2020-05-22 16:58:13 | ZONING COMMENTS |
| 1. BIKE RACKS NEED TO BE INSTALLED. THE |
| RACK ORIGINALLY PROPOSED IN FRONT OF |
| SPINA?S OFFICE CAN BE MOVED TO THE OLIVE |
| AVE SIDE. RACK SHALL BE THE APPROVED |
| POST AND LOOP CITY STANDARD. THE WAVE |
| RACK IS NOT ALLOWED. RACKS SHALL BE |
| SPACE MINIMUM 30? FROM EACH OTHER, AND |
| THERE SHOULD BE A MINIMUM 30? FROM A |
| WALL TO THE POST. KEEP 8 FOOT CLEAR |
| SIDEWALK. |
| 2. PAINT ALL FIRE LINES AND FDC |
| CONNECTING LINES. SHOULD BE COLOR OF |
| BUILDING TO BLEND IN, BUT CHECK WITH |
| FIRE INSPECTOR. |
| 3. ALL LIGHT POLES AND FIXTURES ON THE |
| STREET MUST BE PAINTED BLACK. |
| 4. FINISH GROUND AREA INSIDE THE AREA |
| WITH THE FPL TRANSFORMER AND INSTALL |
| DECORATIVE PANELS ABOVE. |
| 5. MODIFY ENTRY FLARE TO GO FROM BOTTOM |
| OF TRANSITION CURB TO SIDEWALK IN A |
| STRAIGHT LINE NORTH SOUTH AS SHOWN ON |
| PLAN. |
| 6. THE BIKE RACKS FOR THE TENANTS INSIDE |
| THE BUILDING SHALL BE CHANGED TO A CITY |
| APPROVED MODEL. THE INSTALLED WAVE RACK |
| IS NOT ACCEPTABLE. |
| 7. STAIRS FOR COMMERCIAL BAY ON OLIVE |
| SIDE SHALL BE FINISHED. |
| 8. HEADER BAND FOR LOADING BAYS SHALL BE |
| PAINTED AND FINISHED AS BUILDING FA?ADE. |
| 9. BASE PLANTING ALONG THE NORTH SIDE OF |
| BUILDING SHALL BE INSTALLED ACCORDING TO |
| DAC APPROVAL. |
| 10. ROOF DRAIN ON NORTH SIDE OF BUILDING |
| SHALL BE FINISHED AND COMPLETED. |
| 11. THERE ARE TWO AREAS ALONG THE OLIVE |
| AVE. SIDE OF THE BUILDING THAT HAVE HAD |
| CHANGES BECAUSE OF THE RAMP AND |
| PLACEMENT OF DOORWAYS THAT WERE |
| ORIGINALLY INTENDED TO BE LANDSCAPE |
| AREAS THAT HAVE BEEN CONCRETED OVER. |
| THESE SHOULD BE CONVERTED BACK AND |
| PLANTED TO MATCH THE OTHER BASE |
| PLANTINGS. |
| 12. PAINT INTERIOR AT ENTRANCES TO |
| PARKING GARAGE TO 20 FEET IN AS REQUIRED |
| BY CODE. |
| |
| |