2016-12-21 13:01:44 | BLDG B ONLY |
| ALARM TEST FOR BLDG B WAS PRODUCTIVE, |
| HOWEVER COMPLIANCE IS NEEDED IN THE |
| FOLLOWING AREAS: |
| 1. INCREASE SPEAKER WATTAGE ON |
| NOTIFICATION APPLIANCES |
| 2. ROOM MPOE 11113 - CHANGE TO SPEAKER |
| STROBE |
| 3. ROOM 11115 - ON REVISED PLANS CHANGE |
| INDICATION TO SHOW A CEILING MOUNT |
| APPLIANCE |
| 4. ELECTRICAL ROOM 11120 - ADD SPEAKER |
| STROBE |
| 5. ADJUST DUCT DETECTOR ADDRESSES ON |
| REVISED PLANS |
| 6. ELEVATOR CONTROL ROOM AND ELEVATOR |
| RECALL (NOT YET INSTALLED) |
| 7. MENS LOCKER ROOM11102 ADD ON CEILING |
| MOUNT NOTIFICATION APPLIANCE IN SHOWER |
| AREA |
| 8. PRE-ACTION SYSTEM RELAY UNABLE TO BE |
| TESTED UNTIL PRE-ACTION SYSTEM AND PANEL |
| IS COMPLETE |
| 9. FIRE DDCV'S AND PIV'S MUST ALL HAVE |
| TAMPERS AS PREVIOUSLY DIRECTED |
| 10. NO NOTIFICATION APPLIANCES IN |
| STORAGE ROOMS ON MEZZANINE, HOWEVER |
| THERE ARE NOTIFICATION APPLIANCES IN |
| STORAGE ROOMS DOWN STAIRS (PLEASE |
| EXPLAIN INCONSISTENCY) |
| 11. NOTIFICATION APPLIANCE IN STORAGE |
| WAREHOUSE IS BENEATH 12' STORAGE LINE |
| WHICH MEANS THAT IT WILL BE COVERED BY |
| STORAGE. PROPOSE AREA TO RELOCATE. |
| CEILING MOUNT MAY BE THE BEST OPTION |
| 12. CONTRACTOR WAS ADVISED TO REVIEW |
| COMPLETE PROVISO FROM PLAN REVIEWER. |