Plan Review Details - Permit 17010385
Plan Review Stops For Permit 17010385
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2017-08-16 Cont ID  
Sent By jwitmer Date 2017-08-16 Time 14:44 Rev Time 0.00
Received By jwitmer Date 2017-08-16 Time 14:24 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2017-05-31 Cont ID  
Sent By jwitmer Date 2017-05-31 Time 08:28 Rev Time 0.00
Received By jwitmer Date   Time   Sent To  
Notes
2017-05-31 08:28:29BUILDING PROVISO:
 PLUNGE POOL SERIES DESIGN & INSTALALLATION GUIDE &
 THERAPEUTIC PLUNGE POOLS
 A COPY OF THESE MANUALS SHALL BE ONSITE FOR ALL
 BUILDING AND PLUMBING INSPECTIONS.
 1/30/2017 BUILDING PLAN REVIEW J. WITMER

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2017-01-30 Cont ID  
Sent By jwitmer Date 2017-01-30 Time 08:33 Rev Time 0.00
Received By jwitmer Date 2017-01-30 Time 07:45 Sent To  
Notes
2017-01-30 08:33:15BUILDING PROVISO:
 PLUNGE POOL SERIES DESIGN & INSTALALLATION GUIDE &
 THERAPEUTIC PLUNGE POOLS
 A COPY OF THESE MANUALS SHALL BE ONSITE FOR ALL
 BUILDING AND PLUMBING INSPECTIONS.
 1/30/2017 BUILDING PLAN REVIEW J. WITMER

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2017-01-31 Cont ID  
Sent By vperez Date 2017-01-31 Time 08:26 Rev Time 0.00
Received By vperez Date 2017-01-31 Time 08:26 Sent To  
Notes
2017-01-31 08:26:47PROVISO: PLEASE PROVIDE SPECS ONSITE FOR INSPECTION
  
 V. PEREZ
 *6717

Review Stop G GAS REVIEW
Rev No 2 Status N Date 2017-08-15 Cont ID  
Sent By tklarge Date 2017-08-15 Time 09:50 Rev Time 0.00
Received By tklarge Date 2017-08-15 Time 09:50 Sent To  
Notes
2017-08-15 09:51:10THERE ARE NO GAS HEATERS ASSOCIATED WITH THESE THERAPY
 POOLS. TKL.

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2017-01-25 Cont ID  
Sent By tklarge Date 2017-01-25 Time 10:20 Rev Time 0.00
Received By tklarge Date 2017-01-25 Time 10:19 Sent To  
Notes
2017-01-25 10:21:44A GAS PLAN HAS NOT BEEN INCLUDED IN THIS SUBMITTAL
 PACKAGE. A GAS PLAN REVIEW HAS NOT BEEN PERFORMED AT
 THIS TIME. A GAS PERMIT IS REQUIRED FOR A CONTRACTOR TO
 PERFORM THE RELATED WORK. PROVIDE COMPLETE PLANS THAT
 REFLECT THE ENTIRE SCOPE OF GAS WORK TO BE DONE. WPB
 AMEND. TO FBC SEC.107.2.1.
  
 GAS APPLIANCES SHALL BE LISTED AND LABELED PER FBC-FUEL
 GAS SEC. 301.3.
  
 A SEPARATE PERMIT IS REQUIRED FOR THE GAS INSTALLATION.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date   Cont ID  
Sent By   Date 2017-08-16 Time   Rev Time 0.00
Received By cpuell Date 2017-08-04 Time 12:59 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2017-06-20 Cont ID  
Sent By lmarchan Date 2017-06-20 Time 12:48 Rev Time 0.00
Received By lmarchan Date 2017-05-22 Time 07:50 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2017-02-03 Cont ID  
Sent By ajones Date 2017-02-03 Time 15:43 Rev Time 0.00
Received By ajones Date 2017-01-18 Time 16:44 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2017-08-15 Cont ID  
Sent By ccole Date 2017-08-15 Time 10:58 Rev Time 0.00
Received By ccole Date 2017-08-14 Time 17:47 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2017-05-25 Cont ID  
Sent By ccole Date 2017-05-25 Time 13:00 Rev Time 0.00
Received By ccole Date 2017-05-25 Time 13:00 Sent To  
Notes
2017-05-25 13:06:561ST REVIEW FBC-2014 MECHANICAL
 PERMIT #17010385
 5/25/17
  
 RESULTS: DENIED.
  
 1) THE MECHANICAL PIT FOR THE HYDROWORX POOL REQUIRES
 VENTILATION PER THE SUBMITTED DESIGN AND INSTALLATION
 GUIDE (PAGE 6), AND SECTION 13 1720 OF THE PROJECT
 SPECIFICATIONS (PAGE 4, ITEM 31). PLEASE PROVIDE
 DETAILED DRAWINGS, VENTILATION CALCULATIONS, AND
 EQUIPMENT SCHEDULES AND SPECIFICATIONS.
  
 2) PROVIDE EQUIPMENT SCHEDULES FOR THE CHILLERS
 INDICATING THE MAKES AND MODELS OF THE UNITS, THE
 COOLING CAPCITIES, THE REFRIGERANT CLASSIFICATION AND
 QUANTITIES.
  
 3) SHOW THE CHILLED WATER PIPING RUNS AND PROVIDE
 DETAILS- TYPE AND SIZES OF CHILLED WATER PIPING, PIPE
 INSULATION TYPE AND THICKNESS.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  

Review Stop P PLUMBING
Rev No 3 Status P Date 2017-08-15 Cont ID  
Sent By tklarge Date 2017-08-15 Time 09:44 Rev Time 0.00
Received By tklarge Date 2017-08-14 Time 05:56 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status F Date 2017-06-01 Cont ID  
Sent By tklarge Date 2017-06-01 Time 07:45 Rev Time 0.00
Received By tklarge Date 2017-05-31 Time 15:09 Sent To  
Notes
2017-05-31 15:13:431) SHT.A2.613 & SHT. RP2.0 SHOW TWO WATER SUPPLIED
 CHILLERS IN THE EQUIPMENT PIT. THE WATER SUPPLY TO THE
 CHILLERS SHALL BE EQUIPPED WITH A BACKFLOW PREVENTER
 PER THE 2014 FBC- PLUMBING SEC. 608.3.
 2) SUBMIT A POOL PIPING PLAN VIEW THAT CLEARLY REFLECTS
 THE LOCATION OF THE MAIN DRAINS, SKIMMERS AND RETURNS
 FOR EACH PLUNGE POOL. WPB AMEND. TO FBC SEC. 107.2.1.
 3) PROVIDE THE TURNOVER RATE FOR EACH SPA ON THE PLANS.
 THE TURNOVER RATE FOR EACH SPA SHALL COMPLY WITH 2014
 FBC-BUILDING SEC.454.1.8.8.
 4) AUTOMATED OXIDATION REDUCTION POTENTIAL (ORP) AND PH
 CONTROLLERS WITH SENSING PROBES SHALL BE INSTALLED ON
 SPA POOLS TO ASSIST IN MAINTAINING PROPER DISINFECTION
 AND PH LEVELS. 2014 FBC-BUILDING SEC.454.1.8.12.
 5) THERAPY OR JET PUMPS SHALL TAKE SUCTION FROM THE
 COLLECTOR TANK. 2014 FBC-BUILDING SEC. 454.1.8.6.2,
 6) PROVIDE DETAILS FOR MAKEUP WATER. THE MAKEUP WATER
 LINE SHALL BE PROTECTED AGAINST BACKFLOW PER 2014
 FBC-PLUMBING SEC. 608.1.
 7) A FIXED THERMOMETER SHALL BE MOUNTED IN THE POOL
 RECIRCULATION DOWNSTREAM FROM THE HEATER
 OUTLET.THERMOMETERS MOUNTED ON HEATER OUTLETS DO NOT
 MEET THIS REQUIREMENT. 2014 FBC-BUILDING
 SECS.454.1.6.5.14, 454.1.8.1.
 8) THE FLOW VELOCITY IN SUCTION PIPING SHALL NOT EXCEED
 6 FT. PER SECOND. THE MAIN DRAIN SPECS SHOW 6.42 FPS.
 CLARIFY. 2014 FBC SEC. 454.1.6.5.8.
 9) PAGE 3 - UTILITIES SECTION OF THE HYDROWORX DESIGN
 GUIDE SPECIFIES THAT A MINIMUM 2 INCH WATER SUPPLY LINE
 WITH ANTI-SIPHON DEVICE BE CONNECTED TO THE
 RECIRCULATION RETURN LINE, A 3/4" DIAMETER HOSE BIBB
 WITH ANT-SIPHON IN THE POOLROOM AND A 1- 1/2 INCH OR 2
 INCH DIAMETER BUILDING LOOP LINE TO AND FROM THE WATER
 COOLED CHILLER. SUPPLY THIS INFORMATION/DETAIL FOR
 REVIEW. SUBMIT PLUMBING SCHEMATIC FROM HYDROWORX.
 10) INDICATE WHAT MEANS IS PROVIDED FOR DRAINING THE
 SPAS.
 11) PAGE 7 OF THE HYDROWORX DESIGN GUIDE RECOMMENDS
 INSULATION OF THE CHILLED WATER. PROVIDE DETAIL ON
 THICKNES OF INSULATION.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2017-01-25 Cont ID  
Sent By tklarge Date 2017-01-25 Time 08:57 Rev Time 0.00
Received By tklarge Date 2017-01-25 Time 06:08 Sent To  
Notes
2017-01-25 09:01:081) SUBMIT COMPLETE POOL PIPING DRAWINGS FOR ALL OF THE
 HYDROWORX THERAPY POOLS. WPB AMEND. TO FBC SEC.107.2.1,
 DRAWINGS SHALL BE SIGNED AND SEALED BY AN ENGINEER
 REGISTERED IN THE STATE OF FLORIDA.WPB AMEND. TO FBC
 SEC. 107.1.
 2) A PERMIT APPLICATION SHALL BE SUBMITTED BY A POOL
 CONTRACTOR CURRENTLY LICENSED IN THE STATE OF FLORIDA.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status N Date 2017-08-16 Cont ID  
Sent By cpuell Date 2017-08-16 Time 16:06 Rev Time 0.00
Received By cpuell Date 2017-08-16 Time 16:06 Sent To  
Notes
2017-08-16 14:45:328/16/2017 CHECKED ARCHITECTURAL AND STRUCTURAL SHEETS.
 OK/ JW.
2017-05-25 15:34:51NO MECHANICAL PLAN SHEETS TO CHECK
 CCOLE- 5/25/17

Review Stop Z ZONING
Rev No 1 Status P Date 2017-02-03 Cont ID  
Sent By ajones Date 2017-02-03 Time 15:42 Rev Time 0.00
Received By ajones Date 2017-02-03 Time 15:42 Sent To  
Notes
***NONE***