLLOWING LIST (MAY NOT BE A COMPLETE LIST); DOCUMENTS | | SHOWING COMPLIANCE ARE TO BE REVIEWED BY DESIGNER OF | | RECORD PRIOR TO SUBMITTAL (ARCHITECT OR ENGINEER FOR | | PRODUCT APPROVALS AND OTHER SPECIFICATION DOCUMENTS, | | STRUCTURAL ENGINEER OF RECORD APPROVAL AND REVIEW IS | | REQUIRED FOR DELEGATED ENGINEERING). SUBMITTAL, REVIEW | | AND APPROVAL ARE REQUIRED PRIOR TO INSTALLATION. | | COMPONENT & CLADDING PRODUCT APPROVALS (COMPLY WITH | | PRESSURES SHOWN ON SHEET S0.0.5) | | GLASS GUARDS DELEGATED ENGINEERING | | BALCONY ALUMINUM GUARDRAILS DELEGATED ENGINEERING | | POOL DECK GUARDRAILS DELEGATED ENGINEERING | | ALUCOBOND, PROVIDE PRODUCT APPROVALS AND SPEC SHEETS TO | | SHOW COMPLIANCE WITH FBC B 602.2, 1 | | E. A PRECONSTRUCTION MEETING IS REQUIRED BETWEEN KEN | | CONRAD, CHIEF BUILDING INSPECTOR, CONTRACTOR, AND SI | | PRIOR TO COMMENCEMENT. | | | | NEW COMMENT: | | | | 53. A SURVEY WAS PROVIDED. IS THIS A FINALIZED RECORDED | | PLAT, OR IS THE PLAT PENDING? IF PENDING, A RECORDED | | PLAT IS REQUIRED FOR ALL 6 PERMITS PRIOR TO ISSUANCE OF | | CO. THIS PROVISO WILL BE ADDED TO ALL AFFECTED PERMITS. | | IF THE PLAT IS FINALIZED, PLEASE PROVIDE A COPY OF THE | | RECORDED PLAT. | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2017-12-20 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2017-12-20 |
Time |
06:23 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2017-12-08 |
Time |
06:10 |
Sent To |
|
|
Notes |
2017-12-20 06:32:02 | ****CORRECTIONS**** | | | | SAMANTHA HILL | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6724 | | | | FBC = FLORIDA BUILDING CODE, 5TH EDITION (2014) | | FBC B = FBC BUILDING | | FBC EB = FBC EXISTING BUILDING | | FBC A = FBC ACCESSIBILITY | | FBC EC = FBC ENERGY CONSERVATION | | | | | | 1. SP1.0, FBC B TABLE 602, COMPLIANCE NOT CLEAR; REVISE | | PLAN TO SHOW DISTANCE TO STREET CENTERLINE. ONLY | | DISTANCE TO PROPERTY LINE IS SHOWN. | | | | 2. LS1.1, EXIT STRATEGY NOT CLEAR FROM CORRIDOR 113 | | THOUGH 103 RETAIL. SEE FBC B 1014.2. AS BUILDOUT FOR | | RETAIL HAS NOT BEEN ESTABLISHED AT THIS TIME, IT DOES | | NOT APPEAR POSSIBLE TO KNOW IF THIS AREA WILL BE FUTURE | | STORAGE FOR THE RETAIL. ALSO CORRIOR APPEARS TO SERVE | | OCCUPANTS UNRELATED TO THE RETAIL, SO DOES NOT APPEAR | | TO BE ACCESSORY TO ONE ANOTHER. | | | | 3. LS1.1, EXIT LIGHT TO THE NORTH OF OLIVE RETAIL 103 | | NORTHWEST CORNER, EXIT LIGHT POINTS NORTH. ANOTHER EXIT | | LIGHT POINTS LEFT, NOT CLEAR WHERE THAT DIRECTS THE | | OCCUPANT, FBC 107. | | | | 4. LS3.1, SHAFT WALL BETWEEN ST3 E03 AND 312 NOT CLEAR; | | 2 HOUR WALL NOT CLEAR BETWEEN STAIR, ELEVATOR, AND | | LOBBY. | | | | 5. A1.1.1, FBC A 405.2, RAMP APPEARS TO EXCEED 1:12 | | (8%) SLOPE (BUT SHEET A1.1.1A SHOWS THIS RAMP AS 1:12), | | REVISE AND CHECK ALL. | | | | 6. A1.1.1, FBC A 405.6, REVISE PLAN TO SHOW RAMP RUNS, | | OR REVISE TO INDICATE RISE FOR EACH RUN, OR PROVIDE | | SEPARATE DETAIL. | | | | 7. A1.1.2C, FBC A 405.7, REVISE PLAN TO SHOW LANDING | | DIMENSIONS. COMPLIANCE AT TOP OF RAMP (9A, 8.1A) IS NOT | | CLEAR, APPEARS TO HAVE TWO CHANGES OF DIRECTION. | | | | 8. A1.1.1, FBC A 405.9, REVISE PLAN TO SHOW EDGE | | PROTECTION PROPOSED. | | | | 9. A1.1,1, FBC 107, IT IS NOT CLEAR WHICH PARKING | | SPACES ARE DEDICATED TO THE RETAIL, HOTEL, AND WHICH | | ARE FOR RESIDENTS (ACCESSIBILITY VS FAIR HOUSING), | | REVISE PLAN TO SHOW COMPLIANCE. | | | | 10. A1.1.1, FBC 107, ACCESSIBLE PARKING SPACES ON THE | | EAST PORTION OF PARKING, IT APPEARS THAT THIS PORTION | | OF THE GARAGE IS TO SERVE THE HOTEL. REVISE PLAN TO | | CLARIFY AND IF NOT, CLARIFY ACCESSIBLE ROUTE AS IT DOES | | NOT APPEAR TO LEAD ANYWHERE IN THIS BUILDING. ALSO | | REVISE PLAN TO NOTE NUMBER OF PARKING SPACES DEDICATED | | TO HOTEL, NUMBER OF ACCESSIBLE SPACES, NUMBER OF VAN | | ACCESSIBLE (2 SHOWN). | | | | 11. A1.1.1, FBC A 208.2.4, INDICATE VAN PARKING FOR | | RETAIL SPACES. NOTE HEIGHT REQUIREMENT ON THE PLAN, OR | | PROVIDE A DETAIL. | | | | 12. A1.1.2C, FBC A 405.5, 9A, RAMP APPEARS TO BE SHOWN | | AS 3'4 3/8" WIDE, 36" REQUIRED, REVISE TO CLARIFY. | | | | 13. A1.2.1C AND OTHER SHEETS, FBC B 602.2, 1403.5, | | ALUCOBOND PROPOSED, PROVIDE SPEC SHEETS SHOWING | | COMPLIANCE. THIS MAY BE A PROVISO ITEM UPON REQUEST. | | | | 14. A3.1.13 AND OTHER SHEETS, FBC B 602.2, TERRACORP | | PROPOSED, PROVIDE SPEC SHEETS SHOWING COMPLIANCE. THIS | | MAY BE A PROVISO ITEM UPON REQUEST. | | | | 15. A3.1.14 AND OTHER SHEETS, FBC B 602.2, 1609, | | DECORATIVE MESH COLUMN ENCLOSURE PROPOSED, PROVIDE SPEC | | SHEETS AND PRODUCT APPROVAL OR ENGINEERING TO SHOW | | COMPLIANCE. THIS MAY BE A PROVISO ITEM UPON REQUEST. | | | | 16. A1.3.1 AND OTHER SHEETS UP TO 3RD FLOOR, FBC B | | 1029.1, SLIDING BARN DOORS ARE SHOWN ON SOME BEDROOMS | | WHICH DO NOT HAVE A WINDOW. I RECALL AN EMAIL ABOUT | | THIS ISSUE; WAS AN OFFICIAL RESPONSE PROVIDED AT THAT | | TIME? IF YES, PROVIDE EMAIL. IF NOT, PLEASE SEND | | RATIONALE VIA EMAIL. THIS IS TO BE RESOLVED PRIOR TO | | RESUBMITTAL. | | | | 17. A1.5.1, FBC 107, CORRIDOR LABELED WITH ??, REVISE | | (NEAR E11). | | | | 18. FLOORING UNDERLAYMENT TO COMPLY WITH THE FOLLOWING: | | | | A. FBC 1207.2, FLOOR/CEILING ASSEMBLIES SEPARATING | | DWELLING UNITS FROM EACH OTHER OR FROM PUBLIC OR | | SERVICE AREAS SHALL HAVE A SOUND TRANSMISSION CLASS | | (STC) OF NOT LESS THAN 50 (45 IF FIELD TESTED) FOR AIR | | BORNE NOISE WHEN TESTED IN ACCORDANCE WITH ASTM E 90. | | THE TEST REPORT CANNOT INCLUDE A DROPPED GYPSUM | | CEILING. PROVIDE A COPY OF THE TEST REPORT. | | | | B. FBC 1207.3, FLOOR/CEILING ASSEMBLIES BETWEEN | | DWELLING UNITS OR BETWEEN A DWELLING UNIT AND A PUBLIC | | OR SERVICE AREA WITHIN THE STRUCTURE SHALL HAVE AN | | IMPACT INSULATION CLASS (IIC) RATING OF NOT LESS THAN | | 50 (45 IF FIELD TESTED) WHEN TESTED IN ACCORDANCE WITH | | ASTM E 492. THE TEST REPORT CANNOT INCLUDE A DROPPED | | GYPSUM CEILING. PROVIDE A COPY OF THE TEST REPORT. | | | | C. FBC 603.1, ALLOWABLE MATERIALS IN NON COMBUSTIBLE | | BUILDINGS, SEE ITEM 2, EXCEPTION 2, ACOUSTICAL | | INSULATION INSTALLED BETWEEN A FINISHED FLOOR AND SOLID | | DECKING WITHOUT INTERVENING AIRSPACE SHALL BE ALLOWED | | TO HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 200. SEE | | 803.1.1, PROVIDE TEST DATA IN ACCORDANCE WITH ASTM E 84 | | OR UL 723. | | | | SUBMITTAL OF THE SPEC SHEETS AND TEST REPORTS MAY BE A | | DEFERRED SUBMITTAL UPON REQUEST. | | | | 19. FBC A FAIR HOUSING, ANSI 117.1 4.3, SOME DOORS DO | | NOT APPEAR TO COMPLY WITH DOORS IN A SERIES | | REQUIREMENT, 1ST FLOOR SOUTH OF ELEV #3, 5TH FLOOR AT | | STAIR #2, CHECK ALL. THIS COMMENT DOES NOT APPLY TO | | DOORS WHICH ARE ADJACENT BUT DO NOT SERVE AS "DOORS IN | | A SERIES" (FOR INSTANCE, STAIR #4 1ST FLOOR). | | | | 20. LS2.1, GENERATOR ROOM 204 HAS A DOOR ON SOUTH WALL, | | NOT CLEAR WHERE THIS LEADS | | | | 21. SEE NFIP REVIEW: | | | | FLOOD MAP IN EFFECT AT TIME OF FOUNDATION PERMIT | | APPLICATION 1979 FIRMS + 1' FREEBOARD | | MINIMUM ELEVATION = 8.0' NGVD29 | | PROPOSED LOWEST FINISHED FLOOR ELEVATION = 9.0' NGVD29 | | | | 22. GENERAL COMMENT, FBC 107, SOME FMEP COMMENTS ARE | | ALSO FBC B REQUIREMENTS. A BUILDING REVIEW ON THESE | | ITEMS WILL BE DONE UPON RESUBMITTAL. | | | | 23. FBC A FAIR HOUSING REQUIREMENT 2 ANSI 4.1-4.3.1, | | RECEPTION DESK IN RESIDENTS LOBBY, PROVIDE A DETAIL OR | | REQUEST THAT THIS BE A DEFERRED SUBMITTAL. | | | | 24. FBC A 503, A1.1.1B AND OTHER SHEETS, WILL A LOADING | | ZONE FOR THE HOTEL BE PROVIDED? REVISE PLAN TO INDICATE | | WHETHER OR NOT A LOADING ZONE WILL BE AVAILABLE, AND IF | | YES, REVISE PLAN TO SHOW COMPLIANCE WITH FBC A 503. | | | | 25. FBC A FAIR HOUSING, A1.9.1 AND OTHER SHEETS, | | REQUIREMENT 4, AN ACCESSIBLE ROUTE IS REQUIRED | | THROUGHOUT THE UNIT. SOME BALCONIES ARE NARROWER THAN | | THE REQUIRED ROUTE WIDTH OF 36". REVISE PLAN TO | | CLARIFY; EITHER PROVIDE A COMPLIANT ROUTE OR REVISE | | PLAN TO INDICATE THAT THESE AREAS ARE NOT INTENDED TO | | BE HABITABLE (JULIET BALCONY/BALCONET), IF THAT IS THE | | CASE. | | | | SLIDING GLASS DOOR CLEAR OPENING WIDTH HAS NOT BEEN | | REVIEWED AT THIS TIME PENDING ADDITIONAL INFORMATION. | | | | 26. FBC 107, 10-A8.3.1, SCUPPER SIZE NOT SHOWN. WILL | | SCUPPER INCLUDE A SCREEN? | | | | 27. FBC 107, A3.1.11 AND OTHER SHEETS, ALUMINUM MESH IS | | SHOWN OVER THE GARAGE ALUMINUM AIR INTAKE LOUVER. DOES | | THIS INHIBIT AIR FLOW? | | | | 28. FBC B 603, "WOOD SLATS AT ROOF FASCIA" IS SHOWN; IT | | IS NOT CLEAR UNDER WHICH EXEMPTION THIS IS PROPOSED, | | REVISE PLAN TO CLARIFY. | | | | 29. FBC 107, 6-A6.4.1, A 2 HOUR HORIZONTAL SHAFT WALL | | SYSTEM IS SHOWN AND REFERS TO DETAILS 13 AND 14 ON | | A10.0.1. DETAIL 14 SPECS "1 HOUR RATED SHAFTWALL | | ASSEMBLIES". SHAFT IS TO BE 2 HOUR, A HORIZONTAL | | ASSEMBLY IS TO BE SPECIFIED RATHER THAN A WALL | | ASSEMBLY. PROVIDE LISTING WHICH ADDRESSES USE OF U415 | | UTILIZED IN A HORIZONTAL ORIENTATION OR REVISE DETAIL. | | | | 30. FBC B 1007, FBC A 207.1, GENERAL NOTE, REVISE PLAN | | TO STATE WHICH OF THE TWO OPTIONS IS ELECTED FOR | | ACCESSIBLE MEANS OF EGRESS (APPLICABLE TO ADA PORTION | | OF PROJECT ONLY). | | | | 31. FBC B 716, A1.1.1C AND A7.0.1, DOOR 105A IS IN A | | RATED WALL BUT LACKS FIRE RESISTANCE RATING, PLEASE | | REVISE OR CLARIFY. | | | | 32. FBC B 603, 2-A8.3.3 AND OTHER LOCATIONS, IPE WOOD | | IS PROPOSED. IT IS NOT CLEAR UNDER WHICH EXEMPTION THIS | | IS PROPOSED, REVISE PLAN TO CLARIFY. | | | | 33. FBC B 1008.1.10, A7.0.1, A1.5.1B AND OTHER SHEETS, | | DOORS SERVING A SPACE OF ASSEMBLY OCCUPANCY WITH AN | | OCCUPANT LOAD OF 50 OR MORE ARE TO BE PROVIDED WITH | | PANIC OR FIRE EXIT HARDWARE. SEE DOOR 542A, 112B, CHECK | | ALL. IT APPEARS THAT MEANS OF EGRESS FROM STAIRS 1, 2, | | AND 4 TO EXIT DISCHARGE SHOULD HAVE PANIC DEVICES. | | (THIS APPEARS TO BE DESIGNER'S INTENT AS MOST COMPLY.) | | | | 34. FBC B 501.2, ADDRESS IDENTIFICATION REQUIRED, | | PLEASE REVISE PLAN OR ADVISE WHERE THIS CAN BE LOCATED. | | | | 35. FBC B 505.2.1 EXCEPTION 2, FBC 403.4.4, COMPLIANCE | | IS NOT CLEAR; PLEASE ADVISE WHERE COMPLIANCE WITH FBC B | | 907.5.2.2 (VOICE/ALARM SYSTEMS) CAN BE FOUND, OR REVISE | | PLAN TO SHOW COMPLIANCE. PLEASE CONTACT ME IF YOU WISH | | TO DISCUSS. | | | | 36. FBC B 403.4, 907.2.13.1, 907.3.3, 907.3.4, | | AUTOMATIC SMOKE DETECTION TO BE IN ACCORDANCE WITH THIS | | SECTION. FIRE ALARM IS UNDER A SEPARATE PERMIT WHICH IS | | NOT REVIEWED BY BUILDING. PLEASE REVISE PLAN TO NOTE | | COMPLIANCE. | | | | 37. FBC B 403.5.3, COMPLIANCE NOT CLEAR, PLEASE ADVISE | | WHERE STAIRWAY DOOR LOCKING IS ADDRESSED, OR REVISE | | PLAN TO SHOW COMPLIANCE. | | | | 38. FBC B TABLE 705.8, CLARIFY HOW <15% WAS DETERMINED | | FOR THE WALL WHICH OPENS TO ALLOW HOTEL ACCESS. | | | | 39. FBC B 1603.1.4, I WAS UNABLE TO LOCATE WIND DESIGN | | CRITERIA, PLEASE ADVISE WHERE THIS CAN BE LOCATED OR | | REVISE TO INCLUDE. NOTE THAT VULT AND VASD ARE | | REQUIRED. | | | | 40. FBC B 1207, I WAS UNABLE TO LOCATE SLAB THICKNESS | | BETWEEN UNITS, ADVISE WHERE THIS CAN BE FOUND OR REVISE | | PLAN TO PROVIDE (TYPICALLY ON THE STRUCTURAL SHEETS). | | THIS INFORMATION IS REQUIRED FOR REVIEW OF THE FLOORING | | UNDERLAYMENT. | | | | 41. INFORMATIONAL ONLY; THRESHOLD REVIEW MUST BE | | ADDRESSED PRIOR TO PERMIT ISSUANCE. THRESHOLD STATEMENT | | ON THE PLAN IS REQUIRED PRIOR TO A BUILDING PASS | | REVIEW. THE SI AGREEMENT AND RESUMES MAY BE SENT AT ANY | | TIME VIA EMAIL. PLEASE PROVIDE AS A COMPLETE PACKAGE | | (ALL SIGNATURES, ALL RESUMES). | | | | 42. FBC A FAIR HOUSING REQUIREMENT 2 ANSI 4.1-4.3.1, | | RECEPTION DESK IN RESIDENTS LOBBY, PROVIDE A DETAIL OR | | REQUEST THAT THIS BE A DEFERRED SUBMITTAL. | | | | 43. FBC A 503, A1.1.1B AND OTHER SHEETS, WILL A LOADING | | ZONE FOR THE HOTEL BE PROVIDED? REVISE PLAN TO INDICATE | | WHETHER OR NOT A LOADING ZONE WILL BE AVAILABLE, AND IF | | YES, REVISE PLAN TO SHOW COMPLIANCE WITH FBC A 503. | | | | 44. FBC A FAIR HOUSING, A1.9.1 AND OTHER SHEETS, | | REQUIREMENT 4, AN ACCESSIBLE ROUTE IS REQUIRED | | THROUGHOUT THE UNIT. SOME BALCONIES ARE NARROWER THAN | | THE REQUIRED ROUTE WIDTH OF 36". REVISE PLAN TO | | CLARIFY; EITHER PROVIDE A COMPLIANT ROUTE OR REVISE | | PLAN TO INDICATE THAT THESE AREAS ARE NOT INTENDED TO | | BE HABITABLE (JULIET BALCONY/BALCONET), IF THAT IS THE | | CASE. | | | | SLIDING GLASS DOOR CLEAR OPENING WIDTH HAS NOT BEEN | | REVIEWED AT THIS TIME PENDING ADDITIONAL INFORMATION. | | | | 45. THE DOCUMENT IN THE "EXPEDITE EMAIL" IS AN EMAIL | | FROM OWNER TO OUR DEPARTMENT. PLEASE REPLACE WITH | | DOCUMENT FROM INDIVIDUAL WHO IS AUTHORIZING EXPEDITED | | REVIEW WITH NO FEE, FBC 107. | | | | 46. THIS PERMIT WILL BE ISSUED WITH PROVISOS; PERMIT IS | | ISSUED AT APPLICANT'S RISK: | | | | . SEPARATE PERMITS (APPLICATIONS, PLANS, AND FEES) | | REQUIRED FOR POOL, FIRE ALARM, FIRE SPRINKLER, LOW | | VOLTAGE, SIGNAGE, LANDSCAPING, ETC (EVERYTHING EXCEPT | | FOR BUILDING, MEP) FBC 107. | | | | 47. A "CONSTRUCTION DRAWING" ELEVATION CERTIFICATE IS | | RECOMMENDED AT THIS TIME TO AVOID CONCRETE POUR DELAYS | | A "BUILDING UNDER CONSTRUCTION" ELEVATION CERTIFICATE | | OR FORM BOARD SURVEY IS REQUIRED PRIOR TO CONCRETE | | POUR. THIS MAY BE SENT VIA EMAIL FOR PRELIMINARY REVIEW | | A "FINISHED CONSTRUCTION" ELEVATION CERTIFICATE IS | | REQUIRED PRIOR TO FINAL INSPECTION AND/OR C.O. AND/OR | | T.C.O. | | | | 48. THE FOLLOWING ITEMS ARE DEFERRED SUBMITTALS (LIST | | MAY NOT BE COMPLETE). DOCUMENTS SHOWING COMPLIANCE ARE | | TO BE REVIEWED BY DESIGNER OF RECORD PRIOR TO SUBMITTAL | | (ARCHITECT OR ENGINEER FOR PRODUCT APPROVALS, | | STRUCTURAL ENGINEER OF RECORD FOR DELEGATED | | ENGINEERING). SUBMITTAL, REVIEW AND APPROVAL ARE | | REQUIRED PRIOR TO INSTALLATION. | | COMPONENT & CLADDING PRODUCT APPROVALS (COMPLY WITH | | PRESSURES SHOWN ON SHEET S0.0.5) | | GLASS GUARDS DELEGATED ENGINEERING | | BALCONY ALUMINUM GUARDRAILS DELEGATED ENGINEERING | | POOL DECK GUARDRAILS DELEGATED ENGINEERING | | | | 49. FBC B 603.1(15), A3.1.11 AND OTHER SHEETS, | | KRINKLGLAS, SHOWN ON VARIOUS PAGES, TO COMPLY WITH | | CHAPTER 26, SPEC SHEETS OR TEST REPORTS TO BE SUBMITTED | | PRIOR TO INSTALLATION. | | | | 50. THIS PARCEL APPEARS TO BE LOCATED IN A SPECIAL | | FLOOD HAZARD AREA: | | A "CONSTRUCTION DRAWING" ELEVATION CERTIFICATE IS | | RECOMMENDED AT THIS TIME TO AVOID FUTURE DELAYS | | (CORRECTIONS, IF APPLICABLE, WILL NOT DELAY PERMIT | | ISSUANCE) | | A "BUILDING UNDER CONSTRUCTION" ELEVATION CERTIFICATE | | OR FORM BOARD SURVEY IS REQUIRED PRIOR TO CONCRETE | | POUR. THIS MAY BE SENT VIA EMAIL FOR PRELIMINARY REVIEW | | A "FINISHED CONSTRUCTION" ELEVATION CERTIFICATE IS | | REQUIRED PRIOR TO FINAL INSPECTION AND/OR CO AND/OR | | TCO. | | | | 51. FBC B 2403.2, A9.5.3 AND OTHER SHEETS, A SEMI | | FRAMELESS SHOWER ENCLOSURE IS SHOWN. ENGINEERING MAY BE | | REQUIRED SUBJECT TO FIELD INSPECTOR'S DISCRETION. | | |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
3 |
Status |
P |
Date |
2018-05-06 |
|
|
Cont ID |
|
Sent By |
jpearson |
Date |
2018-05-06 |
Time |
08:38 |
Rev Time |
0.00 |
Received By |
jpearson |
Date |
2018-05-06 |
Time |
08:38 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
F |
Date |
2018-02-13 |
|
|
Cont ID |
|
Sent By |
jpearson |
Date |
2018-02-13 |
Time |
15:48 |
Rev Time |
0.00 |
Received By |
jpearson |
Date |
2018-02-08 |
Time |
06:47 |
Sent To |
|
|
Notes |
2018-02-13 14:50:08 | CODES IN EFFECT: | | FBC = FLORIDA BUILDING CODE 2014 5TH EDITION | | FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2014 | | 5TH EDITION | | FBC RE = FLORIDA RESIDENTIAL CODE 2014 5TH EDITION | | NEC = NFPA 70 2011 EDITION, NATIONAL ELECTRICAL CODE | | FS = FLORIDA STATUTES | | | | ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW. | | | | PREVIOUS COMMENTS THAT HAVE BEEN ADDRESSED | | SATISFACTORILY HAVE BEEN NOTED AS ADDRESSED. ITEMS | | REMAINING HAVE FURTHER COMMENTS IN PARENTHESES. NEW | | COMMENTS FOLLOW THE PREVIOUS COMMENTS. | | | | 1) ADDRESSED. | | 2) ADDRESSED. | | 3) ADDRESSED. | | 4) ADDRESSED. | | 5) ADDRESSED. | | 6) ADDRESSED. | | 7) ADDRESSED. | | 8) ADDRESSED. | | 9) ADDRESSED. | | 10) ADDRESSED. | | 11) ADDRESSED. | | 12) ADDRESSED. | | 13) ADDRESSED. | | 14) ADDRESSED. | | 15) ADDRESSED. | | 16) ADDRESSED. | | 17) ADDRESSED. | | 18) ADDRESSED. | | 19) E4.0.0 PROVIDE SIGNAGE DETAILS FOR NUMBER OF | | SERVICE DISCONNECTS. IT APPEARS THAT THERE ARE TWO | | SERVICES IN QUESTION, A 120/208 SERVICE, AND A 277/480 | | SERVICE. PRIOR TO PLAN APPROVAL, A CORRECT | | IDENTIFICATION OF EACH SERVICE AND THE CORRESPONDING | | MAINS WILL NEED TO BE PROVIDED, WITH A MAXIMUM OF SIX | | SERVICE DISCONNECTS FOR EACH SERVICE PERMITTED. FIRE | | PUMP SERVICE WILL NEED TO BE INCLUDED AS ONE OF THE | | MAINS. NEC 230.2(E), 230.70(B), 230.71 (I SEE THE MAINS | | HAVE BEEN RENUMBERED, BUT I ALSO REQUESTED THE SIGNAGE | | DETAILS. PROVIDE LOCATIONS OF SIGNS FOR SERVICE AND THE | | DETAIL OF THE SIGNS ON PLAN. FBC 107.2.1 NEC 230.2) | | 20) E4.0.0 PROVIDE FULL LOAD CURRENT DETAIL OF FIRE | | PUMP MOTOR, AND ANY ADDITIONAL MOTORS OR EQUIPMENT | | ASSOCIATED, TO VERIFY CONDUCTOR SIZE FEEDING THIS | | EQUIPMENT IS ADEQUATE. NEC 695.6(B), NEC 110.3, 695.10 | | (I SEARCHED THE FIRE PROTECTION PLANS AND COULD NOT | | FIND THE SPECIFICATIONS THAT YOU STATED IN THE | | RESPONSE. PROVIDE AS PREVIOUSLY REQUESTED.) | | 21) E4.0.0 PROVIDE SPEC SHEETS FOR BUS DUCT SYSTEMS. | | NEC 110.3 (DEFERRED SUBMITTAL) | | 22) ADDRESSED. | | 23) ADDRESSED. | | 24) E5.0.0 IT APPEARS THAT PANELS MSB1, MSB2, MSB3 ARE | | MAIN LUG ONLY AND HAVE CAPACITY TO HAVE MORE THAN ONE | | MAIN BREAKER, WHICH WOULD ALLOW THE SERVICE TO EXCEED | | THE MAXIMUM NUMBER OF DISCONNECTS. PROVIDE | | CLARIFICATION. PROVIDE SPEC SHEETS FOR SWITCHGEAR. NEC | | 110.3, 230.71, 230.72; FBC 107.2.1 (AS THIS WILL AFFECT | | THE NUMBER OF MAINS, THIS INFORMATION IS REQUIRED AS | | PREVIOUSLY REQUESTED.) | | 25) PROVIDE AVAILABLE SHORT CIRCUIT CALCULATION FROM | | POWER COMPANY AND TO PANELS TO CONFIRM THE STATED AIC | | RATING OF PANELS IS ADEQUATE. NEC 110.9, 110.10 | | (REQUIRED FOR MARKING OF PANELS PER NEC 110.16 AND | | 110.24. IF YOU ARE COMFORTABLE WITH THE RATINGS OF THE | | EQUIPMENT, WE WILL ACCEPT THIS LETTER AND CALCULATIONS | | AS A DEFERRED SUBMITTAL WITH THE UNDERSTANDING THAT | | THIS MUST BE PROVIDED BEFORE ANY INSPECTIONS. PROVIDE | | NOTE ON PLAN TO THIS EFFECT.) | | 26) ADDRESSED. | | 27) ADDRESSED. | | 28) E5.0.2 IT APPEARS THAT PANELS EM AND EMG ARE MAIN | | LUG ONLY AND HAVE CAPACITY TO HAVE MORE THAN ONE MAIN | | BREAKER, WHICH WOULD ALLOW THE SERVICE TO EXCEED THE | | MAXIMUM NUMBER OF DISCONNECTS. PROVIDE CLARIFICATION. | | PROVIDE SPEC SHEETS FOR SWITCHGEAR. NEC 110.3, 230.71, | | 230.72; FBC 107.2.1 (AS THIS WILL AFFECT THE NUMBER OF | | MAINS, THIS INFORMATION IS REQUIRED AS PREVIOUSLY | | REQUESTED.) | | 29) E5.0.2 PANEL GEQH SHOWS A CIRCUIT FOR THE "JOCKEY | | PUMP". IS THIS PUMP ASSOCIATED WITH FIRE PUMP | | EQUIPMENT, OR SOMETHING ELSE? JOCKEY PUMP FOR FIRE PUMP | | EQUIPMENT MUST BE FED FROM SAME SERVICE AS THE FIRE | | PUMP. CLARIFY AND/OR CORRECT. FBC 107.2.1; NEC | | 695.4(B)(3) (RESPONSE TO THIS WAS CONFUSING AND STATED: | | "JOCKEY PUMP SEPARATE FROM FIRE PUMP CONTROLLER." | | SEPARATE AS IN SEPARATE LOCATION, OR SEPARATE SYSTEM. | | WHAT IS THIS JOCKEY PUMP FOR? IF IT IS PART OF THE FIRE | | PUMP SYSTEM, IT WILL NEED TO BE FED FROM THE FIRE PUMP | | CONTROLLER. PROVIDE MORE CLARIFICATION.) | | 30) ADDRESSED. | | 31)ADDRESSED. | | 32) ADDRESSED. | | 33) PROVIDE GRAPH/CALCULATION OF LIGHTING POWER | | ALLOWANCES PER THE FBC ENERGY CODE IN RELATION TO THE | | PROPOSED LIGHTING LOAD TO SHOW COMPLIANCE. FBC EC 405.5 | | (RESPONSE LETTER STATED THIS WAS PROVIDED, BUT I COULD | | NOT FIND ON PLAN. PROVIDE LOCATION.) | | 34) ADDRESSED. | | 35) ADDRESSED. | | | | NEW COMMENTS: | | | | 36) PANEL MSB1 SHOULD HAVE A CLEARANCE OF 72" BASED ON | | THE FACT THAT THERE IS ONLY ONE MEANS OF EGRESS FOR THE | | ELECTRICAL ROOM. IT APPEARS THAT PANEL MSB3 INVADES | | THIS SPACE AND MSB1 ONLY HAS APPROXIMATELY 59" OF | | CLEARANCE. PROVIDE CORRECTION. NEC 110.26(C)(2) | | 37) SHEET E3.0.1, DETAIL 6, IT APPEARS THAT THE 1200 | | AMP MAINS DO NOT HAVE THE REQUIRED CLEARANCE. PROVIDE | | CORRECTION. NEC 110.26(C)(2) | | | | END OF COMMENTS. | | | | PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN | | RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES | | INTO THE ORIGINAL SUBMITTAL AND REMOVE OR VOID THE | | PREVIOUSLY REVIEWED SHEETS. | | | | SINCERELY, | | | | JOHN PEARSON | | ELECTRICAL PLANS EXAMINER | | 561-805-6746 | | [email protected] | | |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
F |
Date |
2017-12-06 |
|
|
Cont ID |
|
Sent By |
jpearson |
Date |
2017-12-06 |
Time |
08:19 |
Rev Time |
0.00 |
Received By |
jpearson |
Date |
2017-12-06 |
Time |
08:18 |
Sent To |
|
|
Notes |
2017-12-06 08:18:56 | CODES IN EFFECT: | | FBC = FLORIDA BUILDING CODE 2014 5TH EDITION | | FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2014 | | 5TH EDITION | | FBC RE = FLORIDA RESIDENTIAL CODE 2014 5TH EDITION | | NEC = NFPA 70 2011 EDITION, NATIONAL ELECTRICAL CODE | | FS = FLORIDA STATUTES | | | | ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW. | | | | 1) E1.1.1 BE ADVISED THAT FIRE ALARM, LOW VOLTAGE | | SYSTEMS, LIGHTNING PROTECTION, GENERATORS, COMMERCIAL | | HOOD SYSTEMS, SIGNS, SITE LIGHTING, AND SWIMMING POOLS | | (WHERE APPLICABLE) ARE NOT INCLUDED IN THE SCOPE OF | | THIS PLAN REVIEW. PROVIDE A BLOCK NOTE INDICATING THE | | REQUIRED SEPARATE PERMITS AND DATA SPECIFICATION SHEET | | SUBMITTALS FOR ANY OF THESE SYSTEMS PRESENT. FBC 105.1, | | 107.2.1 | | 2) E1.1.1A MAIN SWITCHGEAR ROOM DOES NOT SHOW AUTOMATIC | | LIGHTING CONTROL NEEDED PER FBC EC 405.2.2 PROVIDE | | CORRECTION. | | 3) E1.1.1B EMERGENCY SWITCH GEAR ROOM, TV/PHONE ROOM, | | BACKFLOW ROOM, AND FIRE PUMP ROOM DO NOT SHOW AUTOMATIC | | LIGHTING CONTROL NEEDED PER FBC EC 405.2.2 PROVIDE | | CORRECTION. | | 4) E1.2.1A PROVIDE AUTOMATIC LIGHTING CONTROL PER FBC | | EC 405.2.2 FOR GENERATOR ROOM. ALSO, HOW ARE PARKING | | GARAGE LIGHTS CONTROLLED? FBC 107.2.1 | | 5) E1.3.1C PROVIDE AUTOMATIC LIGHTING CONTROL PER FBC | | EC 405.2.2 FOR METER ROOM. | | 6) E1.4.1A PROVIDE AUTOMATIC LIGHTING CONTROL PER FBC | | EC 405.2.2 FOR EQUIPMENT ROOM THAT HAS CU-5-1, CU-5-2, | | CU-4-3, AND CU-4-4. | | 7) E1.4.1C PROVIDE AUTOMATIC LIGHTING CONTROL PER FBC | | EC 405.2.2 FOR EQUIPMENT ROOM THAT HAS RETAIL CU?S. | | 8) E1.5.1A PROVIDE AUTOMATIC LIGHTING CONTROL PER FBC | | EC 405.2.2 FOR CLUB ROOM, AND OUTDOOR AREAS. | | 9) E1.5.1B PROVIDE AUTOMATIC LIGHTING CONTROL PER FBC | | EC 405.2.2 FOR ELECTRICAL CLOSET. | | 10) E1.6.1B PROVIDE AUTOMATIC LIGHTING CONTROL PER FBC | | EC 405.2.2 FOR ELECTRICAL CLOSET. | | 11) E1.6.1C PROVIDE AUTOMATIC LIGHTING CONTROL PER FBC | | EC 405.2.2 FOR ELECTRICAL CLOSET. | | 12) E1.6.1D PROVIDE AUTOMATIC LIGHTING CONTROL PER FBC | | EC 405.2.2 FOR ELECTRICAL CLOSET. | | 13) E1.11.1A ALL EXTERIOR WP RECEPTACLES NEED GFCI | | PROTECTION. PROVIDE CORRECTION. NEC 210.8 ALSO, SEE NO | | AUTOMATIC LIGHTING CONTROL PER FBC EC 405.2.2 FOR | | RESTROOMS OR ELEVATOR CLOSET LIGHT (RH-2). HOW ARE | | EXTERIOR LIGHTS CONTROLLED? FBC 107.2.1 | | 14) E1.11.1B PROVIDE AUTOMATIC LIGHTING CONTROL PER FBC | | EC 405.2.2 FOR ELECTRICAL CLOSET. | | 15) E1.11.1D PROVIDE AUTOMATIC LIGHTING CONTROL PER FBC | | EC 405.2.2 FOR ELECTRICAL AND ELEVATOR CLOSET. | | 16) E2.1.1 DINING ROOM RECEPTACLES AND LIGHTING ARE NOT | | PERMITTED TO BE ON SAME CIRCUIT. PROVIDE CORRECTION. | | NEC 210.52(B)(2) | | 17) E2.13.1 DINING ROOM RECEPTACLES AND LIGHTING ARE | | NOT PERMITTED TO BE ON SAME CIRCUIT. PROVIDE | | CORRECTION. NEC 210.52(B)(2) | | 18) E2.15.1 DINING ROOM RECEPTACLES AND LIGHTING ARE | | NOT PERMITTED TO BE ON SAME CIRCUIT. PROVIDE | | CORRECTION. NEC 210.52(B)(2) | | 19) E4.0.0 PROVIDE SIGNAGE DETAILS FOR NUMBER OF | | SERVICE DISCONNECTS. IT APPEARS THAT THERE ARE TWO | | SERVICES IN QUESTION, A 120/208 SERVICE, AND A 277/480 | | SERVICE. PRIOR TO PLAN APPROVAL, A CORRECT | | IDENTIFICATION OF EACH SERVICE AND THE CORRESPONDING | | MAINS WILL NEED TO BE PROVIDED, WITH A MAXIMUM OF SIX | | SERVICE DISCONNECTS FOR EACH SERVICE PERMITTED. FIRE | | PUMP SERVICE WILL NEED TO BE INCLUDED AS ONE OF THE | | MAINS. NEC 230.2(E), 230.70(B), 230.71 | | 20) E4.0.0 PROVIDE FULL LOAD CURRENT DETAIL OF FIRE | | PUMP MOTOR, AND ANY ADDITIONAL MOTORS OR EQUIPMENT | | ASSOCIATED, TO VERIFY CONDUCTOR SIZE FEEDING THIS | | EQUIPMENT IS ADEQUATE. NEC 695.6(B), NEC 110.3, 695.10 | | 21) E4.0.0 PROVIDE SPEC SHEETS FOR BUS DUCT SYSTEMS. | | NEC 110.3 | | 22) E4.0.0 DRAWING KEY NOTE # 5 REFERENCES NEC 700.8, | | WHICH DOES NOT EXIST IN THE 2011 NEC. PROVIDE | | CORRECTION. NEC 700.7 | | 23) E4.0.0 FEEDER SCHEDULE DOES NOT SHOW ALL FEEDERS ON | | RISER DIAGRAM. PROVIDE DETAILS FOR ALL FEEDERS. NEC | | 215.5; FBC 107.2.1 | | 24) E5.0.0 IT APPEARS THAT PANELS MSB1, MSB2, MSB3 ARE | | MAIN LUG ONLY AND HAVE CAPACITY TO HAVE MORE THAN ONE | | MAIN BREAKER, WHICH WOULD ALLOW THE SERVICE TO EXCEED | | THE MAXIMUM NUMBER OF DISCONNECTS. PROVIDE | | CLARIFICATION. PROVIDE SPEC SHEETS FOR SWITCHGEAR. NEC | | 110.3, 230.71, 230.72; FBC 107.2.1 | | 25) PROVIDE AVAILABLE SHORT CIRCUIT CALCULATION FROM | | POWER COMPANY AND TO PANELS TO CONFIRM THE STATED AIC | | RATING OF PANELS IS ADEQUATE. NEC 110.9, 110.10 | | 26) E5.0.1 PANEL BL CIRCUIT 47,49, AND PANEL RTH | | CIRCUIT 17, SHOW OUTDOOR LIGHTING BEING FED VIA | | PHOTOCELL. FBC ENERGY STATES: ?LIGHTING NOT DESIGNATED | | FOR DUSK-TO-DAWN OPERATION SHALL BE CONTROLLED BY | | EITHER A COMBINATION OF A PHOTOSENSOR AND A TIME | | SWITCH, OR AN ASTRONOMICAL TIME SWITCH. LIGHTING | | DESIGNATED FOR DUSK-TO-DAWN OPERATION SHALL BE | | CONTROLLED BY AN ASTRONOMICAL TIME SWITCH OR A | | PHOTOSENSOR.? CLARIFY WHAT TYPE OF LOAD THIS IS. FBC | | 107.2.1; FBC EC 405.2.4 | | 27) E5.0.1 NO LOAD CALCULATION OR PANEL SCHEDULES | | PROVIDED FOR PANEL MSB5. IN PANEL SCHEDULE FOR PANEL | | RTH, PLAN SHOWS THIS BEING FED FROM MSB4, BUT RISER | | DIAGRAM SHOWS IT BEING FED FROM MSB5. CURRENTLY, LOAD | | CALCULATION FOR MSB4 DOES NOT INCLUDE PANEL RTH. | | CLARIFY AND/OR CORRECT. PROVIDE ALL DETAILS FOR MSB5. | | HOW ARE LOADS FOR RETAIL AREAS CALCULATED? FBC 107.2.1; | | NEC 215.5, 408.4 | | 28) E5.0.2 IT APPEARS THAT PANELS EM AND EMG ARE MAIN | | LUG ONLY AND HAVE CAPACITY TO HAVE MORE THAN ONE MAIN | | BREAKER, WHICH WOULD ALLOW THE SERVICE TO EXCEED THE | | MAXIMUM NUMBER OF DISCONNECTS. PROVIDE CLARIFICATION. | | PROVIDE SPEC SHEETS FOR SWITCHGEAR. NEC 110.3, 230.71, | | 230.72; FBC 107.2.1 | | 29) E5.0.2 PANEL GEQH SHOWS A CIRCUIT FOR THE ?JOCKEY | | PUMP?. IS THIS PUMP ASSOCIATED WITH FIRE PUMP | | EQUIPMENT, OR SOMETHING ELSE? JOCKEY PUMP FOR FIRE PUMP | | EQUIPMENT MUST BE FED FROM SAME SERVICE AS THE FIRE | | PUMP. CLARIFY AND/OR CORRECT. FBC 107.2.1; NEC | | 695.4(B)(3) | | 30) E5.0.3 PANEL REQHN IS LABELED AS ?SECTION 2 OF 2?. | | RISER DIAGRAM ONLY SHOWS THIS PANEL IN ONE LOCATION AND | | WITH 1 SECTION. NO OTHER PANEL SCHEDULE EXIST FOR | | ?SECTION 1?. CLARIFY AND/OR CORRECT. FBC 107.2.1 | | 31) E5.0.4, E5.0.5, E5.0.6 PROVIDE AFCI PROTECTION PER | | CODE. (MAYBE THAT?S WHAT THE NOTES ABOVE ARE FOR?) NEC | | 210.12 | | 32) E5.0.4, E5.0.5, E5.0.6 PANEL SCHEDULES SHOW THE | | WATER HEATER ON A 30 AMP BREAKER. STANDARD WATER | | HEATERS WITH A 4500 WATT ELEMENT DRAW 16.25 AMPS ON 208 | | VOLTS, MULTIPLIED TIMES 1.25 EQUALS 20.31 AMPS. THE | | NEXT HIGHEST SIZE IS 25 AMPS. PROVIDE CORRECTION. NEC | | 422.13 | | 33) PROVIDE GRAPH/CALCULATION OF LIGHTING POWER | | ALLOWANCES PER THE FBC ENERGY CODE IN RELATION TO THE | | PROPOSED LIGHTING LOAD TO SHOW COMPLIANCE. FBC EC 405.5 | | 34) PROVIDE NOTE THAT LIGHTING IN CLOSETS TO COMPLY | | WITH NEC 410.16. | | 35) PROVIDE NOTE THAT LIGHTING IN DAMP LOCATIONS TO | | COMPLY WITH NEC 410.10. | | | | END OF COMMENTS. | | | | PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN | | RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES | | INTO THE ORIGINAL SUBMITTAL AND REMOVE OR VOID THE | | PREVIOUSLY REVIEWED SHEETS. | | | | SINCERELY, | | | | JOHN PEARSON | | ELECTRICAL PLANS EXAMINER | | 561-805-6746 | | [email protected] | | |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
3 |
Status |
P |
Date |
2018-05-31 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2018-05-31 |
Time |
15:49 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2018-05-27 |
Time |
14:54 |
Sent To |
|
|
Notes |
2018-05-31 15:49:46 | OK PER MG | | | 2018-05-27 14:54:28 | SENT EMAIL TO M.G. 5/26 | | |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
2 |
Status |
F |
Date |
2018-03-17 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2018-03-17 |
Time |
14:16 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2018-03-17 |
Time |
14:15 |
Sent To |
|
|
Notes |
2018-03-17 14:16:16 | CONTACT ENGINEERING DEPARTMENT AND SUBMIT APPLICATION | | TO ENGINEERING | | | | HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR | | MS,-PERMITS-APPLICATIONS |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
1 |
Status |
F |
Date |
2017-12-13 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2017-12-13 |
Time |
10:04 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2017-12-13 |
Time |
10:04 |
Sent To |
|
|
Notes |
2017-12-13 10:06:01 | CONTACT ENGINEERING DEPARTMENT AND SUBMIT APPLICATION | | TO ENGINEERING | | | | HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR | | MS,-PERMITS-APPLICATIONS |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
3 |
Status |
P |
Date |
2018-05-31 |
|
|
Cont ID |
|
Sent By |
pleduc |
Date |
2018-05-31 |
Time |
|
Rev Time |
0.00 |
Received By |
pleduc |
Date |
2018-04-16 |
Time |
13:58 |
Sent To |
|
|
Notes |
2018-05-04 15:29:12 | THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC, | | FIRE MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | PLEASE CONSIDER THE FOLLOWING AS PROVISO: | | | | THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED | | AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE | | PROVISO COMMENTS WILL RESULT IN A FAILED FIRE | | INSPECTION. | | | | | | 1) THE GRILLS SHALL BE 10' FROM COMBUSTIBLES INCLUDING | | LANDSCAPE MATERIAL AND SHALL BE USED IN ACCORDANCE | | WITHIN THE RECOMMENDATIONS OF THE MANUFACTURER. | | | | MANUFACTURERS SPECS SHALL BE SUBMITTED FOR FIRE MARSHAL | | APPROVAL PRIOR TO INSTALLATON TO ENSURE COMPLIANCE. | | | | CLOSE COORDINATION WITH THE OFFICE OF THE FIRE MARSHAL | | TO ADDRESS THIS ISSUE. | | | | | | PETER LEDUC | | FIRE MARSHAL | | 561-804-4709 | | [email protected] | | |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
2 |
Status |
F |
Date |
2018-02-06 |
|
|
Cont ID |
|
Sent By |
pleduc |
Date |
2018-02-06 |
Time |
|
Rev Time |
0.00 |
Received By |
pleduc |
Date |
2018-02-02 |
Time |
15:39 |
Sent To |
|
|
Notes |
2018-02-06 14:30:07 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE | | MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | | | THE COMMENTS POSTED BY WESLEY JOLIN HAVE BEED ADDRESSED | | EXCEPT FOR THOSE REGARDING THE EXTERIOR BBQ GRILLS. | | | | THE USE OF BBQ GRILLS ON THE DECK OF A HIGH RISE | | BUILDING IS NOT TAKEN LIGHTLY BY THIS OFFICE. THERE ARE | | VARIOUS CONCERNS RELATING TO THE SAFE USE OF NG, LEAK | | DETECTION/VENTILATION, EMERGENCY SHUTOFF, SMOKE | | GENERATION OF EXCESSIVE FATTY PRODUCTS, MISUSE, | | LOCATION OF NEARBY COMBUSTIBLES (INCLUDING LANDSCAPE), | | POSTING OF USE, SHUTOFF, AND LIGHTING | | INSTRUCTIONS,ETC,. | | | | THIS OFFICE IS NOT AGAINST THE RECREATIONAL USE OF | | GRILLS IN THESE AREAS; HOWEVER, IT MUST BE DONE WITH | | EXTENSIVE PLANNING AND CONTROL TO ELIMINATE OR REDUCE | | AS MANY PREVENTABLE FACTOR FACTORS AS POSSIBLE. | | | | IT IS THIS WITH MINDSET THAT THESE COMMENTS ARE POSTED | | GOING FORWARD. | | | | IT IS IMPERATIVE AND OF THE UTMOST PRIORITY THAT THE | | SAFETY OF THE TENANTS AND VISITORS AND THE SAFETY OF | | THIS BUILDING THAT WE WORK TO FIND THAT SAFEST LOCATION | | AND PROCEDURES FOR THE USE OF THESE BBQ GRILLS. | | | | | | 1) COMMENT # 4 - INDICATES THAT A GRILL WAS MOVED TO AN | | ALTERANTE POCATION. THIS NEW LOCATION IS ONLY SHOWN ON | | SHEET A 9.75.2, ALL OTHER RELATED SHEETS IT REMIANS. | | | | PLEASE CORRECT ALL SHEETS TO AVOID CONFUSION. | | | | | | | | 2) COMMENT # 4 - ONLY INDICATES THE RELOCATION OF | | ONE(1) GRILL. TWO(2) OTHER GRILLS REMAIN IN THE SAME | | LOCATION THAT APPEAR TO BE WITHIN 10FT OF THE "LINE OF | | BALCONY ABOVE". | | | | PLEASE REVIEW AND CORRECT. | | | | | | | | 3) SHEET A 9.76.1 - THERE IS AN INDICATION OF "STAND | | ALONE GRILL" IN TWO (2) LOCATIONS. PLEASE DEFINE THIS | | TERM. | | | | PLEASE BEAR IN MIND THAT LP TANKS SHALL NOT BE USED IN | | OR ON THIS AREA, OR STORED AT ANY LOCATION. | | | | | | | | 4) THERE ARE NO CLEAR INDICATIONS THAT I WAS ABLE TO | | FIND SHOWING THE INSTALLATION OF PORTABLE FIRE | | EXTINGUISHERS AT ANY OF THE LOCATION NOTED ABOVE. | | | | PLEASE PROVIDE DETAILS. | | | | | | 5) I AM AVAILBLE TO MEET AND REVIEW ANY PROOSED NEW | | LOCATIONS OR DISCUSS ANY CONCERNS. IN AN EFFORT TO SAVE | | TIME AND ENERGY, PLEASE ALSO USE MY EMAIL ADDRESS TO | | SEND ANY PDF'S OR QUESTIONS. | | | | | | | | 6) ADDITIONALLY, IN AN EFFORT TO MOVE THIS PROJECT | | ALONG, I AM ALSO OPEN TO PROVISING THESE COMMENTS | | SHOULD WE AGREE TO ADDRESS THEM AND THEN REVISING | | DOCUMENTS TO REFLECT CHANGES. | | | | | | 7) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET | | REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE | | ABOVE. | | | | | | | | 8) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE | | RE-SUBMITTAL OF THE ABOVE. | | | | | | PETER LEDUC | | FIRE MARSHAL | | 561-804-4709 | | [email protected] | | |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
1 |
Status |
F |
Date |
2017-12-06 |
|
|
Cont ID |
|
Sent By |
wjolin |
Date |
2017-12-06 |
Time |
12:18 |
Rev Time |
0.00 |
Received By |
wjolin |
Date |
2017-11-29 |
Time |
09:27 |
Sent To |
|
|
Notes |
2017-11-29 09:56:17 | 290 NORTH OLIVE AVENUE - APARTMENTS/PARKING GARAGE | | PERMIT #17110075 | | REVIEW COMMENTS - FIRE DEPARTMENT | | | | | | SHEET A1.11.1.A: SUMBIT PRODUCT AND LISTING DATA FOR | | PREFABRICATED FIRE TABLE. NOTE: NO OPEN FLAME WILL BE | | PERMITTED BY THIS OFFICE. | | | | SHEET A1.11.1.A: OUTDOOR GRILLS (X2) - PER NFPA 1 | | SECTION 10.11.6.1 NO HIBACHI, GRILL, OR OTHER SIMILAR | | DEVICES USED FOR COOKING, HEATING, OR ANY OTHER PURPOSE | | SHALL BE USED OR KINDLED ON ANY BALCONY, UNDER ANY | | OVERHANGING PORTION, OR WITHIN 10 FEET OF ANY | | STRUCTURE. | | | | SHEET A9.75.2: SUMBIT PRODUCT AND LISTING DATA FOR FIRE | | PIT. NOTE: NO OPEN FLAME WILL BE PERMITTED BY THIS | | OFFICE. | | | | SHEET A9.75.3: OUTDOOR GRILLS (X3) - PER NFPA 1 SECTION | | 10.11.6.1 NO HIBACHI, GRILL, OR OTHER SIMILAR DEVICES | | USED FOR COOKING, HEATING, OR ANY OTHER PURPOSE SHALL | | BE USED OR KINDLED ON ANY BALCONY, UNDER ANY | | OVERHANGING PORTION, OR WITHIN 10 FEET OF ANY | | STRUCTURE. | | | | SHEET M1.11.1.A: SMOKE EXHAUST FAN #1 DISCHARGE IS | | LOCATED WITHIN 6 FEET OF THE FRESH AIR INTAKE LOUVER OF | | STAIRWELL PRESSURIZATION FAN #1. TO MY KNOWLEDGE, THE | | CODE DOES NOT PROVIDE A REQUIRE A PRESCRIBED SEPARATION | | DISTANCE, ONLY THAT THE SEPARATION DISTANCE IS | | "ADEQUATE." PLEASE PROVIDE A SUPPORTING ARGUMENT AND | | DOCUMENTATION ENSURING 6 FEET OF CLEARANCE IS ADEQUATE | | SEPARATION TO AVOID SMOKE BEING TRANSFERRED INTO THE | | EXIT STAIRWELL. | | | | SHEETS M5.0.0, M5.0.1, AND M5.0.2 ARE SUBMITTED TWICE. | | | | SHEET P1.1.2B AND P1.1.2C: PLUMBING PIPING IS BEING | | ROUTED THROUGH THE FIRE RATED STAIR EXIT PASSAGEWAY. | | PROVIDE A 2-HOUR CEILING IN THE EXIT PASSAGEWAY OR | | REROUTE THE PLUMBING PIPING PER NFPA 101 SECTION | | 7.1.3.2. | | | | SHEET E1.1.1: ELECTRICAL FEEDERS RUN THROUGH STAIRWELL | | #2 EXIT PASSAGEWAY. PROVIDE A 2-HOUR CEILING IN THE | | EXIT PASSAGEWAY OR REROUTE THE ELECTRICAL FEEDERS PER | | NFPA 101 SECTION 7.1.3.2. | | | | SHEET E1.11.1C AND E1.11.1D: ADDITIONAL ILLUMINATED | | EXIT SIGNS ARE NEEDED ALONG THE EXTERIOR ROOF EGRESS | | PATH TO DIRECT OCCUPANT IN BOTH DIRECTIONS TO THE | | STAIRS AS THIS PATH WILL BE UNFAMILIAR TO MOST | | RESIDENTS. | | | | SHEET E3.0.0: PROVIDE MANUAL START AND TRANSFER | | FEATURES IN COMMAND ROOM FOR EMERGENCY GENERATOR PER | | NFPA 1 SECTION 11.9.5. | | | | GENERAL: IN SUPPORT OF THE FIRE DEPARTMENT'S GOAL TO | | REDUCE NUISANCE AND FALSE FIRE ALARM CALLS, THIS OFFICE | | SUGGESTS THE FIRE ALARM SYSTEM BE PROGRAMMED WITH ALARM | | VERFICATION WITH 30-60 SECOND DELAY PER NFPA 72. (A | | FEATURE OF AUTOMATIC FIRE DETECTION AND ALARM SYSTEMS | | TO REDUCE UNWANTED ALARMS WHEREIN SMOKE DETECTORS | | REPORT ALARM CONDITIONS FOR A MINIMUM | | PERIOD OF TIME, OR CONFIRM ALARM CONDITIONS WITHIN A | | GIVEN TIME PERIOD AFTER BEING RESET, IN ORDER TO BE | | ACCEPTED AS A VALID ALARM INITIATION SIGNAL.) | | | | SHEET FA1.1.1A: NO NOTIFICATION APPLIANCE PROVIDED IN | | PBULIC RESTROOM #100J. | | | | SHEET FA1.1.1B: NO NOTIFICATION APPLIANCES PROVIDED IN | | SEVERAL ROOMS SUCH AS TELEPHONE, STORAGE, AND | | SWITCHGEAR ROOMS. HOW WILL THIS DESIGN MEET THE | | AUDIBILITY REQUIREMENTS OF NFPA 72? | | | | SHEET FA1.1.1B: SEVERAL ROOM AND PARKING GARAGE VISUAL | | NOTICATION APPLIANCES APPEAR TO BE COVERING AREAS | | GREATER THAN THE LISTING OF THE APPLIANCE. FOR EXAMPLE, | | THE SPEAKER-STROBE APPLIANCE LOCATED ON THE CORRIDOR | | WALL OF STAIR #2 EXIT PASSAGEWAY IS COVERING NEARLY 50 | | FEET. A 75CD WALL MOUNTED STROBE WOULD COVER | | APPROXIMATELY 24 FEET. | | | | SHEET FA1.1.1C: MANUAL PULL STATIONS ARE LOCATED 6-FEET | | FROM THE EXIT DOORS FOR THE TWO DOUBLE EGRESS DOORS IN | | OLIVE RETAIL AND BANYAN RETAIL SPACES. PER NFPA 72 | | SECTION 17.14.6 MANUAL FIRE ALARM BOXES SHALL BE | | LOCATED WITHIN 60-INCHES OF THE EXIT DOORWAY OPENING AT | | EACH EXIT ON EACH FLOOR. | | | | SHEET FA1.1.1D: MANUAL PULL STATIONS ARE LOCATED 6-FEET | | FROM THE EXIT DOORS FOR THE TWO DOUBLE EGRESS DOORS | | BANYAN RETAIL SPACE. NO NOTIFICATION APPLIANCE PROVIDED | | IN EXIT PASSAGEWAY #107. SEVERAL PARKING GARAGE VISUAL | | NOTICATION APPLIANCES APPEAR TO BE COVERING AREAS | | GREATER THAN THE LISTING OF THE APPLIANCE. **CHECK | | COVERAGES THROUGHOUT PARKING GARAGE; ALL LEVELS. | | | | SHEET FA1.2.1A: NO SMOKE DETECTOR PROVIDED IN LOBBY FOR | | PHASE I ELEVATOR RECALL. | | | | SHEET FA1.5.1D: NO NOTIFICATION APPLIANCES PROVIDED IN | | MENS' RESTROOM, WOMENS' RESTROOM OR POOL EQUIPMENT | | ROOM. | | | | SHEET FA1.11.1A: INSUFFICIENT NOTIFICATION APPLIANCES | | PROVIDED FOR SOUTHEAST AND SOUTHWEST AREAS OF THE ROOF | | ASSEMBLY SPACE. | | | | SHEET FA1.11.1C: NO NOTIFICATION APPLIANCES PROVIDED | | ALONG ROOF EGRESS PATH LEADING TO STAIR #3. | | | | SHEET FP4.0.1: INDICATE ON THE RISERS UP TO WHAT LEVELS | | THE PRESSURE REDUCING TYPE VALVES WILL BE UTILIZED ON | | THE SPRINKLER AND STANDPIPE SYSTEMS. | | | | NOTE: THE CITY OF WEST PALM BEACH REQUIRES CONSTRUCTION | | TRAILERS LARGER THAN A SINGLE "DOUBLE WIDE" (OR TWO | | "SINGLE WIDE") TO EITHER BE PROTECTED BY AN AUTOMATIC | | SPRINKLER SYSTEM OR COMPLY WITH THE SEPARATION | | REQUIREMENTS OF NFPA 241. TEMPORARY CONSTRUCTION | | TRAILERS OR MODULAR BUILDINGS WILL REQUIRE A PERMIT AND | | COMPLIANCE WITH THE FOLLOWING: | | PER NFPA 241- STANDARD FOR SAFEGUARDING CONSTRUCTION, | | ALTERATION, AND DEMOLITION OPERATIONS, SECTION 4.2: | | TEMPORARY OFFICES, TRAILERS, AND OTHER FACILITIES OF | | COMBUSTIBLE CONSTRUCTION OR HOUSING COMBUSTIBLE | | CONTENTS SHALL BE SEPARATED FROM ADJACENT BUILDINGS, | | TRAILERS OR STRUCTURES IN ACCORDANCE WITH TABLE 4.2.1. | | PER TABLE 4.2.1: | | 1) 20 FEET EXPOSED LENGTH SHALL BE SEPARATED FROM | | ADJACENT STRUCTURES BY AT LEAST 30 FEET | | 2) 30 FEET EXPOSED LENGTH SHALL BE SEPARATED FROM | | ADJACENT STRUCTURES BY AT LEAST 35 FEET | | 3) 40 FEET EXPOSED LENGTH SHALL BE SEPARATED FROM | | ADJACENT STRUCTURES BY AT LEAST 40 FEET | | 4) 50 FEET EXPOSED LENGTH SHALL BE SEPARATED FROM | | ADJACENT STRUCTURES BY AT LEAST 45 FEET | | 5) 60 FEET EXPOSED LENGTH SHALL BE SEPARATED FROM | | ADJACENT STRUCTURES BY AT LEAST 50 FEET | | 6) GREATER THAN 60 FEET EXPOSED LENGTH SHALL BE | | SEPARATED FROM ADJACENT STRUCTURES BY AT LEAST 60 FEET | | | | | | WESLEY JOLIN | | ASSISTANT FIRE MARSHAL | | WEST PALM BEACH FIRE RESCUE | | [email protected] | | |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
3 |
Status |
P |
Date |
2018-05-16 |
|
|
Cont ID |
|
Sent By |
gjohnson |
Date |
2018-05-16 |
Time |
17:18 |
Rev Time |
0.00 |
Received By |
gjohnson |
Date |
2018-05-16 |
Time |
17:18 |
Sent To |
|
|
Notes |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
2 |
Status |
F |
Date |
2018-02-20 |
|
|
Cont ID |
|
Sent By |
gjohnson |
Date |
2018-02-20 |
Time |
08:19 |
Rev Time |
0.00 |
Received By |
gjohnson |
Date |
2018-02-20 |
Time |
08:19 |
Sent To |
|
|
Notes |
2018-02-20 08:33:44 | 2ND REVIEW: FBC 2014 5TH EDITION | | | | | | | | GAS COMMENTS: | | PREVIOUS COMMENT 2ND REQUEST 1. KEY NOTE LIST THE | | RETAIL METER AS #14 THE PLAN SHOWS IT AS #16 PLEASE | | CLARIFY. AMEND TO FBC 107.2.1 METERS STILL LABELED THE | | SAME. | | | | NEW COMMENTS: | | | | 1. PROVIDE INSTALLATION GUIDE FOR POOL HEATER VENTING | | AND MANUFACTURE SPECIFICATIONS FOR REGULATORS. THESE | | CAN BE DIFFERED SUBMITTALS IF REQUESTED. | | | | 2. THE LONGEST RUN AFTER THE REGULATOR ON THE POOL | | HEATER IS LISTED AT 25' PER FBC FG TABLE 402.5(2) THE | | MAX FOR THAT RUN AT 1" WOULD BE 374,000 BTU IT SHALL BE | | 11/4 AT 25' FOR A LOAD OF 400,000 BTU | | | | | | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT | | CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID | | THE PREVIOUSLY REVIEWED SHEETS. | | | | GEORGE JOHNSON | | PLUMBING PLANS EXAMINER | | CITY OF WEST PALM BEACH | | 561-805-6711 | | [email protected] | | |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
1 |
Status |
F |
Date |
2017-12-11 |
|
|
Cont ID |
|
Sent By |
gjohnson |
Date |
2017-12-11 |
Time |
12:55 |
Rev Time |
0.00 |
Received By |
gjohnson |
Date |
2017-12-11 |
Time |
12:55 |
Sent To |
|
|
Notes |
2017-12-11 12:56:42 | 1ST REVIEW: FBC 2014 5TH EDITION | | | | | | | | GAS COMMENTS: | | 1. KEY NOTE LIST THE RETAIL METER AS #14 THE PLAN SHOWS | | IT AS #16 PLEASE CLARIFY. AMEND TO FBC 107.2.1 | | | | 2. SUBMIT CALCULATIONS FOR COMBUSTION AIR PER THE | | FBC-2014 FUEL GAS CODE SEC. 304. | | | | 3. SUBMIT A DETAIL SHOWING THE TYPE, LOCATION, SIZE AND | | TERMINATION OF THE GAS VENTS PER FBC-2014 FUEL GAS CODE | | SEC. 502 THRU 505. | | | | 4. SUBMIT MANUFACTURER?S SPECIFICATION SHEETS FOR ALL | | GAS EQUIPMENT TO VERIFY COMPLIANCE WITH STANDARDS NFPA | | 54, NFPA 58, AND FBC-2014 FUEL GAS SEC. 402.2 | | | | | | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT | | CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID | | THE PREVIOUSLY REVIEWED SHEETS. | | | | GEORGE JOHNSON | | PLUMBING PLANS EXAMINER | | CITY OF WEST PALM BEACH | | 561-805-6711 | | [email protected] | | |
|
|
Review Stop |
HIST |
HISTORICAL |
Rev No |
1 |
Status |
N |
Date |
2017-12-19 |
|
|
Cont ID |
|
Sent By |
fmittner |
Date |
2017-12-19 |
Time |
13:00 |
Rev Time |
0.00 |
Received By |
fmittner |
Date |
2017-12-14 |
Time |
13:45 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
4 |
Status |
N |
Date |
2018-06-14 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2018-06-14 |
Time |
13:14 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2018-06-11 |
Time |
09:24 |
Sent To |
|
|
Notes |
2018-06-13 09:25:08 | IMPACT FEES ROUTED TO SHILL |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2018-06-01 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2018-06-01 |
Time |
16:50 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2018-04-13 |
Time |
14:11 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2018-03-17 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2018-03-17 |
Time |
14:16 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2018-01-31 |
Time |
10:42 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2018-01-24 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2018-01-24 |
Time |
18:24 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2017-11-17 |
Time |
09:32 |
Sent To |
|
|
Notes |
|
|
Review Stop |
IMPACT |
COUNTY IMPACT FEES |
Rev No |
2 |
Status |
P |
Date |
2018-06-14 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2018-06-14 |
Time |
13:14 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2018-06-14 |
Time |
13:14 |
Sent To |
|
|
Notes |
2018-06-14 13:14:39 | RECEIPT #2018-0611-281 | | REVIEW 18-18063 | | $1,681,244.41 PAID | | |
|
|
Review Stop |
IMPACT |
COUNTY IMPACT FEES |
Rev No |
1 |
Status |
F |
Date |
2017-12-08 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2017-12-08 |
Time |
06:10 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2017-12-08 |
Time |
06:10 |
Sent To |
|
|
Notes |
2017-12-08 06:12:26 | IMPACT FEE ASSESSMENT BY PALM BEACH COUNTY REQUIRED | | THE PLANS ARE TO BE TAKEN TO PALM BEACH COUNTY. THE | | STAMPED PLAN AND RECEIPT SHOWING THAT FEES DUE HAVE | | BEEN PAID ARE TO BE SUBMITTED TO US | | THIS MAY BE DONE AFTER ALL REVIEWS ARE COMPLETE, BUT | | MUST BE DONE BEFORE PERMIT ISSUANCE | | 561-233-5025 FOR MORE INFORMATION | | | | |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
3 |
Status |
P |
Date |
2018-06-04 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2018-06-04 |
Time |
16:45 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2018-05-15 |
Time |
17:33 |
Sent To |
|
|
Notes |
2018-05-16 16:46:33 | MECHANICAL PLANS APPROVED WITH EXECEPTION AND PROVISOS. | | 6/4/18 | | | | AS OF 6/4/18 THE FOLLOWING LIST OF COMMENTS FROM THE | | 3RD REVIEW WERE NOT ADDRESSED, HOWEVER DUE TO THE | | URGENT NEED TO HAVE THE PERMIT ISSUED, THE CURRENT | | MECHANICAL PLANS AND DOCUMENTS ARE APPROVED WITH | | EXCEPTION, AND THE REMAINING COMMENTS LISTED BELOW ARE | | DEEMED TO BE PROVISOS TO BE ADDRESSED BY THE DESIGN | | PROFESSIONAL AS SOON AS POSSIBLE. | | | | | | 3RD REVIEW FBC-2014 MECHANICAL, ENERGY CONSERVATION | | CODES | | PERMIT #17110075 | | 5/16/2018 | | | | PLAN REVIEW RESULTS: DENIED. | | | | THE THIRD REVIEW OF THE PLANS IS BASED ON THE | | RESUBMITTED PLANS AND DOCUMENTS, AND THE RESPONSES BY | | THE ARCHITECT OF RECORD. COMMENTS FROM THE PREVIOUS | | REVIEWS THAT HAVE NOT BEEN ADDRESSED, OR PARTIALLY | | STILL EXIST WILL BE REITERATED BELOW. | | | | 1) THE REVISED AC CALCULATIONS ARE NOT ELECTRONICALLY | | SIGNED AND SEALED BY THE EOR AS PREVIOUSLY REQUESTED. | | | | 2) COMMISSIONING OF THE COMMON AREA AC SYSTEMS IS | | REQUIRED PER SECTION C.408.2 EXCEPTION #1 FBC-EC. THE | | TOTAL BTUH'S OF THE O/A UNIT, THE MINI SPLIT SYSTEMS, | | THE COMMON AREA UNITS, THE OLIVE RETAIL SPACE, AND THE | | BANYAN RETAIL SPACE= 2,699,303 BTUH WHICH FAR EXCEEDS | | THE 480,000 BTUH THRESHOLD FOR COOLING. THE ARCHITECT'S | | RESPONSE NARRATIVE INCORRECTLY INDICATES THE | | THRESHOLD TO BE AT 400 TONS (4,800,000 BTUH), HOWEVER | | PER THE CODE SECTION IT IS 40 TONS (480,000 BTUH). | | PLEASE PROVIDE A COMMISSIONING PLAN AS PREVIOUSLY | | REQUESTED. | | | | 8 & 17) THE COMMENT REQUIRING POSITIVE PRESSURIZATION | | AND VENTILATION OF THE ELEVATOR LOBBIES IN THE PARKING | | GARAGES IS IN DISPUTE BY THE DESIGN PROFESSIONAL OF | | RECORD. THIS MATTER WILL BE REFERRED TO THE BUILDING | | OFFICIAL FOR REVIEW. | | | | 9) DUE TO THE FACT THAT THERE ARE DOOR OPENINGS INTO | | THE EXIT PASSAGEWAYS USED TO EXTEND STAIRS #1, 2, & 3 | | TO THE EXIT DISCHARGE OR PUBLIC WAY, SECTION 1022.10.1 | | EXCEPTION 1 REQUIRES THE EXIT PASSAGEWAY TO BE | | PRESSURIZED IN THE SAME MANNER AS THE PRESSURIZED | | STAIRWAY. THE ADDITIONAL NOTE ON SHEET M5.03 ABOUT THE | | EXIT PASSAGEWAY PRESSURIZATION MUST BE MODIFIED TO | | PROVIDE THE REQUIRED PRESSURIZATION PARAMETERS OF 0.10 | | IN. WG TO MAXIMUM 0.35 IN. WG. THIS MODIFICATION ALSO | | APPLIES TO THE NEW NOTE ON PAGE 7 OF THE SLS SMOKE | | CONTROL RATIONAL ANALYSIS REPORT. THE TERM "EXIT | | CORRIDOR" USED IN THE ANALYSIS IS INCORRECT, AND SHOULD | | BE REVISED TO READ "EXIT PASSAGEWAY". PLEASE NOTE THAT | | FIELD TESTING MUST VERIFY THAT THE PRESSURIZATIONS IN | | THE PASSAGEWAYS ARE EQUIVALENT TO THE STAIRWAYS. | | | | 14) SHEET M1.2.1A: PLEASE MODIFY THE GENERATOR EXHAUST | | DISCHARGE NOTE TO INCLUDE THE REQUIRED 10' CLEARANCE TO | | PROPERTY LINES, OPERABLE OPENINGS, AND TO GRADE. | | | | 15) M4.01, M4.02: STRUCTURAL ENGINEERING REQUIRED FOR | | ATTACHING THE AC AND INLINE FAN SUPPORTS TO THE SLAB | | WILL BE A DEFERRED SUBMITTAL. THE ENGINEERING SHALL BE | | PROVIDED PRIOR TO INSPECTION, AND BE ONSITE AT TIME OF | | INSPECTION. | | | | 22) COMMENT #44 STILL EXISTS. WIND LOAD ENGINEERING FOR | | INSTALLATION OF THE EXTERIOR BARBECUE NOT PROVIDED BUT | | MAY BE A DEFERRED SUBMITTAL. THE SUBMITTED CUT SHEET | | FOR THE BARBECUE DOES NOT INDICATE THE APPLIANCE HAS | | BEEN TESTED IN ACCORDANCE WITH THE ANSI STANDARDS | | LISTED UNDER SECTION 623.1 FBC-14 FUEL GAS. | | | | 24) COMMENT STILL EXISTS. THE NARRATIVE INDICATES THE | | FIRESTOPPING DETAIL FOR THE REFRIGERANT PIPING TO BE ON | | M.5.0.2, HOWEVER M5.02 IS A CONTROL PAGE AND THE DETAIL | | IS NOT SHOWN THERE. | | | | 28) SHEET M2.9.1 NOT ELECTRONICALLY SIGNED AND SEALED. | | | | 29) THE ENLARGED 16"X6" TRANSFER DUCT IS UNDERSIZED- | | MINIMUM 108 SQ. INCHES REQUIRED. SHEET M2.10.1 NOT | | ELECTRONICALLY SIGNED AND SEALED. | | | | 30) SHEET M2.15.1 NOT ELECTRONICALLY SIGNED AND SEALED. | | | | 31) SHEET M2.21.1 NOT ELECTRONICALLY SIGNED AND SEALED. | | 32) SHEET M2.27.1 NOT ELECTRONICALLY SIGNED AND SEALED. | | | | 33) SHEET M2.28.1 NOT ELECTRONICALLY SIGNED AND SEALED. | | | | 34) SHEET M2.30.1, UNIT 1039:- CANNOT VERIFY CORRECT | | SIZING OF THE RETURN TRANSFER DUCT BECAUSE THE SIZE OF | | THE SUPPLY DUCT INTO THE MASTER SUITE IS NOT INDICATED. | | | | 34) SHEET M2.30.1, UNIT 1008: THE 16"X6" RETURN | | TRANSFER DUCT FROM THE MASTER SUITE IS UNDERSIZED- 120 | | SQ. INCHES REQUIRED. | | NEW COMMENTS. | | | | 1) ADVISORY: TO AVOID A CONFLICT IN THE FIELD, PLEASE | | REVIEW PLANS AND PROVIDE DUCT SMOKE DETECTORS IN THE | | RETURN SYSTEMS OF ANY AC SYSTEMS IN THE APARTMENTS OR | | IN THE COMMON AREAS WITH MINIMUM 5-TON CAPACITIES. | | | | 2) SHEET M.401: PROVIDE A NOTE IN THE SCHEDULE TO | | INDICATE THAT ANY SMOKE CONTROL FANS THAT ARE | | BELT-DRIVEN SHALL BE EQUIPPED WITH A MINIMUM OF TWO | | BELTS- SECTION 513.10.5. THIS WOULD INCLUDE BOTH | | PRESSURIZATION AND EXHAUST FANS. | | | | 3) THE FOLLOWING IS A LIST OF DEFERRED SUBMITTALS FOR | | THE MECHANICAL PERMIT THAT WILL REQUIRE SHOP DRAWING | | APPROVAL BY THE ENGINEER OF RECORD: | | | | A) SMOKE CONTROL FANS. | | B) FIRE AND FIRE/SMOKE DAMPERS. | | C) BAROMETRIC DAMPERS | | D) DUCT SMOKE DETECTORS | | E) AC ROOF AND DUCT STANDS, WALL BRACKETS | | F) EXHAUST AND OUTSIDE AIR LOUVERS | | G) C02 AND N02 SENSORS | | H) PIPING INSULATIONS | | I) ACCESS PANELS | | J) GENERATOR | | K) COMMERCIAL CLOTHES DRYERS | | L) COOKING APPLIANCES | | M) DUCT FIRE WRAPPING | | N) FIRESTOPPING AND FIRE CAULKING | | O) MANUFACTURER'S SPECIFICATIONS AND WIND LOAD | | ENGINEERING FOR THE EXTERIOR BARBECUE. | | P) STRUCTURAL DETAILS FOR ATTACHING THE AC UNITS AND | | INLINE FAN SUPPORTS TO THE SLAB. | | Q) WIND LOAD ENGINEERING FOR ALL ROOF TOP MOUNTED | | MECHANICAL EQUIPMENT- OAU'S, FANS AND FAN CURBS, AC | | STANDS, SUPPORTS ETC. | | R) MANUFACTURER'S CERTIFICATION AND INSTALLATION | | INSTRUCTIONS FOR THE OUTDOOR CONDENSERS TO BE INSTALLED | | IN THE ENCLOSED PARKING GARAGE | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT | | CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE | | PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND | | KEEP THEM WITH THE SUBMITTALS | | | | CHRISTOPHER L. COLE | | MECHANICAL PLANS EXAMINER | | 401 CLEMATIS STREET | | WEST PALM BEACH FL 33401 | | 561-805-6719 | | [email protected] | | | | | | | | | | |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
2 |
Status |
F |
Date |
2018-02-15 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2018-02-15 |
Time |
13:31 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2018-02-14 |
Time |
09:44 |
Sent To |
|
|
Notes |
2018-02-15 13:31:22 | 2ND REVIEW FBC-2014 MECHANICAL | | PERMIT #17110075 | | 2/13/2018 | | | | PLAN REVIEW RESULTS: DENIED. | | | | THE SECOND REVIEW OF THE PLANS IS BASED ON THE | | RESUBMITTED PLANS AND DOCUMENTS, AND THE RESPONSES BY | | THE ENGINEER OF RECORD. COMMENTS FROM THE 1ST REVIEW | | THAT HAVE NOT BEEN ADDRESSED, OR PARTIALLY STILL EXIST | | WILL BE REITERATED BELOW. | | | | 1) COMMENT #1: 2ND REQUEST FOR ELECTRONICALLY SIGNED | | AND SEALED AC CALCULATIONS. | | | | 2) COMMENT #2: IT IS AGREED THAT THE APARTMENT SYSTEMS | | DO NOT HAVE TO BE COMMISSIONED HOWEVER THE COMMON AREA | | AND CORRIDOR SYSTEMS DO NOT FALL UNDER SECTION C408.2 | | EXCEPTION #2. PLEASE NOTE THAT COMMISSIONING OF THE | | ELECTRICAL POWER AND LIGHTING SYSTEMS IS ALSO REQUIRED | | AND SHALL BE INCLUDED IN THE REPORT. | | | | 3) COMMENTS #3 & 4: PLEASE PROVIDE DOCUMENTATION THAT | | THE TRACE 700 PROGRAM IS COMPLIANT WITH ASHRAE/ACCA | | STANDARD 183 OR ACCA MANUAL N. | | | | 4) COMMENT #5: 2ND REQUEST FOR AN ACCURATE ENERGYGAUGE | | COMPLIANCE REPORT THAT PROVIDES DATA CONSISTENT WITH | | THE SYSTEMS SHOWN ON THE PLANS. | | | | 5) COMMENT #6: AS STATED IN THE RESPONSE NARRATIVE, | | ESTIMATED LOADS HAVE BEEN USED TO PROVIDE INPUT DATA | | FOR THE FUTURE OLIVE AND BANYAN RETAIL SPACES IN THE | | ENERGYGAUGE REPORT. PLEASE INDICATE SPECIFICALLY WHERE | | THIS INPUT DATA CAN BE FOUND IN THE REPORT. I WAS | | UNABLE TO LOCATE IT. | | | | 6) COMMENT #7: 2ND REQUEST FOR THE SMOKE ANALYSIS | | REPORT TO BE ELECTRONICALLY SIGNED AND SEALED. | | | | 7) COMMENT #8: ACKNOWLEDGED. COMMISSIONING OF THE SMOKE | | CONTROL SYSTEMS WILL BE PROVIDED BY THE OWNERSHIP IN | | CONJUNCTION WITH SLS AS A DEFERRED SUBMITTAL. | | | | 8) COMMENT #9: 2ND REQUEST FOR MINIMUM VENTILATION | | CALCULATIONS FOR THE ELEVATOR LOBBIES. THE REQUIREMENT | | FOR VENTILATING THE LOBBIES IS FOUND IN SECTION 403.3 | | AND TABLE 403.3, AND ALSO SECTION 404.3. | | | | 404.3 OCCUPIED SPACES ACCESSORY TO PUBLIC GARAGES. | | CONNECTING OFFICES, WAITING ROOMS, TICKET BOOTHS AND | | SIMILAR USES THAT ARE ACCESSORY TO A PUBLIC GARAGE | | SHALL BE MAINTAINED AT A POSITIVE PRESSURE AND SHALL BE | | PROVIDED WITH VENTILATION IN ACCORDANCE WITH SECTION | | 403.3 | | | | 9) COMMENT #11, SHEETS M1.1.1B, M.1.1.1C: IT IS AGREED | | THAT THE TRANSFER GRILLS FROM THE STAIRWELL ENCLOSURES | | INTO THE EXIT PASSAGEWAYS ARE PERMITTED UNDER SECTION | | 1022.5 AND 1022.10.1 FOR PRESSURIZATION OF THE EXIT | | PASSAGEWAYS, HOWEVER PRESSURIZATION OF THE PASSAGEWAYS | | AND THE SEQUENCE OF OPERATION FOR THE FIRE DAMPERS IN | | THE TRANSFER GRILLS ABOVE THE STAIRWELL ENCLOSURE | | | | DOORS ARE NOT INCLUDED IN THE SMOKE ANALYSIS REPORT, OR | | MENTIONED IN THE SEQUENCE OF OPERATION ON SHEET M5.03. | | PLEASE REVISE THE REPORT AND PLANS ACCORDINGLY, AND | | CLARIFY IF THE EXISTING FANS HAVE THE CAPACITIES TO | | PRESSURIZE THE PASSAGEWAYS IN A SMOKE EVENT. PLEASE | | NOTE THAT THE DOOR OPENINGS THAT ARE SHOWN IN THE | | PASSAGEWAYS CONNECTING THE LOADING BAY AND GARAGE ETC. | | | | ARE PERMITTED ONLY IF THE EXIT PASSAGEWAYS ARE | | PRESSURIZED IN THE SAME MANNER AS THE STAIRWELLS- | | SECTION 1022.10.1 EXCEPTIONS. THE PRESSURIZATION OF | | THESE PASSAGEWAYS HAS NOT BEEN ADDRESSED. | | | | 10) COMMENTS #14 & 31: ACKNOWLEDGED. PLEASE PROVIDE A | | NOTE ON THE PLAN FOR O/A CLEARANCE REQUIREMENTS. | | | | 11) COMMENTS #15 & 27: ACKNOWLEDGED. MANUFACTURER'S | | SPECIFICATIONS FOR THE CONDENSERS TO BE A DEFERRED | | SUBMITTAL. THE SPECS SHALL INDICATE THE UNITS MAY BE | | INSTALLED INDOORS. | | | | 12) COMMENT #18: THERE IS NO NOTE IN THE FAN SCHEDULE | | TO INDICATE THE FIRE PUMP EXHAUST FAN EF-L1 WILL RUN | | CONTINUOUSLY. | | | | 13) COMMENT #25: THERE IS NO NOTE IN THE FAN SCHEDULE | | TO INDICATE THE EXHAUST FANS EF-M1 & EF-M2 WILL RUN | | CONTINUOUSLY. | | | | 14) COMMENT #26: ACKNOWLEDGED. PLEASE PROVIDE A NOTE ON | | THE PLAN PERTAINING TO REQUIRED GENERATOR EXHAUST | | CLEARANCES. SUBMIT SPECS FOR THE GENERATOR AND EXHAUST | | PIPING. | | | | 15) COMMENTS #28, 29, 37, & 38: : INDICATE HOW THE | | CONDENSER AND FAN SUPPORTS BARS WILL BE ATTACHED TO | | FLOOR/CEILING SLAB ABOVE. | | | | 16) COMMENT #30: REQUESTED ARCHITECTURAL DETAILS AND | | SECTION CUTS FOR THE GENERATOR INTAKE PLENUM NOT | | PROVIDED. | | | | 17) COMMENT #32: PLEASE SEE COMMENT #8 FROM THIS | | CURRENT REVIEW. MINIMUM VENTILATION AND PRESSURIZATION | | IS REQUIRED FOR ALL ELEVATOR LOBBIES ON ALL LEVELS THAT | | ARE ADJACENT TO PARKING GARAGE AREAS. | | | | 18) COMMENT #33, SHEET M1.3.1.B: THE O/A OPENING SHALL | | BE LOCATED ON THE EXTERIOR WALL. THE PLAN SHOWS THE | | LOUVER CONNECTING WITH AN ENCLOSED PARKING GARAGE- | | SECTION 401.2 | | | | 19) COMMENT #39: A) MINIMUM 8' FROM FINISHED FLOOR TO | | THE BOTTOM OF THE SMOKE EXHAUST DUCT AND FAN REQUIRED- | | SECTION 304.6. B) SUBMIT MANUFACTURER'S SPECIFICATIONS | | FOR THE FIRE WRAP WITH SHOP DRAWING APPROVAL BY THE | | EOR. | | | | 20) COMMENT #41: BECAUSE THE SPECS INDICATE THE SYSTEM | | WILL PRODUCE OVER 2000 CFMS AT .10, .20, OR .30 STATIC | | PRESSURE, THE DUCT SMOKE DETECTOR WILL BE REQUIRED. | | | | 21) COMMENT #43: PLEASE ADD A NOTE IN THE SCHEDULE THAT | | THE POOL EQUIPMENT ROOM EXHAUST FAN EF-5-1 WILL RUN | | CONTINUOUSLY. | | | | 22) COMMENT #44: SUBMIT SPECS FOR THE BBQ AND INDICATE | | HOW IT WILL BE ANCHORED TO RESIST WIND LOADS- SECTIONS | | 301.10 & 623.1 FBC-14 FUEL GAS. | | | | 23) COMMENTS #45 & 46: ACKNOWLEDGED. THE POOL AND POOL | | EQUIPMENT SHALL BE SUBMITTED UNDER SEPARATE PERMIT. | | | | 24) COMMENT # 47, SHEET A10.1.1: FIRESTOPPPING FOR THE | | REFRIGERANT PIPING PENETRATING THE FIRE-RATED STEEL | | FRAMED AND GYPSUM ENCLOSURE NOT PROVIDED. | | | | 25) COMMENT #51: ACKNOWLEDGED. WIND LOAD ENGINEERING | | FOR ALL ROOFTOP MECHANICAL INSTALLATIONS SHALL BE | | DEFERRED SUBMITTALS. | | | | 26) COMMENT #52: PLEASE SEE COMMENT #9 FROM THIS REVIEW | | CONCERNING THE EXIT PASSAGEWAYS FOR STAIRS #2 & #3. | | REVISIONS TO THE SMOKE CONTROL REPORT AND PLANS MAY BE | | REQUIRED. | | | | 27) COMMENT #54: REFER TO COMMENT #20 FROM THIS CURRENT | | REVIEW. | | | | 28) COMMENT #63: PLEASE SEE SECTION 601.5(3). ALL | | SUPPLY AIR INTO A MASTER SUITE SHALL BE RETURNED. 10X6 | | X 1.5 = 90. THE 72 SQ. IN. RETURN DUCT IS UNDERSIZED. | | | | 29) COMMENTS #64 & 65: SEE COMMENT #28 FROM THIS REVIEW | | AND CORRECT. | | | | 30) COMMENT #68: MINIMUM 90 SQ. IN. RETURN DUCT FROM | | THE MASTER SUITE REQUIRED- SECTION 601.5(3). | | | | 31) COMMENT #71: MINIMUM 90 SQ. IN. RETURN DUCT FROM | | THE MASTER SUITE REQUIRED- SECTION 601.5(3). | | | | 32) COMMENT #73: MINIMUM 90 SQ. IN. RETURN DUCT FROM | | THE MASTER SUITE REQUIRED- SECTION 601.5(3). | | | | 33) COMMENT #74: MINIMUM 90 SQ. IN. RETURN DUCT FROM | | THE MASTER SUITE REQUIRED- SECTION 601.5(3). | | | | 34) COMMENT #75: MINIMUM 90 SQ. IN. RETURN DUCT FROM | | THE MASTER SUITE REQUIRED- SECTION 601.5(3). | | | | 35) COMMENT #76: MINIMUM 90 SQ. IN. RETURN DUCT FROM | | THE MASTER SUITE REQUIRED- SECTION 601.5(3). | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT | | CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE | | PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND | | KEEP THEM WITH THE SUBMITTALS. | | | | CHRISTOPHER L. COLE | | MECHANICAL PLANS EXAMINER | | 401 CLEMATIS STREET | | WEST PALM BEACH FL 33401 | | 561-805-6719 | | [email protected] | | | | |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
F |
Date |
2017-12-11 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2017-12-11 |
Time |
12:02 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2017-12-05 |
Time |
16:58 |
Sent To |
|
|
Notes |
2017-12-11 12:03:54 | 1ST REVIEW FBC-2014 MECHANICAL, ENERGY CONSERVATION | | CODES, | | WEST PALM BEACH AMENDMENTS TO THE FBC. | | PERMIT #17110075 | | THE OLD CITY HALL SITE APARTMENTS | | 12/6/17 | | | | PLAN REVIEW RESULTS: DENIED. | | | | 1) THE AC CALCULATIONS MUST BE SIGNED AND SEALED BY THE | | ENGINEER OF RECORD- SECTION 105.3.1.2 FBC-14. | | | | 2) COMMISSIONING OF THE MECHANICAL SYSTEMS IS REQUIRED | | PER SECTION C408.2 FBC-14 ENERGY CONSERVATION. SUBMIT A | | COMMISSIONING PLAN AS OUTLINED IN SECTION C408.2.1 AND | | DESCRIBED IN SECTIONS C403.2.2- C408.2.3.3. PLEASE NOTE | | THAT A COPY OF THE COMMISSIONING REPORT SHALL BE | | SUBMITTED FOR REVIEW AT FINAL INSPECTION. | | | | 3) THE AC CALCULATIONS ARE INDICATED TO BE FOR PACKAGED | | TERMINAL AIR CONDITIONERS HOWEVER MOST OF THE SYSTEMS | | ARE EITHER SPLIT OR ROOF TOP UNITS. PLEASE MATCH THE | | SYSTEM TYPES SHOWN IN THE CALCULATIONS WITH THE SYSTEMS | | SELECTED IN THE PLANS. | | | | 4) SUMMER DRY BULB AND WET BULB TEMPERATURES FOR WEST | | PALM BEACH PER ACCA MANUAL N ARE 90 AND 78 DEGREES, | | HOWEVER MANY OF THE CALCULATIONS ARE INDICATING | | TEMPERATURES AS LOW AS 80 AND 68 DEGREES. PLEASE | | CLARIFY HOW THE VARYING PEAK TIMES AND HOURS HAVE BEEN | | DETERMINED, VERIFY THAT THE TRACE 700 CALCULATION | | PROGRAM IS COMPLIANT WITH ASHRAE/ACCA STANDARD 183 OR | | ACCA MANUAL N PER SECTION C403.2.1. | | | | 5) THE ENERGYGAUGE COMPLIANCE SUBMITTAL SHOWS | | COMPLIANCE DATA FOR THE AC SYSTEMS THAT DOES NOT MATCH | | THE SYSTEMS SPECIFIED ON SHEET M4.04. THERE ARE MANY | | INCONSISTENCIES INCLUDING THE NUMBER OF SYSTEMS FOR THE | | APARTMENT, SYSTEM CAPACITIES AND EFFICIENCY RATINGS FOR | | BOTH THE APARTMENT AND COMMON AREA SPLIT SYSTEMS, TYPES | | OF SYSTEMS AND SYSTEM IDENTIFICATIONS, ETC. MISSING | | FROM THE CALCS ARE THE MINI SPLIT SYSTEMS AND OAU?S 1, | | 2, & 3 SHOWN IN THE SCHEDULE. MISSING FROM THE SCHEDULE | | ARE THE 8.0 AND 10.0 PACKAGE SYSTEMS SHOWN IN THE | | CALCS. | | | | 6) FUTURE OLIVE AND BANYAN RETAIL: THERE ARE NO | | MECHANICAL SYSTEMS PROPOSED FOR THE FUTURE RETAIL AREAS | | HOWEVER THE ENERGYGAUGE SUBMITTAL IS PROVIDING | | CALCULATIONS FOR A NEW FINISHED BUILDING. HOW ARE THESE | | AREAS GOING TO MEET COMPLIANCE? | | | | 7) THE SLS SMOKE CONTROL RATIONAL ANALYSIS REPORT IS | | MISSING THE REQUIRED ELECTRONIC SIGNATURE AND SEAL OF | | THE ENGINEER- SECTION 61G15-23.005 FLORIDA | | ADMINISTRATIVE CODE. | | | | 8) COMMISSIONING OF THE SMOKE CONTROL SYSTEM IS | | REQUIRED IN ACCORDANCE WITH THE REPORT SLS REPORT. | | PLEASE REFER TO PAGES 30-34 FOR TESTING PROCEDURES, | | INSPECTIONS, AND REPORT SUBMITTALS. IN ACCORDANCE WITH | | THE REPORT, TESTING SCENARIOS MUST BE SUBMITTED TO BOTH | | THE WPB BUILDING AND FIRE DEPARTMENTS FOR REVIEW PRIOR | | TO COMMISSIONING OF THE SYSTEM, AND A FINAL REPORT OF | | THE COMMISSIONING IS REQUIRED. | | | | 9) SHEET M4.04: THE O/A CALCULATIONS FOR THE FITNESS | | ROOM SHALL BE CALCULATED AT 20 CFM PER PERSON. TOTAL | | 480 CFMS REQUIRED. MISSING FROM THE SCHEDULE ARE O/A | | CALCULATIONS FOR THE CORRIDORS, MAILROOM, ELEVATOR | | LOBBIES, STORAGE ROOMS- LVLS 1-3, | | | | 10) GARAGE EXHAUST VENTILATION: THERE APPEARS TO BE | | INCONSISTENCIES ON HOW THE EXHAUST SYSTEMS WILL | | FUNCTION BASED ON THE MECHANICAL FLOOR PLANS, THE | | CONTROLS OPERATION ON SHEET M5.03, AND THE CONTROL | | SYSTEM AS OUTLINED ON PAGE 9 OF THE SLS SMOKE CONTROL | | RATIONAL ANALYSIS REPORT. THE REPORT IS REQUIRING AN | | EXHAUST RATE OF 1 CFM/SF. OVER THE FLOOR AREA TO BE | | PROVIDED CONTINUOUSLY. THE CONTROLS OPERATION SEQUENCE | | ON M5.03 OF OPERATIONS INDICATES ONE FAN ON EACH GARAGE | | LEVEL TO RUN CONTINUOUSLY WITH THE OTHER FANS TO BE | | ACTIVATED BY CO AND NO2 SENSORS. THE SEQUENCE OF | | OPERATIONS, HOWEVER, DOES NOT SPECIFY EXHAUST RATES TO | | BE PROVIDED ON ANY OF THE LEVELS. THE MECHANICAL FLOOR | | PLAN DRAWINGS FOR THE PARKING LEVELS PROVIDE THE | | EXHAUST RATES AND TOTAL CFMS REQUIRED PER FLOOR LEVEL | | BUT DO NOT SHOW THE LOCATIONS OF SENSORS OR INDICATE IF | | THE FANS WILL RUN CONTINUOUSLY. PLEASE REFER TO | | SECTIONS 404.1 AND 404.2 AND CORRELATE THE PLANS | | TOGETHER. | | | | 11) SHEETS M1.1.1A, M1.1.1B, & M1.1.1C: THE TRANSFER | | GRILLS SHOWN IN THE STAIR #2, 3, AND 4 ENCLOSURES ARE | | PROHIBITED PER SECTION 1022.3.1 & 1023.6 FBC-14 | | BUILDING. REFER TO THE SMOKE CONTROL RATIONAL ANALYSIS- | | NEITHER THE TRANSFER GRILLS OR THE EXIT PASSAGEWAYS ARE | | SPECIFIED AS PART OF THE STAIR PRESSURIZATION METHODS | | IN THE SMOKE CONTROL RATIONAL ANALYSIS. IT APPEARS | | THERE ARE CONFLICTS BETWEEN THE SMOKE CONTROL SYSTEM | | DESIGN, THE PLAN DESIGN, AND WHAT IS ALLOWED BY CODE- | | PLEASE CLARIFY AND REVISE ACCORDINGLY. | | | | 12) M1.1.1A: THE TRASH ROOM SHALL BE PROVIDED WITH AN | | EXHAUST SYSTEM WITH A MINIMUM RATE OF 1.00 CFM/SF.- | | TABLE 6-4 ASHRAE 62.1-2010. | | | | 13) M1.1.1A: O/A IS REQUIRED IN THE STORAGE ROOM- TABLE | | 403.3. | | | | 14) M1.1.1A, M1.1.1B, M1.1.1C, & M1.1.1D: VERIFY | | COMPLIANCE WITH SECTION 401.5 ? O/A INLET CLEARANCE | | DISTANCES, AND SECTION 501.3.1- EXHAUST OUTLET | | CLEARANCES. | | | | 15) M1.1.1A, M1.1.1B, & M1.1.1C: AIR COOLED, EXTERIOR | | CONDENSERS FOR THE MINI SPLIT SYSTEMS ARE BEING | | INSTALLED IN THE INTERIOR OF THE BUILDING. SUBMIT | | MANUFACTURER?S SPECIFICATIONS AND INSTALLATION | | GUIDELINES TO VERIFY THIS IS ACCEPTABLE PER THE | | MANUFACTURER. INDICATE HOW THE HOT, MOIST AIR FROM THE | | CONDENSERS WILL BE EXHAUSTED OUT OF THE ENCLOSED | | SPACES. PLEASE NOTE THAT THIS IS A TYPICAL CONDITION | | THROUGHOUT THE 2ND, 3RD, AND 4TH FLOOR GARAGE LEVELS. | | | | 16) M1.1.1B: PROVIDE THE DIMENSIONS OF THE OPEN-ENDED | | GARAGE EXHAUST DUCT, AND HEIGHT ABOVE THE FINISHED | | FLOOR. | | | | 17) M1.1.1B & M1.1.1D: PROVIDE EXHAUST VENTILATION | | CALCULATIONS FOR THE GROUND FLOOR GARAGE, OR CLARIFY IF | | THEY ARE INCORPORATED INTO THE 2ND FLOOR CALCULATIONS | | SHOWN ON SHEET M1.2.1B & M1.1.2D. | | | | 18) M1.1.1B: PROVIDE AN EXHAUST VENTILATION CALCULATION | | FOR THE FIRE PUMP ROOM. HOW WAS THE FAN SIZED AND WHAT | | IS THE SEQUENCE OF OPERATION? | | | | 19) M1.1.1B, M1.1.1C, & M1.1.1D: INDICATE HOW MAKEUP | | AIR IS BEING PROVIDED FOR THE GROUND LEVEL GARAGE | | EXHAUST. | | | | 20) M1.1.1C: INDICATE THE HEIGHT OF THE 18"X10" DUCT | | ABOVE THE GARAGE FLOOR. | | | | 21) M1.1.1D: INDICATE THE HEIGHT OF THE 42"X42" DUCT | | ABOVE THE GARAGE FLOOR. | | | | 22) M1.2.1A: THE DUCT SMOKE DETECTOR IN THE 24X10 | | RETURN DUCT FOR AC-2-1 SHALL BE INSTALLED UPSTREAM OF | | THE O/A DUCT CONNECTION- SECTION 606.2.1. | | | | 23) M1.2.1A: A DUCT SMOKE DETECTOR IS REQUIRED IN THE | | RETURN AIR SYSTEM OF AC-2-2- SECTION 606.2.1. | | | | 24) M1.2.1A: PROVIDE ARCHITECTURAL PLAN AND ELEVATION | | VIEWS OF THE EQUIPMENT PLATFORM AND ACCESS LADDER- SEE | | SECTION 306.1. | | | | 25) M1.2.1A: PROVIDE EXHAUST VENTILATION CALCULATIONS | | FOR EF-M1 (LOADING DOCK), AND EF-M2 (GENERATOR ROOM). | | INDICATE THE SEQUENCE OF OPERATION FOR EACH FAN, AND | | HOW MAKE UP AIR IS BEING PROVIDED FOR EF-M1. | | | | 26) M1.2.1A: PROVIDE THE CLEARANCE DISTANCE | | MEASUREMENTS FOR THE GENERATOR DISCHARGE PIPE AND THE | | GENERATOR RADIATOR EXHAUST OUTLET LOUVER- SEE SECTION | | 501.3.1 (2). | | | | 27) M1.2.1A: THE AIR COOLED, EXTERIOR CU-2-1 AND CU-2-2 | | CONDENSERS ARE BEING INSTALLED IN THE INTERIOR OF THE | | BUILDING. SUBMIT MANUFACTURER?S SPECIFICATIONS AND | | INSTALLATION GUIDELINES TO VERIFY THIS IS ACCEPTABLE | | PER THE MANUFACTURER. INDICATE HOW THE HOT, MOIST AIR | | FROM THE CONDENSERS WILL BE EXHAUSTED OUT OF THE | | ENCLOSED SPACES. | | | | 28) M1.2.1A: PROVIDE SUPPORT AND HANGING DETAILS FOR | | CU-2-1 AND CU-2-2. | | | | 29) M1.2.1A: CLARIFY HOW ACCESS TO SERVICE OR REPLACE | | GEF-2-4 AND EF-M1 WILL BE PROVIDED- SEE SECTION 306.5. | | | | 30) M1.2.1B: INDICATE WHICH PLAN SHEET SHOWS | | ARCHITECTURAL DETAILS FOR THE GENERATOR INTAKE PLENUM. | | | | 31) M1.2.1B & M1.2.1D: CLARIFY IF THE EXHAUST | | VENTILATION CALCULATIONS SHOWN FOR THE GARAGE ARE FOR | | THE 1ST AND 2ND GARAGE FLOOR LEVELS. | | | | 32) M1.2.1D: O/A NOT PROVIDED TO THE ELEVATOR LOBBY- | | TABLE 403.3 | | | | 31) M1.2.1A, M1.2.1B, M1.2.1C, & M1.2.1D: VERIFY | | COMPLIANCE WITH SECTION 401.5- O/A INLET CLEARANCE | | DISTANCES, AND SECTION 501.3.1- EXHAUST OUTLET | | CLEARANCES. | | | | 33) M1.3.1B: PROVIDE AN EXHAUST VENTILATION CALCULATION | | OF THE STORAGE ROOM. CLARIFY HOW O/A WILL BE PROVIDED | | TO THE ROOM- TABLE 403.3 | | | | 34) M1.3.1D: O/A NOT PROVIDED TO THE ELEVATOR LOBBY- | | TABLE 403.3. | | | | 35) M1.4.1A: FIRE SMOKE DAMPERS MISSING WHERE THE | | 16?X8? SMOKE EXHAUST DUCT PENETRATES THE SHAFT, AND THE | | 18"X10" DUCT PENETRATES THE CORRIDOR WALL AND THE | | SHAFT. | | | | 36) M1.4.1A: THE EXHAUST DUCT FROM THE TOILET ROOM MUST | | DISCHARGE TO THE OUTDOORS- SECTION 501.3. | | | | 37) M1.4.1A: PROVIDE SUPPORT AND HANGING DETAILS FOR | | AC-4-3 AND AC-4-4: INDICATE THE HEIGHT OF AC-4-3 ABOVE | | THE FINISHED FLOOR AND HOW ACCESS WILL BE PROVIDED. | | | | 38) M1.4.1C: PROVIDE SUPPORT AND HANGING DETAILS FOR | | AC-4-1 AND INDICATE HOW ACCESS WILL BE PROVIDED. | | | | 39) M1.4.1C: PROVIDE STRUCTURAL AND ARCHITECTURAL | | DETAILS FOR THE 2HR FIRE-RATED ENCLOSURE FOR SEF-3. | | INDICATE THE HEIGHT OF THE ENCLOSURE ABOVE THE FINISHED | | FLOOR. | | | | 40) M1.4.1D: O/A NOT PROVIDED TO THE ELEVATOR LOBBY- | | TABLE 403.3. | | | | 41) M1.5.1A: A DUCT SMOKE DETECTOR IS REQUIRED IN THE | | RETURN AIR SYSTEM OF THE 5-TON AC-5-1 AIR HANDLER PER | | SECTION 606.2.1. PLEASE NOTE THAT AN EXEMPTION CAN BE | | APPLIED IF THE MANUFACTURER'S SPECIFICATIONS INDICATE | | THE SYSTEM IS NOT CAPABLE OF PRODUCING OVER 2000 CFMS | | OF SUPPLY AIR. | | | | 42) M1.5.1A: PROVIDE CLEARANCE DISTANCE MEASUREMENTS | | FOR THE SEF-6A&B EXHAUST OUTLET PER SECTION 501.3.1(2). | | | | 43) M1.5.1B & M1.5.1D: PROVIDE AN EXHAUST VENTILATION | | CALCULATION FOR THE POOL EQUIPMENT ROOM AND PROVIDE A | | SEQUENCE OF OPERATION FOR EF-5-1. | | | | 44) M1.5.1C: REFER TO SHEET A9.75.3 WHICH SHOWS AN | | APPLIANCE LEGEND THAT INCLUDES COOKING AND LAUNDRY | | APPLIANCES. PLEASE SHOW THE LOCATIONS OF THE APPLIANCES | | ON THE MECHANICAL PLANS AND PROVIDE EXHAUST AND AIR | | INTAKE CALCULATIONS AND DETAILS WHERE REQUIRED. SUBMIT | | MANUFACTURER'S SPECIFICATIONS FOR ALL APPLIANCES AND | | EQUIPMENT. | | | | 45) M1.5.1D: PROVIDE AN EQUIPMENT SCHEDULE FOR THE POOL | | HEATER AND SUBMIT MANUFACTURER'S SPECIFICATIONS. | | | | 46) M1.5.1D: INDICATE THE TERMINATION LOCATION OF THE | | 6" BOILER EXHAUST DUCT. | | | | 47) M1.10.1A: PROVIDE THE UL LISTED AND LABELED | | ASSEMBLY DETAILS FOR THE 2HR FIRE-RATED REFRIGERATION | | PIPING ENCLOSURES, AND THE FIRESTOPPING ASSEMBLIES TO | | PROTECT THE PENETRATIONS OF THE ENCLOSURE INTO THE | | SHAFT AND THE PIPINGS INTO THE ENCLOSURE. CLARIFY HOW | | ACCESS TO THE REFRIGERANT PIPING WILL | | | | 48) M1.11.1A & M1.11.1D: O/A NOT PROVIDED TO THE | | ELEVATOR LOBBIES- TABLE 403.3. | | | | 49) M1.11.1A: FSD'S MISSING AT THE AIR INTAKE LOUVER | | AND DUCT PENETRATION INTO THE STAIR SHAFT. | | | | 50) M1.11.1D: FSD'S MISSING AT THE AIR INTAKE AND | | RELIEF LOUVER PENETRATION INTO THE STAIR SHAFT. | | | | 51) M1.11.1A M1.11.1B, M1.11.1C, & M1.11.1D: WIND LOAD | | ENGINEERING REQUIRED FOR INSTALLATION OF ALL ROOFTOP | | EQUIPMENT AND APPLIANCES INCLUDING THE O/A UNITS, THE | | SPLIT AND MINI SPLIT CONDENSERS, THE FANS, THE | | DUCTWORK, THE REFRIGERANT PIPING ENCLOSURE ETC.- | | SECTION 301.15 AND SECTION 1609 FBC-14 BUILDING. | | | | 52) REFER TO SHEET M4.04 & SLS SMOKE CONTROL REPORT- | | SUMMARY OF RESULTS (PAGE 28): | | | | A) STAIR #2 FAN IS SPECIFIED AT 10,000 CFM IN THE | | SUMMARY, 11,000 CFM IN THE SCHEDULE. | | | | B) SUMMARY IS INDICATING PRESSURIZATION AND EXHAUST | | CFMS FOR STORY 3 THROUGH 8, HOWEVER THE CFMS SPECIFIED | | THERE APPEAR TO RELATE ONLY TO STORY 5-10 (SEF-1 & 2). | | STORIES 9 & 10 ARE EXCLUDED FROM THE SUMMARY. | | ADDITIONALLY, IT APPEARS THAT STORY 3 & 4 HAVE LESS | | EXHAUST CFMS ON THE PLAN THEN WHAT IS SHOWN IN THE | | SUMMARY. | | | | C) SUMMARY SPECIFIES 1000 CFMS FOR 2ND STORY CORRIDOR- | | 725 CFMS PROVIDED. | | D) SUMMARY SPECIFIES 6 AIR CHANGES PER HOUR FOR THE | | LOBBY AND AMENITIES AREAS. VERIFY THAT OPERATION OF | | SEF- 3, 4, & 5 ARE MEETING THOSE REQUIREMENTS. | | | | 53) M2.1.1, UNIT D2-1: IT APPEARS THAT THE LOCATION OF | | THE LOUVERED RETURN OPENING FOR AC-5T WILL BE RETURNING | | AIR FROM THE KITCHEN AND COOKING APPLIANCES WHICH IS | | PROHIBITED PER SECTION 918.6 (5) FBC-14 MECHANICAL. | | PLEASE CONSIDER THIS A "TYPICAL" COMMENT THAT WILL | | APPLY TO ALL UNITS WITH SIMILAR CONDITIONS. | | | | 54) M2.1.1: A DUCT SMOKE DETECTOR IS REQUIRED IN THE | | RETURN AIR SYSTEM OF AC-5T PER SECTION 606.2.1. PLEASE | | NOTE THAT AN EXEMPTION CAN BE APPLIED IF THE | | MANUFACTURER'S SPECIFICATIONS INDICATE THE SYSTEM IS | | NOT CAPABLE OF PRODUCING OVER 2000 CFMS OF SUPPLY AIR. | | . PLEASE CONSIDER THIS A "TYPICAL" COMMENT THAT WILL | | APPLY TO ALL UNITS WITH 5-TON OR GREATER SYSTEMS. | | | | 55) M2.2.1 & M2.4.1, UNITS 303, 304, 307, 308: PROVIDE | | RETURN AIR FROM THE BEDROOMS- SECTION 601.5. | | | | 56) M2.3.1, UNITS 305 & 306: PROVIDE RETURN AIR FROM | | THE BEDROOMS- SECTION 601.5. | | | | 57) M2.4.1: SEE COMMENTS #56 & 77. | | | | 60) M2.5.1, UNIT 310: PROVIDE RETURN AIR FROM THE | | BEDROOM- SECTION 601.5. | | | | 61) M2.6.1, UNIT 311: PROVIDE RETURN AIR FROM THE | | BEDROOM- SECTION 601.5. | | | | 62) M2.7.1, UNIT 602, 603: THE 10"X6" RETURN TRANSFER | | DUCTS FROM THE BEDROOMS ARE UNDERSIZED- SECTION | | 601.5(1) & (3). | | | | 63) M2.9.1, UNIT 607: THE 12"X6" RETURN TRANSFER DUCT | | FROM THE MASTER BEDROOM IS UNDERSIZED- | | SECTION 601.5(1) & (3). | | | | 64) M2.10.1, UNIT 609: THE 16"X6" RETURN TRANSFER DUCT | | FROM THE MASTER BEDROOM IS UNDERSIZED- SECTION 601.5(1) | | & (3). | | | | 65) M2.11.1, UNIT 609: THE 16"X6" RETURN TRANSFER DUCT | | FROM THE MASTER BEDROOM IS UNDERSIZED- SECTION 601.5(1) | | & (3). | | | | 66) M2.12.1, UNIT 614: THE AC CALCULATION IS INDICATING | | THE 2.5-TON SYSTEM (C2-1) SELECTED IS OVERSIZED- | | SECTION C403.2.2 FBC-14 ENERGY CONSERVATION. | | | | 67) M2.12.1, UNIT 614: THE 12"X6" RETURN TRANSFER DUCT | | FROM THE MASTER BEDROOM IS UNDERSIZED- SECTION 601.5(1) | | & (3). | | | | 68) M2.15.1, UNIT 624: PROVIDE RETURN AIR FROM THE | | MASTER BEDROOM- SECTION 601.5. | | | | 69) M2.15.1, UNIT 623: THE 10"X6" RETURN TRANSFER DUCT | | FROM THE MASTER BEDROOM IS UNDERSIZED- SECTION 601.5(1) | | & (3). | | | | 70) M2.17.1, UNIT 630: : PROVIDE RETURN AIR FROM THE | | BEDROOM- SECTION 601.5. | | | | 71) M2.21.1, UNIT 639: THE 10"X6" RETURN TRANSFER DUCTS | | FROM THE BEDROOMS ARE UNDERSIZED- SECTION 601.5(1) & | | (3). | | | | 72) M2.21.1, UNIT 639: THE AC SYSTEM SIZE IS NOT | | SPECIFIED ON THE PLAN. | | | | 73) M2.27.1, UNIT 502 &1002: THE 10"X6" RETURN TRANSFER | | DUCT FROM THE MASTER BEDROOM IS UNDERSIZED- SECTION | | 601.5(1) & (3). | | | | 74) M2.28.1, UNITS 501 & 1001: A) THE AC SYSTEM SIZE IS | | NOT SPECIFIED ON THE PLAN. B) THE 10"X6" RETURN | | TRANSFER DUCT FROM THE MASTER BEDROOM IS UNDERSIZED- | | SECTION 601.5(1) & (3). | | | | 75) M2.30.1, UNIT 1039: THE 16"X6" RETURN TRANSFER DUCT | | FROM THE MASTER BEDROOM IS UNDERSIZED- SECTION 601.5(1) | | & (3). | | | | 76) M2.33.1, UNIT 539: A) THE AC SYSTEM SIZE IS NOT | | SPECIFIED ON THE PLAN. B) THE 16"X6" RETURN TRANSFER | | DUCT FROM THE MASTER BEDROOM IS UNDERSIZED- SECTION | | 601.5(1) & (3). | | | | 77) REVIEW OF THE AC CALCULATIONS AND THE SYSTEMS | | SELECTED INDICATES THAT SOME OF THE SYSTEMS HAVE BEEN | | OVERSIZED. PLEASE REVIEW THE LIST OF SYSTEMS BELOW AND | | SECTION C403.2.2 FBC-14 ENERGY CONSERVATION. | | 1) M2.2.1- UNIT 302 (C2-2) | | 2) M2.2.1- UNIT 304 (S9-1) | | 3) M2.3.1- UNIT 305 (S9-1) | | 4) M2.5.1- UNIT 309 (C1-1) | | 5) M2.6.1- UNIT 311 (S6-1) | | 6) M2.12.1- UNIT 615 (C1-1) | | 7) M2.12.1- UNIT 614 (C2-1) | | 8) M2.13.1- UNIT 617 (A4-1) | | 9) M2.13.1- UNIT 616 (B1-1) | | 10) M2.15.1- UNIT 623 (D1-1) | | 11) M2.23.1- UNITS 536 & 1036 (A5-2) | | 12) M2.24.1- UNITS 541 & 1041 (A10-1) | | 13) M2.27.1- UNITS 524 (C6-1) | | 14) M2.28.1- UNITS 523 & 1023 (D1-1) | | 15) M2.31.1- UNITS 516 & 1016 (B1-1) | | 16) M2.31.1- UNITS 517 & 1017 (A4-1) | | 17) M2.33.1- UNITS 515 & 1015 (C1-1) | | | | 78) REQUIRED SUBMITTALS: SMOKE CONTROL FANS, AC STANDS | | AND CURBS, FAN CURBS, EXHAUST AND AIR INTAKE LOUVERS, | | FIRE DAMPERS AND FIRE/SMOKE DAMPERS, DUCT SMOKE | | DETECTORS, GENERATOR, FIRE WRAPPING, X-VENTS, CO AND | | NO2 SENSORS, RESIDENTIAL DRYERS AND RANGE HOODS. | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | RE-SUBMITTAL FORM. | | | | CHRISTOPHER L. COLE | | MECHANICAL PLANS EXAMINER | | 401 CLEMATIS STREET | | WEST PALM BEACH FL 33401 | | 561-805-6719 | | [email protected] | | | | |
|
|
Review Stop |
NFIP |
NFIP REVIEW ACTIVITY |
Rev No |
1 |
Status |
N |
Date |
2019-10-18 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2017-12-14 |
Time |
07:18 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2017-12-12 |
Time |
06:16 |
Sent To |
|
|
Notes |
2017-12-14 07:19:12 | ALTHOUGH THIS WAS DESIGNED TO COMPLY WITH THE | | REQUIREMENTS OF THE ADJACENT FLOOD ZONE AND FUTURE | | FLOOD MAPS, THIS STRUCTURE WAS NOT LOCATED IN A SFHA AT | | THE TIME OF PERMITTING. | | | | |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
4 |
Status |
P |
Date |
2018-05-21 |
|
|
Cont ID |
|
Sent By |
gjohnson |
Date |
2018-05-21 |
Time |
15:24 |
Rev Time |
0.00 |
Received By |
gjohnson |
Date |
2018-05-21 |
Time |
15:24 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
3 |
Status |
F |
Date |
2018-05-16 |
|
|
Cont ID |
|
Sent By |
gjohnson |
Date |
2018-05-16 |
Time |
17:18 |
Rev Time |
0.00 |
Received By |
gjohnson |
Date |
2018-05-15 |
Time |
16:43 |
Sent To |
|
|
Notes |
2018-05-16 17:19:48 | 3RD REVIEW: FBC 2014 5TH EDITION | | | | PLUMBING COMMENTS: | | | | 1.AT THIS TIME I AM UNABLE TO COMPLETE THE PLUMBING | | REVIEW DUE TO THE FACT THAT THE FOLLOWING SHEETS DID | | NOT DOWN LOAD ONTO OUR SOFTWARE PROPERLY PLEASE CONTACT | | CAROLINE PUELL @ 561-805-6659 OR LAURA MARCHANT @ | | 561-805-6658. | | HERE ARE THE SHEETS : | | P1.1.1 B + C + D | | P1.1.2 A + D | | P1.2.1 B + C + D | | P1.3.1 C | | P1.4.1. A + B + C + D | | P1.5.1 A + B | | P3.13.1 | | | | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT | | CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID | | THE PREVIOUSLY REVIEWED SHEETS. | | | | GEORGE JOHNSON | | PLUMBING PLANS EXAMINER | | CITY OF WEST PALM BEACH | | 561-805-6711 | | [email protected] | | |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
F |
Date |
2018-02-20 |
|
|
Cont ID |
|
Sent By |
gjohnson |
Date |
2018-02-20 |
Time |
08:04 |
Rev Time |
0.00 |
Received By |
gjohnson |
Date |
2018-02-16 |
Time |
11:17 |
Sent To |
|
|
Notes |
2018-02-20 08:18:47 | 1ST REVIEW: FBC 2017 6TH EDITION | | | | PLUMBING COMMENTS: | | | | 1. SHT. P1.1.1A, B, C, D THE SANITARY STACKS ARE | | LABELED ALL THE SAME MATCHING THE NOTES PLEASE LABEL TO | | MATCH THE ISOMETRIC DRAWINGS. PER WPB AMEND TO FBC | | 107.3.5.1.3(13) | | 2. IF YOU ARE CAPPING THE GREASE WASTE UNDER THE SLAB | | PLEASE INDICATE ON THE PLAN HOW IT WILL BE LOCATED IN | | THE FUTURE. PER WPB AMEND TO FBC 107.2.1 | | 3. SHT. P3.1.1 IT APPEARS THAT SANITARY STACK #17 IS | | LABELED AS #19 PLEASE CLARIFY. PER WPB AMEND TO FBC | | 107.2.1 | | 4. SHT. P3.1.1 THE 4? BUILDING DRAIN BETWEEN STACK #26 | | AND #27 IS UNDER SIZED. PER FBC PL TABLE 710.1(1) | | 5. SHT. P1.1.1A, B, C, D, PLEASE LABEL THE STORM RISERS | | TO MATCH THE ISOMETRIC DRAWINGS ON P3.11.1 PER WPB | | AMEND TO FBC 107.2.1 | | 6. SHT. P1.1.1D NOTE #3 LIST A 15? STORM DRAIN THE | | ISOMETRIC ON P3.11.1 SHOWS A 16? THE 15? IS UNDER | | SIZED. PER FBC PL TABLE 1106.3 | | 7. SHT. P1.1.1D NOTE #7 LIST 12? STORM THE ISO SHOWS | | 16? PLEASE CLARIFY. PER WPB AMEND TO FBC 107.2.1 | | 8. IN PREVIOUS COMMENT #30 IS WAS ASKING FOR THE SPECS | | FOR THE PUMPS YOUR RESPONSE WAS FOR THE GREASE | | INTERCEPTOR I STILL NEED THOSE SPECS FOR THE BOOSTER | | PUMPS THE CAN BE SUBMITTALS IF YOU REQUESTED. PER WPB | | AMEND TO FBC 107.3.4.2 | | 9. SHT. P3.13.1 THE 8? HORIZONTAL STORM DRAIN BETWEEN | | RISER E AND F IS UNDER SIZED THE MAX SQFT FOR 8? @ | | 1/8FT IS 9200SQFT. PER FBC PL TABLE 1106.2 | | 10. PER FBC PL SIZING TABLE 1106.2 IT ONLY GOES UP TO | | 15? PLEASE PROVIDE THE CALCULATION TO SIZE THE 16? | | STORM. PER WPB AMEND TO FBC 107.2.1 | | 11. IN THE SPEC B BATHROOMS SUCH AS THE MASTER IN UNIT | | 01 D1-1 WHERE THE TOILET IS ADJACENT TO A SHOWER | | BACKING OR REINFORCEMENT WILL BE REQUIRED FOR A FOLD UP | | GRAB BAR PLEASE PROVIDE A DETAIL SHOWING THE DIMENSIONS | | AND HOW THIS WILL BE DONE. PER FHA DESIGN MANUAL | | REQUIREMENT #6 PG 6.6+6.7 | | 12. IT APPEARS THAT YOU ARE USING MULTIPLE SAFE HARBOR | | DESIGN DOCUMENTS IT IS MY UNDERSTANDING THAT A PROJECT | | SHOULD BE DESIGNED USING ONLY 1 SPECIFIC DESIGN | | DOCUMENT PLEASE CLARIFY . | | 13. PLEASE SHOW THE DIMENSIONS ON THE CLEAR FLOOR SPACE | | AT THE FIXTURES. PER WPB AMEND TO FBC 107.2.1 | | | | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT | | CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID | | THE PREVIOUSLY REVIEWED SHEETS. | | | | GEORGE JOHNSON | | PLUMBING PLANS EXAMINER | | CITY OF WEST PALM BEACH | | 561-805-6711 | | [email protected] | | |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
F |
Date |
2017-12-11 |
|
|
Cont ID |
|
Sent By |
gjohnson |
Date |
2017-12-11 |
Time |
12:53 |
Rev Time |
0.00 |
Received By |
gjohnson |
Date |
2017-12-04 |
Time |
18:04 |
Sent To |
|
|
Notes |
2017-12-11 12:54:42 | 1ST REVIEW: FBC 2014 5TH EDITION | | | | PLUMBING COMMENTS: | | | | 1. SHT. A10.0.0 | | A) DETAIL #1 THE CENTERLINE OF THE TOILET IS SHOWN AS | | 18? ABSOLUTE DIMENSION, ALL OF THE DIMENSIONS SHOWN ON | | THE ENLARGED UNIT PLAN SHEETS ARE OVER 18? PLEASE | | CLARIFY. PER WPB AMEND TO FBC 107.2.1 | | B) ON THE FIGURE SHOWING THE BACKING ON THE BACK WALL | | OF THE TOILET PLEASE PROVIDE DIMENSION FOR THE TOTAL | | LENGTH OF THE BACKING. PER FHA GUIDELINES REQUIREMENT 6 | | FIG. 3 | | C) ON THE FIGURE SHOWING THE BACKING ON THE BACK WALL | | OF THE TUB PROVIDE THE DIMENSION FROM THE TOP OF THE | | TUB TO THE BOTTOM OF THE BACKING. PER FHA GUIDELINES | | REQUIREMENT 6 FIG. 4 | | | | 2. SHT. A10.0.0 PLEASE CLARIFY EXACTLY WHICH DESIGN | | DOCUMENTS WERE USED FOR MEETING THE FHA REQUIREMENTS OF | | THIS PROJECT. PER WPB AMEND TO FBC 107.2.1 | | | | 3. SHT. LS.7.1 WHAT OCCUPANT LOAD ARE YOU USING FOR | | PLUMBING FIXTURE COUNT PLEASE CLARIFY. PER WPB AMEND TO | | FBC 107.2.1 | | | | 4. SHTS. A9.70.5, A9.73.5, A9.74.5, A9.75.5 PLEASE | | PROVIDE DIMENSIONS SHOWING COMPLIANCE WITH KNEE AND TOE | | CLEARANCE FOR LAVATORY?S. PER ANSI A117.1 SEC 419 FIG. | | 31 | | | | 5. SHTS. A9.70.5, A9.73.5, A9.74.5, A9.75.5 PROVIDE | | DIMENSION TO SHOW COMPLIANCE WITH THE LENGTH OF THE | | GRAB BAR AND THE DISTANCE OF THE END OF THE GRAB BAR | | OFF THE SIDE WALL AND BACK WALL. PER ANSI A!!7.1 SEC | | 417 FIG. 30 | | | | 6. SHT. A99.70.5 DETAIL #3 COFFEE BAR PER FHA | | GUIDELINES COMMON AREA CHART THE COFFEE BAR WOULD FALL | | UNDER #14 AND SHALL COMPLY WITH ANSI A117.1 SEC 4.1- | | 4.30 THE HEIGHT OF THE COFFEE BAR SHALL BE MIN 28? MAX | | 34? OFF FINISHED FLOOR. AND A 30? X 48? CLEAR FLOOR | | SPACE PER ANSI 4.30.4, 4.30.2, 4.30.3 | | | | 7. WILL THE POOL AND DECK EVER BE LEASED OUT FOR | | SPECIAL EVENTS PLEASE PROVIDE RESPONSE IN SIGNED AND | | SEALED LETTER. PER WPB AMEND TO FBC 107.2.1 | | | | 8. SHT. A9.73.1 THE SINK IN THE MEDIA ROOM SHALL COMPLY | | WITH ANSI A117.1 SEC 1.19.3 FIG 31 + 32 | | | | 9. SHT. A9.73.5 PLEASE SHOW COMPLIANCE WITH ANSI 4.15 | | +4. 4.1 | | | | 10. SHT. A9.74.3, A9.76.3 SHOW CLEAR FLOOR SPACE FOR | | THE TOILET. PER WPB AMEND TO FBC 107.2.1 | | | | 11. SHT. A9.74.5, A9.75.5 PLEASE SHOW COMPLIANCE WITH | | ANSI 4.18 | | | | 12. THE SINKS IN THE BBQ AREA OF THE POOL DECK AND | | SUNSET DECK SHALL COMPLY WITH ANSI A117.1 SEC 4.19 | | | | 13. PLEASE SHOW THE DIMENSIONS ON THE CLEAR FLOOR | | SPACES FOR THE FIXTURES IN THE ADAPTABLE BATHROOMS IN | | THE DWELLING UNITS. PER FHA GUIDELINES REQUIREMENT 7 | | FIGURE 7(A)(B)(C)(D) | | | | 14. IN THE GUEST BATHROOM FHA DESIGN A THE CLEAR FLOOR | | SPACE FOR THE TUB SHALL EXTEND ALL THE WAT TO THE EDGE | | OF THE TUB. . PER FHA GUIDELINES REQUIREMENT 7 FIGURE | | 7(B) | | | | 15. PLEASE NUMBER THE RISERS AND STACKS ON THE FLOOR | | PLANS TO ALL THE RISER AND ISOMETRIC PLANS. PER WPB | | AMEND TO FBC 107.2.1 | | | | 16. ON THE SANITARY COLLECTION AND RISER PLANS IT IS | | DIFFICULT TO MATCH UP THE STACKS TO THE TAG NUMBER | | PLEASE DRAW A LINE CONNECTING THE TAG TO THE STACK. PER | | WPB AMEND TO FBC 107.2.1 | | | | 17. AAV ARE NOT PERMITTED BELOW THE 4TH BRANCH | | INTERVALS FROM THE TOP OF THE STACK UNLESS THEY HAVE A | | RELIEF VENT CONNECTING TO A VENT STACK OR STACK VENT. | | PER FBC PL 918.3.1 | | | | 18. PLEASE PROVIDE A LIST WITH PLAN SHEETS P2.1.1 | | THROUGH P2.22.1 MATCHED WITH THE UNIT NUMBERS. PER WPB | | AMEND TO FBC 107.2.1 | | | | ON THE SANITARY COLLECTION PLAN SHEETS THERE ARE VENT | | AND DRAIN PIPES THAT ARE NOT CONNECTED PLEASE PROVIDE | | SOME KIND OF IDENTIFICATION AS TO WHERE THESE PIPE | | CONNECT. PER WPB AMEND TO FBC 107.2.1 | | | | 19. PLEASE LABEL THE STORM PIPING AND THE PAD, CD, AD, | | DD,OD ON THE FLOOR PLANS SO THEY MATCH UP AND CAN BE | | EASILY IDENTIFIED ON THE COLLECTION AND RISER DRAWINGS. | | PER WPB AMEND TO FBC 107.2.1 | | | | 20. SHT. A8.1.2 DETAIL #1 HOW WILL THE DRAIN BE | | CONNECTED TO ROOF SLAB. . PER WPB AMEND TO FBC 107.2.1 | | | | 21. SHT. A8.1.1 PROVIDE DIMENSIONS FOR EMERGENCY | | SCUPPERS. PER FBC PL 1108.3 | | | | 22. P1.11.1A, P1.11.1B, P1.11.1C, P1.11.1D PLEASE LABEL | | EACH EMERGENCY WITH THE SQFT IT WILL BE DRAINING. PER | | FBC PL 1108.3 | | | | 23. PROVIDE DETAIL SHOWING DIMENSION FROM THE BOTTOM OF | | THE EMERGENCY SCUPPER TO THE LOWEST POINT OF ROOF BEING | | SERVED TO SHOW COMPLIANCE WITH FBC PL 1101..7 | | | | 24. SHT. P3.14.1 KEY NOTE #2 PROVIDE LOCATION. PER WPB | | AMEND TO FBC 107.2.1 | | | | 25. SHT. P3.14.1 PLEASE SHOW FLOOR LEVEL ON THE | | ISOMETRIC DRAWING. PER WPB AMEND TO FBC 107.2.1 | | | | 26. SHT. P3.16.1 LABEL ALL PIPES AND PROVIDE KEY NOTE. | | PER WPB AMEND TO FBC 107.2.1 | | | | 27. SHT. P3.23.1 PLACE NOTE ON PLAN THE NON POTABLE | | WATER PIPING SHALL BE LABELED. PER FBC PL 606.7 | | | | 28. SHT. P4.1.1 THE 4? DOUBLE SANITARY TEE CANNOT BE | | USED AS A SAMPLING PORT A 4? TWO WAY CLEAN OUT IS | | ALLOWED. PER CITY WPB UTILITIES DEPT. | | | | 29. PROVIDE MANUFACTURE SIZING CALCULATIONS FOR THE | | GREASE INTERCEPTOR. PER FBC PL 1003.3.4 | | | | 30. SHT. P4.4.1 PROVIDE THE MANUFACTURE SPECIFICATIONS | | THAT SHOW THE UL LISTING NUMBERS AND THE NSF LISTING | | NUMBERS AND ANY OTHER STANDARDS THAT THEY MEET. PER WPB | | AMEND TO FBC 107.2.1 | | | | 31. SHT. P3.13.1 THE 8? HORIZONTAL DRAIN CONNECTING TO | | RISER A IS OVER THE SQFT FOR 8? PIPE. PER FBC PL TABLE | | 1106.3 | | | | 32. SHT. P3.13.1 THE 16? HORIZONTAL DRAIN LINE IS | | MISSING THE SQFT PLEASE CLARIFY. PER WPB AMEND TO FBC | | 107.2.1 | | | | 33. SHT. P3.13.1 RISER #1 IS MISSING SQFT PLEASE | | CLARIFY. PER WPB AMEND TO FBC 107.2.1 | | | | 34. SHT. P3 .12.1 THE 6? HORIZONTAL DRAIN CONNECTING TO | | RISER I IS MISSING SQFT PER WPB AMEND TO FBC 107.2.1 | | | | 35. SHT. P3.11.1 THE 4? HORIZONTAL BRANCH DRAIN | | CONNECTING THE DD 1802 SQFT IS UNDERSIZED. PER FBC PL | | TABLE 1106.3 | | | | 36. SHT. P3.11.1 SIZE THE HORIZONTAL BRANCHES ON RISERS | | C, D, E. PER WPB AMEND TO FBC 107.2.1 | | | | 37. PLACE NOT ON PLAN POOL PLANS FOR REFERENCE ONLY | | WILL BE REVIEWED UNDER SEPARATE POOL PERMIT. | | | | | | | | | | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT | | CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID | | THE PREVIOUSLY REVIEWED SHEETS. | | | | GEORGE JOHNSON | | PLUMBING PLANS EXAMINER | | CITY OF WEST PALM BEACH | | 561-805-6711 | | [email protected] | | |
|
|
Review Stop |
P-GREASE |
GREASE INTERCEPTOR/TRAP REVIEW |
Rev No |
1 |
Status |
P |
Date |
2019-04-11 |
|
|
Cont ID |
|
Sent By |
gjohnson |
Date |
2019-04-11 |
Time |
12:31 |
Rev Time |
0.00 |
Received By |
gjohnson |
Date |
2019-04-11 |
Time |
12:31 |
Sent To |
|
|
Notes |
|
|
Review Stop |
R |
ROOF PLAN REVIEW |
Rev No |
1 |
Status |
N |
Date |
2018-06-04 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2018-06-04 |
Time |
10:05 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2018-06-04 |
Time |
10:05 |
Sent To |
|
|
Notes |
2018-06-04 10:06:08 | ROOF PRODUCT APPROVALS REVIEWED BY DESIGNER OF RECORD | | ARE TO BE SUBMITTED WITH ROOF PERMIT APPLICATION PRIOR | | TO INSTALLATION | | | | |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
4 |
Status |
P |
Date |
2018-06-04 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2018-06-04 |
Time |
10:48 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2018-06-04 |
Time |
10:48 |
Sent To |
|
|
Notes |
2018-06-04 10:49:23 | ****PROVISOS**** | | | | SAMANTHA HILL | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6724 | | | | ARCHITECT - KEITH SPINA, GLIDDEN SPINA | | STRUCTURAL - ANDREW P. SULLIVAN, PE, MCNAMARA-SALVIA | | MEP - STEPHEN FELLERS, PE | | | | FS471, FS481 REQUIRE THAT DOCUMENTS PREPARED BY AN | | ENGINEER AND SUBMITTED FOR PUBLIC RECORD ARE TO BE | | SIGNED, SEALED, DATED ORIGINALS. | | | | 1. ARCH, CIVIL OK | | | | 2. THE NEW PLUMBING PAGES HAVE AN ERROR THAT THE | | SIGNATURE IS OK, BUT THERE ARE UNSIGNED CHANGES MADE | | AFTER SIGNING. I'VE SEEN THIS ERROR ASSOCIATED WITH | | UTILIZING A DIFFERENT SOFTWARE (BLUEBEAM?). | | | | PLUMBING HAS PASSED REVIEW. PLEASE CONTACT ME VIA EMAIL | | TO DISCUSS HOW THIS WILL BE RESOLVED. THIS WILL BE A | | PROVISO ITEM. | | | | 3. THE NEW MECHANICAL PAGES HAVE AN ERROR THAT THE | | SIGNATURE IS OK, BUT THERE ARE UNSIGNED CHANGES MADE | | AFTER SIGNING. I'VE SEEN THIS ERROR ASSOCIATED WITH | | UTILIZING A DIFFERENT SOFTWARE (BLUEBEAM?). | | | | AC CALCS PREPARED BY STEPHEN FELLER, PE ARE NOT | | DIGITALLY SIGNED AND SEALED. A DIGITALLY SIGNED AND | | SEALED DOCUMENT WILL BE REQUIRED AT THE SAME TIME THAT | | PLAN PAGES ARE ADDRESSED (PROVISO ITEM). | | | | SHEETS M5.0.0 (TWO DIFFERENT PAGES WITH SAME NUMBER, | | DIFFERENT RISER INFORMATION), M5.0.1, M5.0.2 (TWO | | DIFFERENT PAGES WITH SAME NUMBER, DIFFERENT | | INFORMATION) | | | | ENERGY CALCS - OK | | FIRE STANDPIPE CALCS - OK | | | | 4. ELECTRICAL SHEETS OK | | | | 5. SLS CONSULTING, INC. FIRE PROTECTION ENGINEERS - | | SMOKE CONTROL RATIONAL ANALYSIS - OK (4/13/18 VERSION) | | | | 6. THE COVER SHEET AND INDEX PAGES ARE NUMBERED 570, | | 571 AND 572, WHICH WILL MAKE THEM PRINT IN THE MIDDLE | | OF THE PLAN SET. ARE THESE DUPLICATES OF THE COVER | | SHEET AND INDEX PAGES AT THE BEGINNING OF THE DOCUMENT? | | CAN THEY BE VOIDED OR DELETED? | | | | | | | | | | | | | | |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
3 |
Status |
F |
Date |
2018-05-26 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2018-05-26 |
Time |
13:51 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2018-05-13 |
Time |
13:00 |
Sent To |
|
|
Notes |
2018-05-13 13:05:41 | ****CORRECTIONS**** | | | | SAMANTHA HILL | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6724 | | | | ARCHITECT - KEITH SPINA, GLIDDEN SPINA | | STRUCTURAL - ANDREW P. SULLIVAN, PE, MCNAMARA-SALVIA | | MEP - STEPHEN FELLERS, PE | | | | FS471, FS481 REQUIRE THAT DOCUMENTS PREPARED BY AN | | ENGINEER AND SUBMITTED FOR PUBLIC RECORD ARE TO BE | | SIGNED, SEALED, DATED ORIGINALS. | | | | 1. ARCH, CIVIL OK | | | | 2. THE NEW PLUMBING PAGES HAVE AN ERROR THAT THE | | SIGNATURE IS OK, BUT THERE ARE UNSIGNED CHANGES MADE | | AFTER SIGNING. I'VE SEEN THIS ERROR ASSOCIATED WITH | | UTILIZING A DIFFERENT SOFTWARE (BLUEBEAM?). | | | | PLUMBING HAS PASSED REVIEW. PLEASE CONTACT ME VIA EMAIL | | TO DISCUSS HOW THIS WILL BE RESOLVED. THIS WILL BE A | | PROVISO ITEM. | | | | 3. THE NEW MECHANICAL PAGES HAVE AN ERROR THAT THE | | SIGNATURE IS OK, BUT THERE ARE UNSIGNED CHANGES MADE | | AFTER SIGNING. I'VE SEEN THIS ERROR ASSOCIATED WITH | | UTILIZING A DIFFERENT SOFTWARE (BLUEBEAM?). | | | | MECHANICAL HAS FAILED REVIEW. PLEASE CONTACT ME VIA | | EMAIL REGARDING HOW THIS WILL BE ADDRESSED. NEW SHEETS | | SHOULD HAVE THE SIGNATURE ISSUE CORRECTED, BUT SHEETS | | WHICH DO NOT CHANGE SHOULD NOT BE CORRECTED AND | | UPLOADED. THE SIGNATURE ERROR ISSUE WILL BE A PROVISO | | ITEM. | | | | AC CALCS PREPARED BY STEPHEN FELLER, PE ARE NOT | | DIGITALLY SIGNED AND SEALED. A DIGITALLY SIGNED AND | | SEALED DOCUMENT WILL BE REQUIRED AT THE SAME TIME THAT | | PLAN PAGES ARE ADDRESSED (PROVISO ITEM). | | | | SHEETS M5.0.0 (TWO DIFFERENT PAGES WITH SAME NUMBER, | | DIFFERENT RISER INFORMATION), M5.0.1, M5.0.2 (TWO | | DIFFERENT PAGES WITH SAME NUMBER, DIFFERENT | | INFORMATION) | | | | ENERGY CALCS - OK | | FIRE STANDPIPE CALCS - OK | | | | 4. ELECTRICAL SHEETS OK | | | | 5. SLS CONSULTING, INC. FIRE PROTECTION ENGINEERS - | | SMOKE CONTROL RATIONAL ANALYSIS - OK (4/13/18 VERSION) | | | | 6. THE COVER SHEET AND INDEX PAGES ARE NUMBERED 570, | | 571 AND 572, WHICH WILL MAKE THEM PRINT IN THE MIDDLE | | OF THE PLAN SET. ARE THESE DUPLICATES OF THE COVER | | SHEET AND INDEX PAGES AT THE BEGINNING OF THE DOCUMENT? | | CAN THEY BE VOIDED OR DELETED? | | | | | | | | | | | | | | |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
F |
Date |
2018-03-13 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2018-03-13 |
Time |
14:29 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2018-03-13 |
Time |
13:58 |
Sent To |
|
|
Notes |
2018-03-13 13:58:38 | ****CORRECTIONS**** | | | | SAMANTHA HILL | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6724 | | | | FBC = FLORIDA BUILDING CODE, 5TH EDITION (2014) | | FBC B = FBC BUILDING | | FBC EB = FBC EXISTING BUILDING | | FBC A = FBC ACCESSIBILITY | | FBC EC = FBC ENERGY CONSERVATION | | | | ARCHICTECTURAL SHEETS - KEITH SPINA, GLIDDEN SPINA + | | PARTNERS: DIGITAL SEAL/SIGNATURE AND TITLE BLOCK COMPLY | | WITH FS481, BUT NEW SHEETS SUBMITTED 3RD CYCLE NEED | | REVIEW | | | | CIVIL SHEETS - GREGORY F. BOLEN, PE, SIMMONS & WHITE, | | INC.: DIGITAL SEAL/SIGNATURE AND TITLE BLOCK COMPLY | | WITH FS481, BUT NEW SHEETS SUBMITTED 3RD CYCLE NEED | | REVIEW | | | | LANDSCAPE, IRRIGATION - BRYAN DONAHUE, RLA, WGI: BRYAN | | DONAHUE DIGITAL SEAL/SIGNATURE COMPLY WITH FS481. I WAS | | UNABLE TO LOCATE LANDSCAPE ARCHITECT BUSINESS NUMBER | | 7055 AT DBPR WEBSITE (SEARCHED LICENSE NUMBER AND NAME | | OF "WGI"). PLEASE ADDRESS. | | REGARDING IP SHEETS, PLEASE NOTE SCOPE IN FS | | 481.303(7); CONSULT WITH YOUR BOARD TO DETERMINE WHO | | CAN SIGN/SEAL THESE PAGES | | | | STRUCTURAL SHEETS - ANDREW P. SULLIVAN, PE, | | MCNAMARA-SALVIA: DIGITAL SEAL/SIGNATURE AND TITLE BLOCK | | COMPLY WITH FS471, BUT NEW SHEETS SUBMITTED 3RD CYCLE | | NEED REVIEW | | | | MECHANICAL, PLUMBING, ELECTRICAL, FIRE PROTECTION | | SHEETS - STEVEN FELLER PE, STEVEN FELLER PE LLC: | | DIGITAL SEAL/SIGNATURE AND TITLE BLOCK COMPLY WITH | | FS471, BUT NEW SHEETS SUBMITTED 23RD CYCLE NEED REVIEW. | | | | | | LOW VOLTAGE PLANS (SHEETS 840 LVC1 THROUGH 849 CHSLV | | 7.1), NOT SIGNED AND SEALED. LOW VOLTAGE REQUIRES A | | SEPARATE PERMIT; THESE PAGES HAVE NOT BEEN REVIEWED. | | | | POOL PLANS, OFELIA TABOADA, PE AND AQUADYNAMICS (SHEETS | | 850 SP1.0 THROUGH 862 SP2.04), PLANS ARE DIGITALLY | | SIGNED AND SEALED, BUT A SEPARATE PERMIT FOR POOL IS | | REQUIRED. PLANS HAVE BEEN MARKED "FOR REFERENCE ONLY". | | | | SUPPORTING DOCUMENTS (PROVISO: ANY NEW DOCUMENTS | | SUBMITTED FOR ANOTHER REVIEW CYCLE NEED REVIEW): | | ENERGY CALCS INPUT REPORT SIGNATURE/SEAL OK | | ENERGY CALCULATION REPORT SIGNATURE/SEAL OK | | EXPEDITE EMAIL RE: EXPEDITE: PLEASE PROVIDE (DOCUMENT | | ON FILE DOES NOT INCLUDE EMAIL OR LETTER FROM MAYOR | | AUTHORIZING EXPEDITED REVIEWS WITH NO FEE) | | FIRE STANDPIPE CALCS SIGNATURE/SEAL OK | | | | SMOKE CONTROL RATIONAL ANALYSIS: THIS DOCUMENTS LACKS | | SIGNATURE/SEAL, LACKS TITLE BLOCK IN COMPLIANCE WITH | | FS471 AND FAC61G15-23.002 (CERTIFICATE OF AUTHORIZATION | | FOR SLS FIRE PROTECTION ENGINEERS, NAME AND LICENSE | | NUMBER OF INDIVIDUAL PREPARING THE DOCUMENT) | | | | HVAC CALCS: PREPARED BY STEVEN FELLER, LACKS | | SIGNATURE/SEAL. | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
F |
Date |
2017-12-08 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2017-12-08 |
Time |
07:32 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2017-12-08 |
Time |
06:10 |
Sent To |
|
|
Notes |
2017-12-08 07:23:28 | ****CORRECTIONS**** | | | | SAMANTHA HILL | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6724 | | | | FBC = FLORIDA BUILDING CODE, 5TH EDITION (2014) | | FBC B = FBC BUILDING | | FBC EB = FBC EXISTING BUILDING | | FBC A = FBC ACCESSIBILITY | | FBC EC = FBC ENERGY CONSERVATION | | | | ARCHICTECTURAL SHEETS - KEITH SPINA, GLIDDEN SPINA + | | PARTNERS: DIGITAL SEAL/SIGNATURE AND TITLE BLOCK COMPLY | | WITH FS481, BUT NEW SHEETS SUBMITTED 2ND CYCLE NEED | | REVIEW | | | | CIVIL SHEETS - GREGORY F. BOLEN, PE, SIMMONS & WHITE, | | INC.: DIGITAL SEAL/SIGNATURE AND TITLE BLOCK COMPLY | | WITH FS481, BUT NEW SHEETS SUBMITTED 2ND CYCLE NEED | | REVIEW | | | | LANDSCAPE, IRRIGATION - BRYAN DONAHUE, RLA, WGI: BRYAN | | DONAHUE DIGITAL SEAL/SIGNATURE COMPLY WITH FS481. I WAS | | UNABLE TO LOCATE LANDSCAPE ARCHITECT BUSINESS NUMBER | | 7055 AT DBPR WEBSITE (SEARCHED LICENSE NUMBER AND NAME | | OF "WGI"). PLEASE ADDRESS. | | REGARDING IP SHEETS, PLEASE NOTE SCOPE IN FS | | 481.303(7); CONSULT WITH YOUR BOARD TO DETERMINE WHO | | CAN SIGN/SEAL THESE PAGES | | | | STRUCTURAL SHEETS - ANDREW P. SULLIVAN, PE, | | MCNAMARA-SALVIA: DIGITAL SEAL/SIGNATURE AND TITLE BLOCK | | COMPLY WITH FS471, BUT NEW SHEETS SUBMITTED 2ND CYCLE | | NEED REVIEW | | | | MECHANICAL, PLUMBING, ELECTRICAL, FIRE PROTECTION | | SHEETS - STEVEN FELLER PE, STEVEN FELLER PE LLC: | | DIGITAL SEAL/SIGNATURE AND TITLE BLOCK COMPLY WITH | | FS471, BUT NEW SHEETS SUBMITTED 2ND CYCLE NEED REVIEW. | | FS 471.0195, DBPR WEBSITE DOES NOT INDICATE THAT | | ENGINEER HAS COMPLETED ADVANCED FLORIDA BUILDING CODE | | COURSE. ENGINEER MAY HAVE ALREADY TAKEN THIS COURSE | | (WHICH WAS REQUIRED TO BE COMPLETED BY 6/30/2016, BUT | | EVIDENCE OF SUCH MUST BE SENT TO FBPE SO THE ENGINEER'S | | RECORD ON WWW.MYFLORIDALICENSE.COM CAN BE UPDATED. | | PLEASE ADDRESS. | | | | LOW VOLTAGE PLANS (SHEETS 840 LVC1 THROUGH 849 CHSLV | | 7.1), NOT SIGNED AND SEALED. LOW VOLTAGE REQUIRES A | | SEPARATE PERMIT; THESE PAGES HAVE NOT BEEN REVIEWED. | | | | POOL PLANS, OFELIA TABOADA, PE AND AQUADYNAMICS (SHEETS | | 850 SP1.0 THROUGH 862 SP2.04), FS 471.0195, DBPR | | WEBSITE DOES NOT INDICATE THAT ENGINEER HAS COMPLETED | | ADVANCED FLORIDA BUILDING CODE COURSE. ENGINEER MAY | | HAVE ALREADY TAKEN THIS COURSE (WHICH WAS REQUIRED TO | | BE COMPLETED BY 6/30/2016, BUT EVIDENCE OF SUCH MUST BE | | SENT TO FBPE SO THE ENGINEER'S RECORD ON | | WWW.MYFLORIDALICENSE.COM CAN BE UPDATED. PLEASE | | ADDRESS. | | | | SUPPORTING DOCUMENTS (PROVISO: ANY NEW DOCUMENTS | | SUBMITTED FOR ANOTHER REVIEW CYCLE NEED REVIEW): | | ENERGY CALCS INPUT REPORT SIGNATURE/SEAL OK | | ENERGY CALCULATION REPORT SIGNATURE/SEAL OK | | EXPEDITE EMAIL RE: EXPEDITE: PLEASE PROVIDE (DOCUMENT | | ON FILE DOES NOT INCLUDE EMAIL OR LETTER FROM MAYOR | | AUTHORIZING EXPEDITED REVIEWS WITH NO FEE) | | FIRE STANDPIPE CALCS SIGNATURE/SEAL OK | | | | SMOKE CONTROL RATIONAL ANALYSIS: THIS DOCUMENTS LACKS | | SIGNATURE/SEAL, LACKS TITLE BLOCK IN COMPLIANCE WITH | | FS471 AND FAC61G15-23.002 (CERTIFICATE OF AUTHORIZATION | | FOR SLS FIRE PROTECTION ENGINEERS, NAME AND LICENSE | | NUMBER OF INDIVIDUAL PREPARING THE DOCUMENT) | | | | HVAC CALCS: PREPARED BY STEVEN FELLER, LACKS | | SIGNATURE/SEAL. | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
|
|
Review Stop |
THRESHOLD |
THRESHOLD INSPECTOR DOCUMENTS |
Rev No |
4 |
Status |
P |
Date |
2018-06-04 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2018-06-04 |
Time |
10:03 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2018-06-04 |
Time |
10:03 |
Sent To |
|
|
Notes |
2018-06-04 10:05:15 | THRESHOLD STATEMENT ON INDEX PAGES (ARCH) | | THRESHOLD STATEMENT ON ALL STRUCTURAL PAGES | | | | SI AGREEMENT WAS PROVIDED WITH FOUNDATION PERMIT | | | | THRESHOLD INSPECTION PLAN ON S0.0.4 | | |
|
|
Review Stop |
THRESHOLD |
THRESHOLD INSPECTOR DOCUMENTS |
Rev No |
3 |
Status |
F |
Date |
2018-05-27 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2018-05-27 |
Time |
14:54 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2018-05-13 |
Time |
13:17 |
Sent To |
|
|
Notes |
2018-05-27 14:54:50 | SEE BUILDING REVIEW | | |
|
|
Review Stop |
THRESHOLD |
THRESHOLD INSPECTOR DOCUMENTS |
Rev No |
2 |
Status |
F |
Date |
2018-03-17 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2018-03-17 |
Time |
13:57 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2018-03-13 |
Time |
11:23 |
Sent To |
|
|
Notes |
2018-03-17 14:01:38 | ****CORRECTIONS**** | | | | SAMANTHA HILL | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6724 | | | | FBC = FLORIDA BUILDING CODE, 5TH EDITION (2014) | | FBC B = FBC BUILDING | | FBC EB = FBC EXISTING BUILDING | | FBC A = FBC ACCESSIBILITY | | FBC EC = FBC ENERGY CONSERVATION | | | | 1 A) 109.3.6.1 THRESHOLD INSPECTION PLAN. OK - SHEET | | S0.0.4. | | | | B) THRESHOLD INSPECTOR: WPB AMENDMENT 109.3.6.2 W.P.B. | | CONSTRUCTION SERVICES DEPARTMENT REQUEST FOR THRESHOLD | | BUILDINGS A SPECIAL INSPECTOR AS REQUIRED BY FL S S | | 553.79(5) FLORIDA STATUTES TO THE MINIMUM INSPECTIONS | | REQUIRED BY THIS CODE. THE THRESHOLD INSPECTION FORMS | | ARE REQUIRED TO BE FILED OUT BY ALL PARTIES WITH | | INTEREST, NOTARIZED AND RETURNED TO THIS OFFICE, AND | | REVIEWED AND APPROVED BEFORE PERMIT ISSUANCE WILL TAKE | | PLACE. CONTACT KEN CONRAD MANAGER OF THE SPECIAL | | INSPECTOR PROGRAM AT (561)805-6666 FOR FURTHER | | INFORMATION BEFORE THE PERMIT MAY BE ISSUED. | | | | AN AGREEMENT WAS PROVIDED FOR THE FOUNDATION PERMIT, | | AND CAN BE UTILIZED FOR THE BUILDING PERMIT. PLEASE ADD | | TO THE PERMIT RECORD IN PROJECTDOX. ALSO PROVIDE | | RESUMES FOR THE PROPOSED JOB INSPECTORS. WORK ON THE | | FOUNDATION PERMITS WERE NOT TO COMMENCE UNTIL RESUMES | | FOR THE SI AND INSPECTORS WERE PROVIDED. | | | | C) THRESHOLD BLDG., REQUIRED STATEMENT W.P.B. AMENDMENT | | 110.3.7.4.4, FS553.79(7)(D): ALL PLANS FOR THE BUILDING | | WHICH ARE REQUIRED TO BE SIGNED AND SEALED BY THE | | ARCHITECT OR ENGINEER OF RECORD CONTAIN A STATEMENT | | THAT, TO THE BEST OF THE ARCHITECT?S OR ENGINEER?S | | KNOWLEDGE, THE PLANS AND SPECIFICATIONS COMPLY WITH THE | | APPLICABLE MINIMUM BUILDING CODES AND THE APPLICABLE | | FIRESAFETY STANDARDS AS DETERMINED BY THE LOCAL | | AUTHORITY IN ACCORDANCE WITH THIS CHAPTER AND CHAPTER | | 633. | | | | W.P.B. AMENDMENT 110.3.7.4.4 ALL PLANS FOR THE BUILDING | | WHICH ARE REQUIRED TO BE SIGNED AND SEALED BY THE | | ARCHITECT OR ENGINEER OF RECORD CONTAIN A STATEMENT | | THAT, TO THE BEST OF THE ARCHITECT'S OR ENGINEER'S | | KNOWLEDGE, THE PLANS AND SPECIFICATIONS COMPLY WITH THE | | APPLICABLE FIRE-SAFETY STANDARDS AS DETERMINED BY THE | | LOCAL AUTHORITY IN ACCORDANCE WITH THIS SECTION AND 633 | | FLORIDA STATUTE. | | | | I WAS ABLE TO LOCATE THE STATEMENT FROM THE STRUCTURAL | | ENGINEER, BUT WAS NOT ABLE TO LOCATE THE STATEMENT FROM | | THE ARCHITECT. PLEASE ADVISE OR REVISE PLAN TO INCLUDE. | | | | D) FOR THE SPECIAL INSPECTOR PLEASE PROVIDE A RESUME' | | OF INSPECTION EXPERIENCE ON PREVIOUS PROJECT. THE | | RESUME' MUST BE ACCOMPANIED BY ALL CERTIFICATES AS | | SPECIFIED HEREIN. THE BUILDING OFFICIAL OR HIS DESIGNEE | | WILL REVIEW THE RESUME'. AFTER THE RESUME' IS REVIEWED, | | AN INTERVIEW WILL BE SCHEDULED. UNDER NO CIRCUMSTANCES | | WILL AN INSPECTOR BE INTERVIEWED FOR WORK WITHOUT FIRST | | MEETING THE ABOVE CRITERIA. | | | | E) NA | | | | F) NOTE FOR PAPER PLANS 3 SETS OF DOCUMENTS ARE | | REQUIRED. FOR DIGITAL PLANS, AFTER PERMIT ISSUANCE, | | PLEASE E-MAIL THE PERMIT LIBRARIAN OF THE PERMIT BEING | | ISSUED, THE PERMIT LIBRARIAN WILL THEN E-MAIL YOU THE | | APPROVED AND BATCH STAMPED PLANS SO YOU MAY PRINT YOUR | | PLANS, TWO SETS OF PLANS WILL NEED TO BE PRINTED IN | | COLOR, (1) FOR THE THRESHOLD INSPECTOR, THE OTHER FOR | | THE MEP INSPECTORS OTHER PLANS YOU WISH TO PRINT MAYBE | | IN BLACK & WHITE. | | | | 2010 WEST PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING | | CODE, CHAPTER 1, ADMINISTRATION, 110.3.7 THRESHOLD | | BUILDINGS, GUIDELINES AND POLICIES FOR PROJECTS | | CONCERNING SPECIAL INSPECTORS. | | | | G) 110.3.7.4.3 ALL SHORING AND RESHORING PROCEDURES, | | PLANS AND DETAILS SHALL BE SUBMITTED TO THE ENFORCEMENT | | AGENCY FOR RECORDKEEPING. EACH SHORING AND RESHORING | | INSTALLATION SHALL BE SUPERVISED, INSPECTED AND | | CERTIFIED TO BE IN COMPLIANCE WITH THE SHORING | | DOCUMENTS BY THE CONTRACTOR. | | | | H) PLEASE CALL THE CITY OF WEST PALM BEACH'S AUTOMATED | | TELEPHONE INSPECTIONS LINE (561) 805-6700) FOR ALL | | BUILDING INSPECTIONS FOR AUDITING OF JOBSITE | | INSPECTIONS WITHOUT THIS THE PERMIT EXPIRES IN 6 | | MONTHS, ABANDONMENT OF JOB, NO INSPECTION ACTIVITY. | | | | ITEMS A AND C MUST BE ADDRESSED PRIOR TO A PASSED | | BUILDING REVIEW. | | OTHER ITEMS ARE TO BE ADDRESSED PRIOR TO PERMIT | | ISSUANCE. RESUMES MAY BE SENT TO ME VIA EMAIL AT ANY | | TIME DURING THE REVIEW PROCESS FOR PRELIMINARY REVIEW, | | BUT ARE ALSO REQUIRED TO BE IN THE PROJECTDOX RECORD. | | |
|
|
Review Stop |
THRESHOLD |
THRESHOLD INSPECTOR DOCUMENTS |
Rev No |
1 |
Status |
F |
Date |
2017-12-11 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2017-12-11 |
Time |
06:22 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2017-12-11 |
Time |
06:22 |
Sent To |
|
|
Notes |
2017-12-11 06:22:04 | ****CORRECTIONS**** | | | | SAMANTHA HILL | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6724 | | | | FBC = FLORIDA BUILDING CODE, 5TH EDITION (2014) | | FBC B = FBC BUILDING | | FBC EB = FBC EXISTING BUILDING | | FBC A = FBC ACCESSIBILITY | | FBC EC = FBC ENERGY CONSERVATION | | | | THRESHOLD BUILDING / FL S. S. 553.71(7) "THRESHOLD | | BUILDING" MEANING ANY BUILDING WHICH IS GREATER THAN | | (3) STORIES OR 50 FT. IN HEIGHT, OR WHICH HAS AN | | ASSEMBLY OCCUPANCY CLASSIFICATION AS DEFINED IN THE | | FLORIDA BUILDING CODE WHICH EXCEEDS 5,000 SQ. FT. IN | | AREA AND AN OCCUPANT CONTENT OF GREATER THAN 500 | | PERSONS. | | | | A) 109.3.6.1 THRESHOLD INSPECTION PLAN. OK - SHEET | | S0.0.4. | | | | B) THRESHOLD INSPECTOR: WPB AMENDMENT 109.3.6.2 W.P.B. | | CONSTRUCTION SERVICES DEPARTMENT REQUEST FOR THRESHOLD | | BUILDINGS A SPECIAL INSPECTOR AS REQUIRED BY FL S S | | 553.79(5) FLORIDA STATUTES TO THE MINIMUM INSPECTIONS | | REQUIRED BY THIS CODE. THE THRESHOLD INSPECTION FORMS | | ARE REQUIRED TO BE FILED OUT BY ALL PARTIES WITH | | INTEREST, NOTARIZED AND RETURNED TO THIS OFFICE, AND | | REVIEWED AND APPROVED BEFORE PERMIT ISSUANCE WILL TAKE | | PLACE. CONTACT KEN CONRAD MANAGER OF THE SPECIAL | | INSPECTOR PROGRAM AT (561)805-6666 FOR FURTHER | | INFORMATION BEFORE THE PERMIT MAY BE ISSUED. | | | | C) THRESHOLD BLDG., REQUIRED STATEMENT W.P.B. AMENDMENT | | 110.3.7.4.4, FS553.79(7)(D): ALL PLANS FOR THE BUILDING | | WHICH ARE REQUIRED TO BE SIGNED AND SEALED BY THE | | ARCHITECT OR ENGINEER OF RECORD CONTAIN A STATEMENT | | THAT, TO THE BEST OF THE ARCHITECT?S OR ENGINEER?S | | KNOWLEDGE, THE PLANS AND SPECIFICATIONS COMPLY WITH THE | | APPLICABLE MINIMUM BUILDING CODES AND THE APPLICABLE | | FIRESAFETY STANDARDS AS DETERMINED BY THE LOCAL | | AUTHORITY IN ACCORDANCE WITH THIS CHAPTER AND CHAPTER | | 633. | | | | W.P.B. AMENDMENT 110.3.7.4.4 ALL PLANS FOR THE BUILDING | | WHICH ARE REQUIRED TO BE SIGNED AND SEALED BY THE | | ARCHITECT OR ENGINEER OF RECORD CONTAIN A STATEMENT | | THAT, TO THE BEST OF THE ARCHITECT'S OR ENGINEER'S | | KNOWLEDGE, THE PLANS AND SPECIFICATIONS COMPLY WITH THE | | APPLICABLE FIRE-SAFETY STANDARDS AS DETERMINED BY THE | | LOCAL AUTHORITY IN ACCORDANCE WITH THIS SECTION AND 633 | | FLORIDA STATUTE. | | | | I WAS ABLE TO LOCATE THE STATEMENT FROM THE STRUCTURAL | | ENGINEER, BUT WAS NOT ABLE TO LOCATE THE STATEMENT FROM | | THE ARCHITECT. PLEASE ADVISE OR REVISE PLAN TO INCLUDE. | | | | D) FOR THE SPECIAL INSPECTOR PLEASE PROVIDE A RESUME' | | OF INSPECTION EXPERIENCE ON PREVIOUS PROJECT. THE | | RESUME' MUST BE ACCOMPANIED BY ALL CERTIFICATES AS | | SPECIFIED HEREIN. THE BUILDING OFFICIAL OR HIS DESIGNEE | | WILL REVIEW THE RESUME'. AFTER THE RESUME' IS REVIEWED, | | AN INTERVIEW WILL BE SCHEDULED. UNDER NO CIRCUMSTANCES | | WILL AN INSPECTOR BE INTERVIEWED FOR WORK WITHOUT FIRST | | MEETING THE ABOVE CRITERIA. | | | | E) THE CONTRACTOR WILL PRODUCE A JOB SUMMARY OR HISTORY | | FOR THIS TYPE OF CONSTRUCTION. | | | | F) NOTE FOR PAPER PLANS 3 SETS OF DOCUMENTS ARE | | REQUIRED. FOR DIGITAL PLANS, AFTER PERMIT ISSUANCE, | | PLEASE E-MAIL THE PERMIT LIBRARIAN OF THE PERMIT BEING | | ISSUED, THE PERMIT LIBRARIAN WILL THEN E-MAIL YOU THE | | APPROVED AND BATCH STAMPED PLANS SO YOU MAY PRINT YOUR | | PLANS, TWO SETS OF PLANS WILL NEED TO BE PRINTED IN | | COLOR, (1) FOR THE THRESHOLD INSPECTOR, THE OTHER FOR | | THE MEP INSPECTORS OTHER PLANS YOU WISH TO PRINT MAYBE | | IN BLACK & WHITE. | | | | 2010 WEST PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING | | CODE, CHAPTER 1, ADMINISTRATION, 110.3.7 THRESHOLD | | BUILDINGS, GUIDELINES AND POLICIES FOR PROJECTS | | CONCERNING SPECIAL INSPECTORS. | | | | G) 110.3.7.4.3 ALL SHORING AND RESHORING PROCEDURES, | | PLANS AND DETAILS SHALL BE SUBMITTED TO THE ENFORCEMENT | | AGENCY FOR RECORDKEEPING. EACH SHORING AND RESHORING | | INSTALLATION SHALL BE SUPERVISED, INSPECTED AND | | CERTIFIED TO BE IN COMPLIANCE WITH THE SHORING | | DOCUMENTS BY THE CONTRACTOR. | | | | H) PLEASE CALL THE CITY OF WEST PALM BEACH'S AUTOMATED | | TELEPHONE INSPECTIONS LINE (561) 805-6700) FOR ALL | | BUILDING INSPECTIONS FOR AUDITING OF JOBSITE | | INSPECTIONS WITHOUT THIS THE PERMIT EXPIRES IN 6 | | MONTHS, ABANDONMENT OF JOB, NO INSPECTION ACTIVITY. | | | | ITEMS A AND C MUST BE ADDRESSED PRIOR TO A PASSED | | BUILDING REVIEW. | | OTHER ITEMS ARE TO BE ADDRESSED PRIOR TO PERMIT | | ISSUANCE. DOCUMENTS (SI AGREEMENT, RESUMES) MAY BE SENT | | TO ME VIA EMAIL AT ANY TIME DURING THE REVIEW PROCESS. | | |
|
|
Review Stop |
Z |
ZONING |
Rev No |
3 |
Status |
P |
Date |
2018-06-01 |
|
|
Cont ID |
|
Sent By |
aaponte |
Date |
2018-06-01 |
Time |
14:52 |
Rev Time |
0.00 |
Received By |
aaponte |
Date |
2018-06-01 |
Time |
14:52 |
Sent To |
|
|
Notes |
2018-06-01 15:35:19 | PROVISO: | | 1. PLEASE REVISE SHEET SP1.01 TO ADJUST THE NEW | | RESTAURANT NUMBERS BASED ON MINOR SITE PLAN AMENDMENT | | CURRENTLY UNDERWAY. ALSO, PLEASE INCLUDE THE TOTAL | | NUMBER OR RESIDENTIAL UNITS, AND HOTEL ROOMS PROVIDED. | | 2. PLEASE SUBMIT A SEPARATE LANDSCAPE PERMIT. | | 3. ADITIONAL DISCUSSION NECESSARY FOR THE PROPOSED | | CHANGES TO THE STREETSCAPE ALONG OLIVE AVENUE. FOLLOW | | UP E-MAIL SENT TO APPLICANT WITH RECOMMENDED | | MODIFICATIONS. | | 4. SHEETS A1.1.1, AND LH-1.01 DO NOT MATCH REVISED | | STREETSCAPE ALONG OLIVE AVENUE. | | 5. PHOTOMETRICS PROVIDED IN SHEET E1.1.1 SHALL BE | | DEPICTED IN THE SITE PLAN SO STAFF CAN CONFIRM THE | | ADEQUATE LOCATION OF THE LIGHT POLES IN THE PUBLIC | | REALM (RELATION TO CURB, TREES ETC). CONFIRM STREET | | FIXTURE IS DOWNTOWN STANDARD. EXISTING CONCRETE COBRA | | HEAD LIGHT POLES SHALL BE REMOVED AND REPLACED BY | | DECORATIVE. | | FOR ADDITIONAL INFORMAITON PLEASE CONTACT ANA MARIA | | APONTE AT 561-822-1439. |
|
|
Review Stop |
Z |
ZONING |
Rev No |
2 |
Status |
F |
Date |
2018-03-15 |
|
|
Cont ID |
|
Sent By |
aaponte |
Date |
2018-03-14 |
Time |
14:44 |
Rev Time |
0.00 |
Received By |
aaponte |
Date |
|
Time |
|
Sent To |
|
|
Notes |
2018-03-15 16:48:52 | 1. TO ENSURE THE INFORMATION FOR THE PROJECT IS | | CONSISTENT, IT IS IMPORTANT TO INCLUDE A FULL SITE PLAN | | THAT SHOWS THE 3 BUILDINGS PROPOSED FOR THE PROJECT IN | | ONE SITE PLAN. YOU CAN LABEL THE DRAWING MASTER SITE | | PLAN. PLEASE INCLUDE IN THIS SHEET THE FAR SUMMARY | | TABLE, INCLUDING THE GSF CALCULATIONS AND THE SUMMARY | | PARKING. THIS INFORMATION IS FOR THE ENTIRE PROJECT (3 | | BUIDLINGS) AND IT SHALL BE REPEATED IN THE THREE | | SEPARATE BUILDING PERMITS. TEH DATA CAN BE SEPARATED | | FOR EACH OF THE BUILDINGS. PLEASE INCLUDE, LANDSCAPE | | AND HARDSCAPE ELEMENTS. | | 2. PLEASE PROVIDE A SUMMARY SHEET WITH DIAGRAMS | | INDICATING THE AREAS CALCULATED FOR THE FAR. | | 3. PLEASE PROVIDE A SUMMARY SHEET CONFIRMING COMPLIANCE | | WITH THE ACTIVE USE REQUIREMENT AS APPROVED BY THE DAC. | | COMPLIANCE SHALL INCLUDE THE 3 BUILDINGS INCLUDED IN | | THE MASTER SITE PLAN. | | 4. CURB CUT FOR THE RESIDENTIAL LOADING SHALL BE | | ADJUSTED TO THE MAXIMUM 25 FEET WIDE PERMITTED. | | 5. PROPOSED ADA RAMP ALONG OLIVE AVENUE IS REDUCING THE | | WIDTH OF THE SIDEWALK TO 3.3 FEET. THE MINIMUM 6' WILL | | BE NECESSARY. | | 6. A MINIMUM OF 2 FEET WIDE PLANTING STRIP IS REQUIRED | | ADJACENT TO THE LOADING AND SERVICE AREA FRONTAGE ALONG | | 2ND STREET (DAC APPROVAL REQUIREMENT). | | 7. CANOPIES OR ANY OTHER ELEMENT ENCROACHING INTO THE | | ROW WOULD REQUIRE A ROW EASEMENT BEFORE FINAL CO ( | | RESIDENTIAL ENTRANCE CANOPY ALONG OLIVE AVE). | | 8. BUILDING SIGNS NOT INCLUDED IN THIS APPROVAL. | | SEPARATE PERMIT NEEDED. | | 9. PLEASE PROVIDE PHOTOMETRICS FOR THE SIDEWALK AREA | | AROUND THE BUIDLING, AND INCLUDE DETAILS WITH THE | | STANDARD LIGHT POLE AND FIXTURE.MINIMUM 0.6 FOOTCANDLE | | AT BACK OF CURB ONE FOOT ABOVE GRATE SHALL BE PROVIDED. | | LIGHTING CAN BE FROM STREET LIGHT OR FIXTURES ATTACHED | | TO BUILDING FACADE.LIGHT FIXTURE SHALL BE ALIGNED WITH | | TREE TRUNKS (2' FROM BACK OF CURB TO CENTER OF POLE). | | 10. PLEASE INCLUDE DETAILS FOR BIKE PARKING AND TOTAL | | NUMBER PROVIDED FOR PUBLIC BIKE PARKING AND PRIVATE | | BIKE PARKING. | | 11. PLEASE LOOK AT THE CLEAR WIDTH OF THE SIDEWALK | | ALONG BANYAN INMEDIATELY SOUTH OF THE RES ENTRANCE. | | THERE IS A PLANTING ARE NEXT TO THE BUILDING THAT CAN | | BE REDUCED TO PROVIDE THE 8 FEET SIDEWALK CLEARANCE | | RECOMMENDED. THE PLANTING AREA IS OVER 4 FEET IN WIDTH. | | FOR ADDITIONAL INFORMATION PLEASE CONTACT ANA MARIA | | APONTE AT 561-822-1439. |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
F |
Date |
2018-01-19 |
|
|
Cont ID |
|
Sent By |
AA |
Date |
2018-01-19 |
Time |
16:14 |
Rev Time |
0.00 |
Received By |
aaponte |
Date |
2018-01-19 |
Time |
16:14 |
Sent To |
|
|
Notes |
2018-01-19 16:28:27 | 1. PLEASE PROVIDE AN OVERALL GROUND FLOOR PLAN THAT | | INCLUDES SETBACKS, AND ALL LANDSCAPE AND HARDSCAPE | | ELEMENTS. | | 2. PLEASE PROVIDE AN FAR SUMMARY TABLE IN THE OVERALL | | GROUND FLOOR PLAN INCLUDING ALL THE GSF CALCULATIONS | | ACCORDING TO THE SITE PLAN APPROVAL. PLEASE INCLUDE A | | SUMMARY PARKING CALCULATION. | | 3. PLEASE PROVIDE A SUMMARY SHEET INDICATING HOW THE | | FAR WAS CALCULATED IN EACH OF THE FLOORS, INCLUDE THE | | ASSOCIATED DIAGRAM FOR EACH. | | 4. PLEASE INDICATE PROPERTY LINE AND SETBACK LINE ON | | ALL FLOOR PLANS AND ELEVATIONS TO IDENTIFY ANY POSSIBLE | | ENCROACHMENTS. | | 5. PLEASE INDICATE ALL MECHANICAL ENCLOSURES ON ROOF | | TOP AND INCLUDE A DETAIL INDICATING THE HEIGHT OF THE | | ENCLOSURE (ENCLOSURE SHALL BE AS TALL AS MECHANICAL | | EQUIPMENT). | | 6. PLEASE PROVIDE COLORED ELEVATIONS WITH THE CALL OUT | | MATERIALS (SUBMITTED DRAWINGS IS BLACK AND WHITE AND | | DIFFICULT TO IDENTIFY DIFFERENT MATERIALS). | | 7. PLEASE INDICATE THE CLEAR SIDEWALK ADJACENT TO THE | | RAMP SOUTH OF RESIDENTIAL ENTRANCE ON OLIVE AVENUE. CAN | | THE PARKING AREA BE REDUCED TO WIDEN THE SIDEWALK? | | 8. SIDEWALK ELEVATION SHALL BE MAINTAINED ACROSS | | DRIVEWAYS. PLEASE INCLUDE A NOTE ON CIVIL DRAWINGS. | | 9. PLEASE PROVIDE PHOTOMETRICS FOR ALL THE STREET | | LEVEL. MINIMUM 0.6 FOOTCANDLE AT BACK OF CURB ONE FOOT | | ABOVE GRATE SHALL BE PROVIDED. LIGHTING CAN BE FROM | | STREET LIGHT OR FIXTURES ATTACHED TO BUILDING FACADE. | | 10. PLEASE INCLUDE DETAILS TO INDICATE THE STREET LIGHT | | POLE AND FIXTURE ARE IN COMPLIANCE WITH DOWNTOWN | | STANDARD. LIGHT FIXTURE SHALL BE ALIGNED WITH TREE | | TRUNKS (2' FROM BACK OF CURB TO CENTER OF POLE). | | 11. ADA RAMP AT CORNERS SHALL BE LOCATED TO REDUCE THE | | DISTANCE OF PEDESTRIAN CROSSING ACROSS TRAVEL LANES. | | 12. PLEASE SUBMIT A SEPARATE LANDSCAPE PERMIT FOR STAFF | | REVIEW. STRUCTURAL SOIL IS REQUIRED AROUND ALL TREES. | | FOR ADDITIONAL INFORMATION PLEASE CONTACT ANA MARIA | | APONTE AT 561-822-1439. |
|
|
|